CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

WDS Status Propose to create 6 sub-collaborations Propose to create 6 sub-collaborations Sub-collaborationSummary of Task 1Proton DriverDefinition of critical.
Neutrinos in CHIPP Allan Clark Neuchâtel Meeting June 2004.
14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
CARE06, 17 Nov 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Eurisol User Group, 14 Jan 2008V. Palladino ν beams: prospects today & synergies with Eurisol" Neutrino beams: prospects today & synergies with Eurisol.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Welcome to the First Meeting of the An International Scoping Study of a Neutrino Factory & Super-beam Facility.
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions.
Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
Alain Blondel Neutrino physics in Switzerland collaborate among ourselves and in Europe to ensure a rich programme collaborate in T2K leading role in GLACIER,
ICL, 7/1/2010,UKNF Collaboration MeetingV.Palladino Status and Plan for FP7-NEU Status and Plan for FP7-NEU2012 the Accelerator Neutrino Network.
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
SPC 17 March 2009 Alain Blondel European Neutrino Oscillation Experiments Towards a roadmap.
ISS After One Year Peter Dornan Imperial College London.
European design study on Neutrinofacilities - Euronu within FP7.
CARESGV. Palladino: Status Report from BENE Status Report from BENE V. Palladino, CARESG, College de France, Sep BENE established on.
Introduction to BENE08 fifth & last BENE workshop Tuesday Dec 2-3 CERN meeting focusing on the BENE Final Report to be published as a CERN Yellow.
Networking Activity on Beams for European Neutrino Experiments BENE-Next ….. MEGLIO? Motivation Work Packages Partners & resources First ideas for the.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
WP4 - Design Studies. Outline Status of FP6 Design Studies Consequences High power targets MICE Neutrino detector R&D FFAGs WDS Status.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
Alain Blondel. AIDA-Neutrino meeting AIDA Neutrino detector studies 1. News from the neutrino scene 2. Beam requirements for AIDA 3. Discuss.
CARE07, 31 Oct 2007V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
WG3 – Part 3 - Design Studies Introduction Introduction View from Europe - RE View from Europe - RE “ “ Japan- Yoshi Kuno “ “ Japan- Yoshi Kuno “ “ US-
Preparation of design study ICL May 2005 accelerator Alain Blondel ECFA/BENE Future Neutrino Beam studies Towards a comparison of options on equal footing.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
The ISS Peter Dornan Imperial College London. 16 March 2006P Dornan - MUTAC `atmospheric’`solar’ `cross/reactor’ Oscillation defined by 3 mixing.
J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Neutrino Factory R&D in Europe Rob Edgecock/RAL. Outline Introduction i.e. what has happened since last year European feasibility study Proton driver.
Harold G. Kirk Brookhaven National Laboratory Accelerator and Beams Working Group 3 NUFACT06 Irvine, Ca. August 24-30, 2006 Conveners: R. Garoby, H. Kirk.
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
Neutrino Factory Design Study Introduction Introduction World Design Study status World Design Study status EC Framework 6 Design Studies EC Framework.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
CERN, 27/11/2009,86th Plenary ECFAV.Palladino Status and Plan for FP7-NEU Status and Plan for FP7-NEU2012 the Accelerator Neutrino Network in the.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
CARE05, 25Nov2005V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
Conclusions and thanks
Accelerator R&D for Future Neutrino Projects
CSN2 INFN, 26 Sep 2011 “BENE”, V. Palladino
The Way Forward ISS to IDS
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
Milestones & Deliverables BENE III period Jan 06 - Jun07
FP6 Design Studies ESGARD meeting 3rd September – from Roy Aleksan
ECFA recommendations (September 2001:)
XVth International Workshop on Neutrino Factories, Betabeams and Superbeams LAGUNA-LBNO Many thanks to D. Duchesneau, F. Di Lodovico, T. Patzak, A. Rubbia.
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road map for accelerator based neutrino programs in Europe A complex multi-parameter problem International Design Studies of future Neutrino facilities (IDS) FP7R&D program(s) of next European Accelerator Neutrino Facility “Euro ν” in world wide collaboration IDS

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Since CARESG Apr 11 Joint BENE & 3rd ISS meeting RAL Apr 28 April LOI !!!! BENE Midterm Report gets yellow in May Open BENE SG 4 Jul CERN (FP7) CERN Council Strategy Document 4th meeting of the ISS at UCI (21-23 Aug) NuFact06 (24-30) “End” of the ISS, next steps

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Int. Scoping Study(*) Design Study BENE : the longer term plan CDR … at the time of end of LHC payment first LHC results ILC decision be ready to catch any construction window Physics feasibility Feasibility & TPW HIPPI, HARP MERIT MICE PRISM, EMMA NB Betabeam CDR End 2009 ! Construction window

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Milestones & Deliverables BENE III period Jan 06 - Jun07 BENESG 1/ month Jan Feb Mar Apr May Jun Jul Aug Sep Nov Dec Jan Feb Mar Apr May Jun NNN06, Seattle Open SG, CERN NBI, CERN ISS/IDS, 21-22

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities NuFact06 NuFact high energy stategy.1 Mton magnetic detector NNN06 Betabeam/SuperBeam low energy strategy Megaton Water (HyperK, UNO, Memphys).1 Megaton Li-Ar Japan, DUSEL ….. Frejus, Gran Sasso +FNAL USNF,UKNF..

