Presented to 4th Annual Wholesale & Retail Trade Sector (WRT) Council Meeting January 27, 2010 Obstacles in Implementing Workplace Changes Obstacles in.

Slides:



Advertisements
Similar presentations
UMC for Consulting & Services. UMC UMC for Consulting & Services UMC Profile UMC Profile UMC Range of Consulting Services UMC Range of Consulting Services.
Advertisements

Preparing for Compliance Monitoring Reviews Understanding CMS Protocols Used by Review Organizations January 14, 2009 Presented by: Margaret deHesse, RN,
1. 2 RE Case Study What was the Project Objective? When did it all Start? What was the Plan? How did Negotiations take place? What were the Benefits of.
Mergers & Acquisitions The real success factor = 1,5 or 2,5? 1.
1 OSHA FEDERAL OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA) OF 1970 George Mason University College of Nursing and Health Science Regulatory Requirements.
The System Development Life Cycle
Addressing Fetal Alcohol Spectrum Disorder (FASD) in New Brunswick Stacy Taylor Department of Health January 24, 2012.
The findings and conclusions in this presentation have not been formally disseminated by the National Institute for Occupational Safety and Health and.
The findings and conclusions in this presentation have not been formally disseminated by the National Institute for Occupational Safety and Health and.
Benefits of Implementing a Safe Resident Handling Program in Nursing Homes Benefits of Implementing a Safe Resident Handling Program in Nursing Homes.
The Outsourcing Process
1 ISE Ch. 22 Managing an Ergonomics Program History of Ergonomics Programs  1993: OSHA Ergonomics Program Management Guidelines for Meatpacking.
Retail Organization and Human Resource Management
The Analyst as a Project Manager
Presents ACCESS SAFETY Occupational Safety & Health Training Project in partnership with: MIOSHA CET Division.
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Personal Selling Opportunities IN THE AGE OF INFORMATION C H A P T E R 2.
Creating a Winning E-Business Second Edition
What is VPP?? Voluntary Protection Program In 1982 OSHA wanted to recognize and partner with businesses or worksites that showed excellence in occupational.
Vern Anderson, Ph.D., Coordinator Retail Trades Occupational Health CDC/NIOSH Mike Leiner Manager Store Safety Target Corporation Successful Applications.
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
S/W Project Management
1 Internal Controls. 2 Example Internal Control Manual  Focused Assessment Exhibit 4A  /trade/trade_programs/audits/focused.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Basics of OHSAS Occupational Health & Safety Management System
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Fatality Assessment Control Evaluation May 25, 2005.
Managing a Successful Business Franchising a Starbucks Coffee Shop.
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
Clean, Green, and on the Same Team! How Economic and Workforce Development are Partnering to Serve an Emerging Regional Industry.
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
VPP Introduction Challenge for the Future of Safety Developed from VPP website information.
1. 2 Ergonomics 3 THE ERGONOMIC PROCESS There are two approaches to ergonomics:  Pro-active intervention (NIOSH Model)  Reactive intervention.
Ergonomics and Human Factors LECTURE 1. HISTORY OF ERGONOMICS  In the early 1900’s, the production of industry was still largely dependent on human power/motion,
2  Mission Statement.  Company’s overall purpose and direction, products, services and values.  Goals.  That accomplish the mission. E.g. 5 year plan.
Project Life Cycle – Project Initiation © Ed Green Penn State University All Rights Reserved.
1-1 Copyright © 2010 Pearson Education, Inc. Introduction and Early Phases of Marketing Research Chapter 1.
Building a Successful Health Management Strategy.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
1-1© 2007 Prentice Hall Chapter 1 Introduction and Early Phases of Market Research.
Wholesale and Retail Trade Sector NORA Liaison & Partnership Update June 16, 2010 Paul Schulte, Manager Vern Anderson, Coordinator Rashaun Roberts, Assistant.
Ergonomics. THE ERGONOMIC PROCESS What are two approaches to ergonomics?  Pro-active intervention (NIOSH Model)  Reactive intervention.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
The Value Driven Approach
Cooperative Programs: Working With OSHA Paula O. White Director, Cooperative and State Programs Occupational Safety and Health Administration National.
© 2015 SMG Health. All rights reserved. “SMG Health is committed to the enhancement of organisational health and wellbeing leading to improved individual.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
What would Mark Hutchinson Bring to your Sales Organization ?
Company: Cincinnati Insurance Company Position: IT Governance Risk & Compliance Service Manager Location: Fairfield, OH About the Company : The Cincinnati.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
The MFC/SPTF Awareness Raising Campaign How to present the Universal Standards to your MFI members and Network board Updated August 2013.
An Overview of VPP VPP Benefits What Happens When OSHA Comes Onsite for VPP?
Slide 1 Software Construction Software Construction Lecture 3.
Responsibilities of Sponsor, Investigator and Monitor
The System Development Life Cycle
Procurement Development Programs
Chairman of the Board and CEO,
Responsibilities of Sponsor, Investigator and Monitor
WELCOME.
Systems Analysis and Design in a Changing World, 4th Edition
an effective self assessment system
2 Selecting a Healthcare Information System.
Environmental Health and Safety (EH&S) Supplier Awareness Training
The System Development Life Cycle
By Jeff Burklo, Director
ApprenticeshipNC Regional Collaboration and Expansion Project
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Re-Purposing and Reusing Training Materials Online
Agenda • Introductions • Project Objectives • Project Steps
Presentation transcript:

