Next European Dipole (NED) Status Report Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS on behalf of the NED Collaboration CARE Steering Committee Meeting.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
3nd KEK-CEA Workshop on Superconducting magnets and cryogenics for accelerator frontier - 24/03/2009 Ceramic insulation for Nb3Sn accelerator magnets F.Rondeaux.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
MQXF Quench Protection Analysis HiLumi workshop – KEK, Tsukuba Vittorio Marinozzi 11/18/2014.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
CARE steering April 9th NED Status Report Thierry Boutboul (CERN) LPNHE 9 April 2008.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
CARE steering September 17th NED Status Report Thierry Boutboul (CERN) CERN 17 September 2008.
NED Status Report Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS Collège de France, Paris 23 February 2004 We now have a logo!
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
Superconducting Large Bore Sextupole for ILC
WUT Experience in Measurements of the Heat Transfer Thought SC Cable Electrical Insulation Jaroslaw Polinski*, Maciej Chorowski*, Michal Strychalski*,
Next European Dipole (NED) Status Report Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS on behalf of the NED Collaboration HHH General Meeting CERN 11.
Superconducting High-Field Accelerator Magnets: Status and Perspectives Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS on behalf of the NED Collaboration.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
October 30 th Advances in Heat Transfer in High Field Accelerator Magnet B. Baudouy CEA/Saclay - Dapnia/SACM Annual meeting CARE October.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
Workshop on Beam losses, heat deposition and quench levels for LHC magnets, Geneva, 3-4 March 2005 Liquid helium heat transfer in superconducting cable.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
AARD Sub-panel at Fermilab Feb , 2006 LARP Magnet R&D Program - S. Gourlay1 BNL -FNAL - LBNL - SLAC LARP Magnet R&D Program Steve Gourlay AARD Sub-Panel.
NED Status Report Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS CARE Steering Committee Meeting LPNHE 11 April 2006.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
Next European Dipole Insulation Development Simon Canfer, Elwyn Baynham, George Ellwood HHH Highlight Presentation at CERN, November.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
Next European Dipole (NED) Overview & Status Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS on behalf of the NED Collaboration CARE General Meeting CERN.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Title – xxxx 1 LARP & US-HiLumi Contribution to the Inner Triplet Quadrupoles G. Ambrosio Cost and Schedule Review CERN, March 9 th -11 th 2015.
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
15 Th November 2006 CARE06 1 Nb 3 Sn conductor development in Europe for high field accelerator magnets L. Oberli Thierry Boutboul, Christian Scheuerlein,
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
4/27/06 1 US LHC ACCELERATOR RESEARCH PROGRAM brookhaven - fermilab – berkeley - slac US LARP Inner Triplet Cryogenics and Heat Transfer LARP Collaboration.
Q4 MAGNETS FOR HL-LHC J.M. Rifflet, M. Segreti, E. Todesco WP3 - Q4 magnets for HL-LHC 5th Joint HiLumi LHC-LARP Annual meeting Research supported.
Next Steps in Magnet R&D Steve Gourlay LBNL EuCARD Workshop on a High Energy LHC Malta October 14, 2010.
CARE08, Dec , G. de Rijk, Summary report on NED activities 1 Summary Report on NED Activities Gijs de Rijk (CERN) on behalf of the NED collaboration.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
O. Kester, NuSTAR annual meeting, 27/02/2013
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Design ideas for a cos(2q) magnet
Final doublet: future activity plan
SLHC –PP WP6 LHC IR Upgrade - Phase I.
The R&D programme on High Field Magnets (HFM)
CSP 25th November 2010 Technical agreement number 3: overview
EuroCirCol: 16T dipole based on common coils
To be presented at Nb3Al R&D Review,
the MDP High Field Dipole Demonstrator
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
EuCARD2 WP 10.2 HTS Conductor
MQXF updates P. Ferracin October 9th, 2014.
I. Bogdanov, S. Kozub, V. Pokrovsky, L. Shirshov,
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

Next European Dipole (NED) Status Report Arnaud Devred CEA/DSM/DAPNIA/SACM & CERN/AT/MAS on behalf of the NED Collaboration CARE Steering Committee Meeting 5 September 2005

Some very good news… The DOE has agreed to fund the US-LHC Accelerator Research Program (LARP) with a budget of 11 M$ for FY06 (approved by Congress but not yet signed by the President. This budget level should be kept constant for a few years (until 2009?) For FY06, it will be divided up into 5 M$ for magnets, 4 M$ for accelerator-related R&D and 2 M$ for management (shared between FNAL, BNL, LBNL and SLAC). The goal of the magnet part of LARP is to build by 2009 one or two 4- m-long, 90-mm-aperture, 200 T/m quadrupole magnet prototypes. …for our American colleagues!

Some pretty sad news… The EUROMAG NEST Adventure proposal has been turned down by the EU on the ground that it was not “adventurous” enough… Hence, we are back to square one regarding the funding of the model magnet manufacturing and test… …for the NED collaboration!

