L2 L3 CMS tracker manager meeting 11-12 June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Module Long term test activities University.

Slides:



Advertisements
Similar presentations
Source Driver Status CMS Week November 2007 P. Debbins University of Iowa.
Advertisements

Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Link Board Upscope Frascati group Napoli group Warsaw group.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Emulsion quality WG2 report Thanks to all the OPERA colleagues who are engaged on handling and developing emulsion.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Technical Support Activities in PH-ADO-PO
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Silicon Module Tests The modules are tested in the production labs. HIP is is participating in the rod quality tests at CERN. The plan of HIP CMS is to.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
G.W.Faber ETH-Z june'08 EMDb and “As Build” data Integration EMDb (S.B.) As Build CMS v n (J.B. / G.D.) v 2 (F.V.) v 1 Approvals Change control Version.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Status report of test procedures for the readout pixel chips in Catania F.Riggi ITS Meeting, June 2002.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
1 FLITECAM April 28, 2009 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
WLCG Service Report ~~~ WLCG Management Board, 31 st March 2009.
TBTS Test Program & Schedule G. Riddone
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
September 7, 2004Si VTX Strip Overview1 Overview of VTX Strip Group Activities Abhay Deshpande SUNY-SB For Si Strip Group.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
11/01/2012B.Couturier - Core Software Workshop 1 Software Development Infrastructure Main Topics Development tools Build and Release tools Tracking/Management.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
July 19, 2012 Anna Peisert1 CERN/Taiwan/Helsinki production center Work share Institutes/people Status of preparations.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
O. Kester, NuSTAR annual meeting, 27/02/2013
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
UCSB Testing Status Anthony Affolder
CMS Goal of the experiment
X-ray Pump-Probe Instrument
US Module Testing Progress Report
HL-LHC upgrade at IPHC news
US Module Testing Progress Report
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Module Long term test activities University Antwerp CMS tracker L2 L3 meeting, CERN, June 2001

L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd List of responsibilities: 1. Production tasks: • Long term test of modules • mile stone 200 phase • from production start to middle summer 2002 ( L3: W. Beaumont) • long term petal test • from summer 2002 until end of production together with IIHE Brussels (P.Vanlaer, W.Beaumont, C.Vander Velde) It is not foreseen for the moment to have petal long term test and module long term test at the same time. With the available man power and infrastructure we can handle this if needed.

L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd • 28 m 2 Class clean room (September 2001) (module testing and storage, diagnosis) • Ultra dry air facility 200 l/h for cold box (September 2001) Now with nitrogen. Infrastructures: Instrumentation : • for incoming modules Cupboard. • long term storage for tested modules Not defined yet. Reserved 3m 2 for this ( ~ CHF 2500) Storage : • test setup see list. • Microscope

L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Long Term Test Setup items

L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Human resources Senior Physicists • V. Zhukov (0.5 FTE) 1) data quality checks, data base investigation of possible failures Engineers : • W. Beaumont ( 0.4 FTE) 1) supervision, logistics investigation of possible failures • E. de Langhe operation and maintenance of test system Technicians : Open position (1 FTE ) operation of test station, data logging and module handling. 1) Not including general development and maintenance of the long term test setup software.

L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Money resources Status test setup and activities Long term module test : • Setup is running with prototype cold box and "alpha" version of the software. • Connections to database in advanced phase • Finalizing software. • Ready to do long term module test for one or two module with the existing system when UTRI boards available • Procurement of standard items before September No core money will be requested to complete the foreseen module long term setup.

L2 L3 CMS tracker manager meeting June W. Beaumont Universiteit Antwerpen 6/10/01 l2l3UAjune2001b.sdd Concerns • No modules available to commissioning the test setup. Grounding problems can be a problem. Hope experience with the system test setup at CERN will give hints how to tackle the problems • Designs transportation plates, boxes are not frozen in detail. Can have consequences for the mechanics of the cold box • Delivery of cold box for 10 modules can be delayed • Control of our CAEN HV system (old controller )