AMC Conferance Ottawa 14. June 2001 UncertaintyManagement Johan Dovmark a Tool in RiskManagement.

Slides:



Advertisements
Similar presentations
PDSA Classroom.
Advertisements

Technology and the UKCS Delivery of PILOT targets depends critically on application of the right technology on the UKCS Many good examples on current projects.
Human Computer Interaction Research in the MIS Discipline Diane M. Strong Worcester Polytechnic Institute HCI Panel, AMCIS 2002.
Injection Moulding Technology
University of Southern California Center for Systems and Software Engineering Risk Calculation Case Studies CS 510 Software Engineering Supannika Koolmanojwong.
OMSAN LOJİSTİK. Top Management Program in Logistics & Supply Chain Management (TMPLSM) Production and Operations Management 7: Improving and Monitoring.
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
ENVIRONMENTAL BENEFIT COST ANALYSIS Traditional BCA Decision making without environmental values (too difficult to evaluate, subjective, irrelevant) Modern.
The Quality Improvement Model
The Quality Improvement Model
Risk analysis – FMEA Workshops. FMEA 1 Simple risk assessment process!!  Identifying risk  Simple method for grading risk  Determines appropriate risk.
Barry Murash MBBit Nortel 2007
Six Sigma What is Six Sigma?
Chapter 3.4 Properties of Log Functions Learning Target: Learning Target: I can find the inverses of exponential functions, common logarithms (base 10),
Chapter 9 The Performance Interview
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Improving Test Ratios Using Reference Multimeters.
Aero-structure Cost Estimation and Optimization Integrated KBE System Background This research focuses on thermoplastic aero-structure cost estimations,
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
1 Challenges in the Verification of Pre-Existing Aerospace Systems Jean-Baptiste Jeannin Challenges in the Verification of Pre-Existing Aerospace Systems.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Planning and Analysis Tools to Evaluate Distribution Automation Implementation and Benefits Anil Pahwa Kansas State University Power Systems Conference.
Global Forest Observations Initiative Methods and Guidance Portal SDCG – Oslo – 24 th October 2014.
Description of Work Objectives WP 8 serves to define the technical content of the VI for contact thermometry. It will contain a selection of guides to.
Laws of Logarithms 5.6. Laws of Logarithms O If M and N are positive real numbers and b is a positive number such that b  1, then O 1. log b MN = log.
Mahindra Satyam Confidential1 BASE TM Methodology Guide Quality Management System BASE TM Methodology - 17 Slides Continue Back.
CORPORATE STRATEGY Decisions about what markets to compete in Competing in these markets via existing operations, diversification, repositioning, Business.
Advance to the next slide when ready to start $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 Sample.
Understanding Intended and Unintended Variation Andrew Wray – June 17, 2013.
Federal Cybersecurity Research Agenda June 2010 Dawn Meyerriecks
New interesting concepts from ISO TC 213 ACMC Annual General Meeting June 14. – Ottawa, Canada Johan Dovmark, Novo-Nordisk - Medical Systems.
1 ACSF Test Procedure Draft proposal – For discussion OICA and CLEPA proposal for the IG Group ACSF Tokyo, 2015, June Informal Document ACSF
Environmental monitoring and information systems/SEIS Working Group on Environmental Governance and Climate Change 3 rd Meeting, June, Almaty, Kazakhstan.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
1 Value Techniques Experiences Attitude Keep walking.
Logarithms Laws of logarithms.
Using Total Quality Management Tools to Improve the Quality of Crash Data John Woosley Louisiana State University.
10.1 – Estimating with Confidence. Recall: The Law of Large Numbers says the sample mean from a large SRS will be close to the unknown population mean.
Fred Spiring The University of Manitoba & Pollard Banknote Ltd. Some Applications of Process Capability: Within a Six Sigma Philosophy.
DMAICTools.com thanks our industry partners for sharing their forms - use it, improve it, share it, send us back a better version!
Supplier Performance Development Process
HOW DO I RESEARCH? WITH GOOGLE OR A DATABASE. Database Professionally published information Identifiable authority Easy to search Quick access to reliable.
Software Flow Diagram GPS & You II. hyperlinking DNR Garmin Alone.shp UNH Cooperative Extension 2008.
Chapter One: Modern Project Management To determine what is a project. To understand the evolution of project management. To understand the importance.
Comments From School Case Studies “The importance of evaluation” “To inform teacher decision making and target setting” “Whole School focus – how and why.
1 Product Development Process Requirements Definition (Chap. 3) Conceptual Design (Chap. 3 and 4) Detailed Design (Chap. 5) Manufacturing (Chap. 7) Logistics,
The DMAIC Method
Adavanced Numerical Computation 2008, AM NDHU
Empirical risk minimization
Taming the Complexity of Artifact Reproducibility
CIRAS FINAL CONFERENCE
Commonwealth of Virginia Flow-Ecology
Mold development plan Part Design Review Before FOT
Using the voice of the customer to measure Quality
Pareto Charts Summary Process Steps
+  New Product Capable, fast and cheap Manufacturing Processes
Chapter 17 Section 2: Current.
MAIN 220 Purchasing Chris Miller 11/15/2018.
طرح شبكه و سيستم ارجاع در ايران
UWD Assurance Program Objective: Introduce CCC tool.
Unit 3 Review (Calculator)
Empirical risk minimization
MAIN 220 Purchasing 5/21/2019.
Deconstructing the Standard
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
Do not use a calculator for the following!!.
Pareto Charts Summary Process Steps
1 -: 8D Problem Solving Technique :- Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

AMC Conferance Ottawa 14. June 2001 UncertaintyManagement Johan Dovmark a Tool in RiskManagement

Flow and operations - TodayR&D Functional Req. GPS SpecProduction Manufactu- ring docu- mentation Production ComponentsQA+QC Part verification Type testing FTA, FMEA & Tolerance-stackup calculations etc. FR-Loop GPS-Loop

Decision base ! NNSupplier

Process Capability

Functional-characteristic LSLUSL Function 100 % 0 %

Capability difficult easy Functional need critical not critical Metrological focus Design target

$ T/20 Production costs Verification costs Total costs 2S U Costs

Optimum Uncertainty management Verification costs Production costs Total costs $ T/20 2S UTUT Verification costs Production costs Total costs $ T/20 2S UTUT Verification costs Production costs Total costs $ T/20 2S UTUT Time

Capability difficult easy Functional need critical not critical Metrological focus Design target

The 3. dimension Measurement uncertainty Small Large R&D focus Design target

R & D Future flow Functional Req. GPS Spec.Production Manufactu- ring docu- mentation Production ComponentsQA Part verification FTA, FMEA & Tolerance-stackup calculations etc. Functional parameters Capability Measurement uncertainty and cooperation Param. to be verified Type testing UTUT U corr. U spec. 1 U meas.1 U meas.2 FR-Loop GPS-Loop U spec. 2

Pareto’s Law: log N = log A + m log x Vilfredo Pareto (1897) The 80 / 20 - rule