Presented to 4th Annual Wholesale & Retail Trade Sector (WRT) Council Meeting January 27, 2010 Obstacles in Implementing Workplace Changes Obstacles in Implementing Workplace Changes Tim McGlothlin, MS, CPE Executive Director Jeff Hoyle, MS, CPE Senior Ergonomist & Research Liaison

Agenda Introduction to the Center Overview of the Demonstration project Partnership with the EASE Council Requirements for establishing a working relationship (partnership) with a sector business Status of the Center’s attempts to partner within this sector Vision of a successful project Potential long-term benefits

Who We Are Founded in 1994 Housed in the Edward P. Fitts Department of Industrial & Systems Engineering at NC State University The Center’s mission is to provide occupational ergonomics consulting, training programs, research, and cost-effective ergonomic solutions for corporations to support their ergonomics efforts. The Ergonomics Center has grown into a nationally recognized and respected organization specializing in the field of ergonomics.

Current Partnerships General Electric GlaxoSmithKline Gildan Duke Energy Evergreen Packaging (formerly Blue Ridge Paper Products) Starbucks Coffee ATI Allvac Eastman Kodak Training Partner of the Institute of Industrial Engineers

NIOSH Manual Materials Handling Demonstration Project

Project Overview We (ECNC) were awarded three NIOSH contracts to conduct demonstration studies of manual materials handling (MMH) equipment in three different regions of the U.S. (eastern, northern and southern). –Eastern potentials: Raleigh, NC –Northern potentials: VA, OH –Southern potentials: SC Demonstration studies take interventions that are generally accepted as beneficial and addresses their extension or adaptation to specific populations or settings. Goal: To demonstrate the efficacy of MMH equipment in the whole- sale and retail trade sector that will reduce the bending, stooping, and overhead reaching associated with loading and storing materials in either warehouses or retail stores where workers are stocking shelves or loading dollies, carts, pallet jacks, etc.

Project Overview ECNC has also partnered with the Ergonomic Assist Systems and Equipment (EASE) Council and Southworth Products Corp. who have agreed to donate MH equipment to host-sites. The EASE Council is one of 18 industry groups within the Material Handling Industry of America (MHIA), the leading non-profit trade association representing the U.S. material handling and logistics industry.

Project Overview The EASE Council is a resource for information, practices, equipment, and organizations that focus on ergonomics and improving the working interface between people and the materials they must move. Member companies includes those dealing with: –Adjustable Worker Elevation Platforms –Balancers –Lift Tables –Manipulators –Pallet Rotators/Inverters –Vacuum Assist Devices –Workstation Cranes

Project Steps Project ActivityStart DateDue DateDetails/ Results 1. Host Site Recruitment and Finalization of Project Logistics 1/1/102/1/10 Host site identified and basic time line for project implementation documented and approved by host site and NIOSH contact 2.Field Work: Pre-Intervention Data Collection  Understand problems specific to industry/application  Perform pre-intervention ergonomic assessments and time-study  Identify countermeasure achievement targets from assessments  Understand constraints in field 2/1/094/1/10 Document nature of the original job setting (pre-intervention) using:  Videotaping  Digital photos  Time studies  Basic risk factor assessments  Advanced assessments: o NIOSH Lifting Equation o Liberty Mutual Guidelines o Univ. of Michigan 3DSSPP  Document constraints and countermeasure achievement targets 3.Market / Product Review  Identify available countermeasure solutions on market 4/1/105/1/10Document available countermeasure options

