EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.

Slides:



Advertisements
Similar presentations
EPIC Calibration Meeting, Mallorca Update of EPIC pn noise suppression K. Dennerl, 2009 March 31 Mallorca, Spain, 2009 March 31 – April 1 EPIC Calibration.
Advertisements

EPIC Calibration Meeting, Mallorca Update of EPIC pn long-term monitoring K. Dennerl, 2009 March 31 Update of EPIC pn long-term monitoring Mallorca, Spain,
EPIC Calibration Meeting, Mallorca Low energy calibration with the Vela SNR K. Dennerl, 2009 March 31 Low energy calibration with the Vela SNR Mallorca,
EPIC Calibration Meeting, K. Dennerl VILSPA/Spain, 2003 Mar Temporal variation of the energy response determined with the internal calibration source.
% eff = (Wout / W in) *100 eff = (80 J / 100 J) * 100 = 80% W in = 75 N * 5 m = 375 J W out = 100 N * 3 m = 300 J eff = (300 J / 375 J) *100 = 80% W in.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal April ACIS Calibration: Recent Updates, Planned Updates, & Future Issues 2.E0102: Joint.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
Experience with combined Fe55/Vela SNR calibration - MOS Andrea Tiengo INAF, IASF-Milano In collaboration with: Mariachiara Rossetti (IASF-Milano) Martin.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept Temporal variation of the energy response determined with the internal calibration.
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 EPIC pn at low energies: LW mode Properties of EPIC pn at low energies: LW mode.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
The problem with double event patterns (M. Brusa, K. Dennerl – MPE) EPIC CAL/OPS meeting - MPE.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept offset map correction Spatial variation of the energy scale Energy correction for pixels.
EPIC Calibration Meeting, ESAC K. Dennerl, 2005 October 04 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn.
XMM EPIC MOS Steve Sembay MPE 04/05/06 The Effective Area of EPIC A comparison of MOS1, MOS2 and PN derived fluxes of 17 on-axis AGN.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC A time jump analysis on EPIC-pn with some side results Marcus G. F. Kirsch M.J.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Tuebingen 03/02/03-06/02/03 MOS Cooling Results and Current Response Both MOS Cameras.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 EPIC pn: Jumps in the energy scale Sudden jumps in the absolute energy scale and their origin.
The EPIC-pn spectral response Frank Haberl EPIC Cal meeting, Tübingen, February 2003 Status of the pn spectral response in SAS5.4.1 Latest developments.
Mallorca EPIC Cal Meeting - February 2005 Darren Baskill: XMM project: MOS monitoring.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept Spatial variation of the energy scale Energy correction for pixels with an incorrect.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 Adjustment of spatial gain variations Adjustment of spatial gain variations of EPIC pn.
EPIC Calibration Meeting, ESAC K. Dennerl, 2005 October 04 Adjustment of spatial gain variations Adjustment of spatial gain variations of EPIC pn.
Darren Baskill 1/10 Gain, CTI, & CTI by column.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Nov ACIS Calibration: Planned Updates & Future Issues 2.ACIS Operations: Controlling the.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 CTI.. update for EPIC pn EPIC pn: Update on the CTI, the absolute energy scale and the energy.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2005 February 1 Properties of double event patterns.
MPE EPIC Cal Meeting – May 2006 Darren Baskill: XMM project: MOS gain monitoring MOS.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 Suppression of the low-energy noise Suppression of the low-energy noise: an improved approach.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting Mallorca, Spain 26-27/10/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded.
The EPIC-PN response matrix - update Frank Haberl EPIC Cal meeting, VILSPA, March 2004 Known problems in PN6.6 / SAS6.0.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
EPIC Calibration Meeting, K. Dennerl VILSPA/Spain, 2004 March Detector noise & Vela observations application to Vela observations EPIC pn detector.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal October Comparison of RGS Model for 1E to the HETG data 2.BI CCD CTI Correction.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Ringberg 2-5/April/2002 Broad-Band MOS v PN Cross-Calibration Study •8 Observations.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal Update on ACIS Calibration 1) Update to the ACIS contamination model 2) Temperature-dependent.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
EPIC Calibration Meeting, Mallorca Origin of gain offsets K. Dennerl, 2008 April 8 Origin of gain offsets: new insights from eROSITA calibration Mallorca,
XIS FM sensors cal. report Hiroshi Nakajima XIS
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
EPIC Calibration Meeting, Madrid Experience with combined Fe 55 /Vela SNR calibration K. Dennerl, 2010 March 23 Experience with combined Fe 55 / Vela SNR.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Семинар-презентация. Типография ДЕАЛ – это: 12-летний опыт работы и репутация надежного партнера Высокие оценки качества нашей работы Готовность к сложным.
$200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200 $400 $600 $800 $1000 $200.
Experience with combined Fe55 / Tycho SNR calibration
X-ray CCD with low noise charge injection.
. - t !!l t. - 1f1f J - /\/\ - ' I __.
پایگاه داده فصل چهارم 21/35 نتیجه گیری نتایج آزمایش پایگاه داده مقدمه
EPIC Calibration & Operations Meeting
.. '.. ' 'i.., \. J'.....,....., ,., ,,.. '"'". ' · · f.. -··-·· '.,.. \...,., '.··.. ! f.f.
Update of EPIC pn long-term monitoring
Calibration Activities – the MOS perspective
Long-term trends in EPIC pn energy response
RESULTS FROM TYCHO SNR CALMEDIUM OBSERVATION
Presentation transcript:

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn Long-term behaviour of the CTI.. for EPIC pn

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Mn-K CTI CCD 1 - 6

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Mn-K CTI CCD

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Mn-K CTI Quadrant 0

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Al-K CTI Quadrant 0

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn f FF Mn-K FWHM CCD 1 - 6

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Mn-K FWHM CCD

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Mn-K FWHM Quadrant 0 column gains adjusted

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Mn-K FWHM Quadrant 0 column gains adjusted

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn f FF AL-K FWHM CCD 1 - 6

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn f FF AL-K FWHM CCD

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Al-K FWHM Quadrant 0 column gains adjusted

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Al-K FWHM Quadrant 0 column gains adjusted

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Mn-K Pos CCD 1 - 6

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Mn-K Pos CCD

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Mn-K Pos Quadrant 0 ± 5 eV 2005 Dec 20 – 2006 Jan 01

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Mn-K Pos Quadrant 0 ± 5 eV

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Al-K Pos CCD 1 - 6

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF Al-K Pos CCD

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF AL-K Pos Quadrant 0 ± 5 eV 2005 Dec 20 – 2006 Jan 01

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn FF AL-K Pos Quadrant 0 ± 5 eV

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Mn-K CTI CCD 1 - 6

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Mn-K CTI CCD

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Mn-K CTI Quadrant 0

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Mn-K CTI Quadrant 0 FF Mn-K CTI Quadrant 0

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Al-K CTI Quadrant 0

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn f eFF Mn-K FWHM CCD 1 - 6

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Mn-K FWHM CCD

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn f eFF Mn-K FWHM Quadrant 0 column gains adjusted

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn f eFF AL-K FWHM CCD 1 - 6

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn f eFF AL-K FWHM CCD

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Al-K FWHM Quadrant 0 column gains adjusted

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Mn-K Pos CCD 1 - 6

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Mn-K Pos CCD

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Mn-K Pos Quadrant 0 ± 5 eV

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Al-K Pos CCD 1 - 6

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF Al-K Pos CCD

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn eFF AL-K Pos Quadrant 0 ± 5 eV

EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 CTI.. update for EPIC pn