NED Programme The NED Programme is articulated around four Work Packages and one Working Group 1 Management & Communication (M&C), 2 Thermal Studies and Quench Protection (TSQP), 3 Conductor Development (CD), 4 Insulation Development and Implementation (IDI), 5 Magnet Design and Optimization (MDO) Working Group. It is carried out by a collaboration made up of 8 institutes: CCLRC/RAL, CEA, CIEMAT, CERN, INFN/Genova and INFN/Milano, Twente University (TEU) and Wroclaw University of Technology (WUT).

M&C Work Package We have held three Steering Committee (SC) meetings since the beginning of the year –20 January at CERN –14 April at CERN –7 July at WUT Next SC meeting will be held at CERN during the CARE general meeting; next ESAC meeting will be held at CERN before or after the planned HHH/WAMDO (April 2005). Second quarterly report will be completed by the end of the week. All relevant documents are stored into EDMS and posted on the NED website

TSQP Work Package The TSQ Work Package includes two main Tasks – development and operation of a test facility to measure heat transfer to helium through conductor insulation (CEA and WUT; Task Leader: B. Baudouy, CEA), – quench protection computation (INFN-Mi; Task Leader: G. Volpini).

Heat Transfer Measurement (1/3) The first part of the Task was to design and build a new double bath cryostat. CEA wrote detailed specifications that were handed out to WUT in June WUT performed a call for tender in the Summer of 2004 and selected Kryosystem in Poland to manufacture the cryostat. Radiation shields Vacuum container Heat exchanger piping Heat exchanger Expansion valve Pumping He IIp He IIs LHe GHe Insert Cryogenic vessel He I Experimental volume Schematic of NED cryostat (courtesy F. Michel, B. Baudouy and B. Hervieu, CEA)

Heat Transfer Measurement (2/3) A first reception test of the cryostat was carried out on Kryostem’s premises the 3rd week of April 2005, which revealed a few problems. WUT reacted very promptly and worked in close collaboration with CEA to correct these problems. A second reception test was carried out the 2nd week of July 2005 (including thermal and leak tests in liquid helium at 4.2 K), which was deemed successful. The cryostat will be delivered to CEA/Saclay on 19 September, for final implementation and commissioning. The 6-month delay with respect to the initial schedule is not expected to any deleterious impacts on the overall NED Programme.

Heat Transfer Measurement (3/3) Lambda plate He II heat exchanger Cryostat with thermal shields Inner view of cryostat with Instrumentation (Courtesy M. Chorowski, WUT)

Quench Computation (1/3) INFN-Mi has undertaken a detailed analysis of the thermal and electrical behaviors of NED-type accelerator magnets during a quench. The computation was started considering the “conservative”, 88-mm- aperture, cos , layer design developed by D. Leroy. It studied the influence of – magnet length (1, 5 and 10 m), – operating current (15, 22 and 29 kA), – external dump resistance (15, 25 and 35 m  ), – quench detection delay (30, 40 and 50 ms), – quench protection heater length. It also compared the results obtained by two different codes: QLASA at INFN-Mi and QUABER at CERN.

Quench Computation (2/3) The results show that, for the entire parameter space, the magnet is quite safe to operate, thereby justifying the choice of wire and cable parameters made early on. Quench simulation results on 10-m-long, 88-mm-aperture, cos , layer design (Courtesy M. Sorbi INFN-Mi)

Quench Computation (3/3) Similar computations have now been started on the more “innovative”, 160-mm-aperture, slot design also proposed by D. Leroy. The quench computation task is near completion. 88-mm-aperture, layer design (Courtesy D. Leroy, CERN) 160-mm-aperture, slot design (Courtesy D. Leroy, CERN)

CD Work Package The CD Work Package includes two main Tasks – conductor development (under CERN supervision; L. Oberli has now taken over D. Leroy as the official Task Leader), – conductor characterization (CEA, INFN-Ge, INFN-Mi, and TEU; Task Leader: A. den Ouden, TEU). It is the core of the programme and absorbs about 70% of the EU allocated funding.

Conductor Development (1/2) As a conclusion of preliminary design studies carried out in 2003 and 2004 under the supervision of D. Leroy, the following specifications were derived for NED Nb 3 Sn strands – diameter mm, – eff. filament diameter< 50  m, – Cu-to-non-Cu ratio1.25 ± 0.10, – filament twist pitch 30 mm, – non-Cu J C 1500 A/mm K & 15 T, – minimum critical current1636 A at 12 T, 818 A at 15 T, – N-value> 30 at 4.2 K and 15 T, – RRR (after heat treatment)> 200. (It is also requested that the billet weight be higher than 50 kg.)

Conductor Development (2/2) Based on these specifications, a call for tender was issued by CERN in June 2004 and two contracts were awarded in November to 2004 to Alstom/MSA in France (“Enhanced Internal Tin” process) and SMI in the Netherlands (“Powder in Tube” Process). After discussion with CERN, the two companies agreed to work out their development program into two successive RD Steps (referred to as STEP 1 and STEP 2) followed by final cable production. A tentative schedule was established as follows – STEP 1: Summer 2005, – STEP 2: Summer 2006, – Final production: December 2006.