Project Steps Project ActivityStart DateDue DateDetails/ Results 4.Solution Development  Direct involvement of host-site stakeholders to determine the most feasible and cost-effective solution  Partner with materials handling vendor  Trial materials handling solution  Customization of solution to fit application (if necessary) 5/1/106/1/10  Vendor identified  Equipment ordered and received  Provide details of manual materials handling equipment to be used  Provide basic information on method for evaluating intervention  Appropriate associates at host-site trained on proper use of MMH equipment  Developed usability questionnaire 5.Field Testing: Post-Intervention Data Collection  Testing of final solution(s) in field (usability testing)  Perform post-intervention ergonomic assessments and time-study 6/1/108/1/10 Document nature of the job setting (post- intervention) using:  Videotaping  Digital photos  Time Studies  Basic risk factor assessments  Advanced assessments (possibly): o NIOSH Lifting Equation o Liberty Mutual Guidelines o Univ. of Michigan 3DSSPP  Document performance to countermeasure achievement targets

Project Steps Project ActivityStart DateDue DateDetails/ Results 6.Final Report Development and Delivery  Detailed methods and project steps  Detailed pre- and post-intervention results (Ergonomics risk reduction, time saving, return-on-investment quantification)  Intervention details and specifications provided  Description of how interventions can be generalized to other WRT and industry sectors 7/1/109/1/10 Share results with host-site stakeholders Final report mailed to NIOSH contact (Vern P. Anderson) 7.Present Findings to NIOSH during CY2010 Meeting in Midwest CY2010 (TBD) Present findings and participate in panel discussion with other practitioners and representatives from business and labor

Requirements for Establishing a Working Partnership Establish Trust and Respect Early –This is critical since the researcher is basically asking the host-site to “share” company sensitive information –Clarify that NIOSH is responsible for research and not enforcement/compliance (that’s OSHAs responsibility) Build a Win-Win Proposition –NIOSH (researching organization) gets valuable data to share with WRT sector –Specific host-site and corporate host-company has identified areas with MMH opportunities and potential countermeasures to reduce exposure –Emphasize additional business metrics (besides injury risk reduction) are considered in project

Requirements for Establishing a Working Partnership (cont.) Clearly Define the Project Details –Scope of the project –Timeframe for completion (understand the need to stay away during certain holidays and/or busy times of the year) Keep Legal and Operations “Happy”…Let them know that the host-site can: –Remain anonymous in the published report –Review and request modifications to the final report prior to publication –Interface with the researcher to identify the area(s) of evaluation, dates for the on-site visit, with whom the researchers may interview, and assist in solution-development phase

Requirements for Establishing a Working Partnership (cont.) Keep Legal and Operations “Happy”…Let them know that the following can be furnished: –Statement verifying researchers liability insurance coverage –Contract/agreement between the researcher (Center) and the host- site detailing the issues listed in this segment Discussion Point: What is the proper response to a potential host-site that is concerned with its obligation to implement any or all of the recommendations summarized in the report?

Status of the Center’s Attempts to Partner within the WRT Sector First the strategy – Partner with one host-site in each of three store “types”: –Large Retail Grocery Chain (Food Lion, Kroger, and Harris Teeter types) –Large Volume Discount Chain (Wal-Mart, Target, and K-Mart types) –Large Home and Hardware Chain (Sears, Lowes, Home Depot types) Status per “type”: –Large Retail Grocery Chain - Partner confirmed –Large Volume Discount Chain - Close to confirming –Large Home and Hardware Chain - High level of interest with one firm but several issues to be resolved

Vision of a Successful Project Intervention(s) reduces ergonomics risk from HIGH to Low for targeted tasks (all body parts) Intervention(s) improves or maintains productivity/takt time for targeted tasks Intervention(s) results in positive usability feedback (from host-site associates) Intervention(s) demonstrates quality improvement of goods to consumers (↓ waste products) over trial period Intervention ROI potential in less than 1 year

Potential Long-Term Benefits Reduced lost work-time illnesses and injuries Reduced medical costs from such injuries/incidents Reduced workers’ compensation costs Reduced turnover and absenteeism Increased levels of productivity, efficiency, and quality Improved comfort and usability; reduced human error; increased reliability Reduced equipment costs Increased employee morale Inspectors and insurers expect it Discussion: Additional metrics?

That’s Basically Us and the Project in a Nutshell! Any Questions? Comments? Contact the Ergonomics Center or ON-FOR-ERGO