Conductor Characterization (1/2) The NED-type conductor characterization represents a real challenge, given the unprecedented performances that are expected (e.g., a critical current of ~1600 A at 4.2 K and 12 T on a 1.25-mm wire, to be compared to the timid ~200 A presently achieved on 0.8 mm ITER wires). To validate sample preparation and measurement processes, the laboratories involved (CEA, TEU and INFN) have launched a cross- calibration program reminiscent of the ITER/EDA cross-calibration program carried out in the mid-1990’s. Since the Summer of 2004, three rounds of calibration wires have been prepared and circulated among the various partners.

Conductor Characterization (2/2) SMI/Toshiba Test Wire (results are within 2%) TEU and INFN have now achieved a good convergence. The problems at CEA have been identified and are being solved. All 3 partners should be ready when the first wires become available. (Courtesy T. Boutboul, CERN)

FE Wire Model In Parallel, INFN-Mi has started to develop an ANSYS model of an “un- reacted,” Alstom/MSA-type wire so as to simulate cabling effects. Running such a computation requires a detailed knowledge of the mechanical properties of the materials making up the wire (in the cold work state where they end up prior to the cabling operation). To determine these properties, CERN has carried out a series of nano- indentation and micro-hardness measurements on various wire samples, and compared the results with available literature data. The next step is to apply this model and the appropriate mechanical properties to the wire layouts presently considered by Alstom/MSA.

IDI Work Package The IDI Work Package includes two main Tasks – studies on “conventional” insulation systems relying on ceramic or glass fiber tape and vacuum-impregnation by epoxy resin (CCLRC; Task Leader: E. Baynham), – studies on “innovative” insulation systems relying on pre- impregnated fiber tapes and eliminating the need for a vacuum impregnation (CEA; Task Leader: F. Rondeaux).

Conventional Insulation (1/2) CCLRC and CEA have developed in collaboration an engineering specification (issued in July 2004) and a coordinated test programme (issued in October 2004). Since then, CCLRC has carried out a number of screening tests of candidate materials. The tests are applied to standardized laminates representative of inter- turn insulation and include – electrical breakdown test, – short beam shear test, – inter-laminar fracture test. Precrack (release film) Crack growth from test Example of Double Cantilever Beam (DCB) fracture test (courtesy S. Canfer, CCLRC)

Conventional Insulation (2/2) CCLRC has also investigated the issue of “sizing” (a lubricant, usually organic, coated onto the fibers of tapes, that need to be removed prior to conductor wrapping and winding, thereby rendering the fiber tape fragile and easy to tear off). Very promising results have been obtained with an improved polyimide sizing, produced by Hydrosize, NC, and applied by JPS, SC, which seems to be able to sustain the required Nb 3 Sn heat treatment without carbonization (thereby eliminating the need for “de-sizing”). More complete evaluation tests are underway.

Innovative Insulation The work on innovative insulation has not started yet, pending the hiring of a technician at the CEA chemistry laboratory, which has been delayed until early next year. To compensate for this lack, it was decided last spring to reallocate the EU funding of this task to hire a postdoc at CEA. A candidate has been identified, who is expected to start working this fall. The timing of this task is now becoming critical with respect to the overall NED program.

MDO Working Group (1/3) The MDO Working Group is made up of representatives from CCLRC, CEA, CERN and CIEMAT, under the Leadership of F. Toral, CIEMAT. Its main charge is to compare different magnet configurations so as to assess their efficiency in terms of manufacturability, performance and cost. Cos  layer design (courtesy D. Leroy, CERN) Intersecting-Ellipses design (courtesy H. Felice, CEA) Motor-type design (courtesy F. Toral, CIEMAT)

MDO Working Group (2/3) In parallel, work is pursued at CERN so as to optimize the baseline, 88-mm-aperture, cos  layer design with respect to – conductor geometry, – iron shape (to reduce saturation effects), – ferromagnetic shims (to compensate magnetization effects). (courtesy N. Schwerg, CERN)

MDO Working Group (3/3) CCLRC/RAL is also developing a 2D ANSYS model of the 88-mm- aperture, cos  layer design so as to optimize mechanical support. This model includes “sub-models” of individual coil turns to compute peak stresses in cable strands and cable insulation. Von-Mises Stress in Cable 0 MPa < σ Von-Mises < 180 MPa Circumferential Stress in Insulation -105 MPa < σθ < -35 MPa Plane-stress with ½ unit thickness Generalised plane-strain Contact elements (courtesy P. Loveridge, CCLRC)

Conclusion A great deal of progress has been made since my last presentation (at the CARE general meeting in Hamburg last year), leading to a number papers presented at various conferences (1 at CEC/ICMC, 1 at EUCAS and 4 at MT). The cryostat for heat transfer measurements is completed and will be delivered to CEA next week. The next few months will be critical for the Conductor Development program with the results of the STEP 1 wires. The only Task that has not started is the Innovative Insulation Task at CEA, but the hiring of a Postdoc should help. The funding of the model magnet manufacturing remains an open question.