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities stronger BENE SG PHYSICS Mezzetto (Padua) + Donini (Madrid) DRIVER Zito (CEA) TARGETBennet (RAL) COLLECTION Dracos (IN2P3) NOVEL BEAMS MUFRONT Long (ICL) MUEND Meot (CEA/IN2P3) BETABEAM Lindroos

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities what have we got in Europe? how much is that worth? the CNGS OPERA Icarus BENE and HIPPI ISS Groups HARP MICE MERIT Betabeam DS Laguna SPL CDR2 The CERN Council Strategy Document

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities The CNGS has started

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Preliminary Courtesy P. Sala and E. Gschwendtner μ/p just about right High intensity mid october Thanks, Malika & Konrad et al. !

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities OPERA : it is worth silver (  detection ) ν μ /ν e →ν  t

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities ICARUS & beyond …. worth platinum νμ→νeνμ→νe

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Within CARE (ECFA) 3 Networks BENE A new accelerator neutrino facility? and 4 “JRAs” HIPPI CARE Coordinated Accelerator R&D in Europe

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities BENE/CARE rooted in the Muon Study Groups, active since 1998 the UKNF includes new Cockroft & Adams Institutes! France: CEA, CNRS-IN2P3 Germany: TUM, GSI, FZJ Spain : CSIC + Universities Italy :INFN Labs & Universities UK : CCLRC & Universities B : Louvain CH : PSI & Universities CERN worth travel money hopefully the embryo of a real continental collaboration NB : HIPPI is worth a lot 3.6 M from EC only

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Betabeam Design Study worth several M (1 from EU, within Eurisol) echo of progress at Nufact06 with Fabich’s plenary talk and

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Nobel class contribution: superior production of Li & B parents C. Rubbia

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities ISS Detector Group : worth gold? Blondel, Soler Super Minos, INO ……….. Hyper-CDHS νe → νμνe → νμ

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities ISS Physics Group : ISS Accelerator Group : EU effort not yet adequate UKNF, CEA …… we need the CERN divisions very solid: Long ….. Donini, Gomez-Cadenas, Hernandez, Huber, King, Lindner, Mezzetto, Winter & many more boosted the work of comparison, systematics included

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Superconducting Proton Linac (SPL) : CDR2 5 GeV appear possible a 4 MMW Backbone

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities At last, large angle data from HARP

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Muon Ionization Cooling Experiment at RAL Muon Ionization Cooling experiment at RAL

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Pivot Target & Collection CERN PS Experiment can we digest the MMW?

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities The CERN Council Strategy Process Almost one year long Two CERN task forces PAF = proton accelerators for the future POFPA = physics opportunities of future proton accelerators ……many other input from all sectors in Europe Orsay Preparatory Open Symposium Jan 30-Feb1 Zeuthen Closed Meeting of the strategy group May 2-6 Special session of Council in Lisbon Jul 14

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities BENE’s document to Council outline and plea for a timely R&D program CERN Yellow Report available at

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities nice words…. but, any place for ν’s in PAF? HIPPI +FETS

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities nice words …. but, Єuros from labs, agencies and EC? creation of a continental collaboration with a leading CERN kernel with regular and adequate participation & funding from each national lab and national agency richness of options makes consensus more laborious NB legitimate different scientific interests do exist need an unprecedented level of coherence & good will otherwise ….. LHC upgrade, ILC, CLIC ….

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities ISS (and IDS) in a nutshell Physics boosted comparison unprecedently, including systematics Accelerator updated NuFact Baseline, defined R&D priorities started exploring sinergies with Superbeams Detector rejuvenated simulations, established baselines for the few main options, defined R&D priorities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Set one up in Europe! OK !!! OK OK? FP7 EU ν Collaboration

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities a European Neutrino Oversight Body for BENE and future initiatives to report to to bring about the indispensable consensus PAF shows the way MMW Driver, Target, Collectors ….. everybody needs them Present highest priority aim: need advice & help of CARE & ESGARD

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Reserves

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities A complete Euro-Neutrino Design Study physics, accelerators, detectors, baselines ISS= International Scoping Study … American and Asian collaborations as full partners June 2005 to late 2006: mostly neutrino factory & superbeams define priorities and ways of Design Study consolidate regional & international collaboration us in EU, gain support of Council and ECFA IDS = International Design Study (neutrino factory & superbeams & betabeam) start late 2006 or early 2007 achieve higher funding, start design effort us in EU, prepare FP7 Proposal (March 2007, it seems) structure EU collaboration, get CERN involved as much as possible FP7 DS = EC (support for EU effort in the) Design Study … CNGS & beyond aiming at first EC funds Jan 1, 2008 inter-twined with IDS keeping American and Asian collaborations as full partners …. T2K, Nova Goal: Conceptual Design Report of a European Precision Neutrino Facility by end 2010 is next natural step for accelerator ν ISS & IDS/FP7 DS BENE CDHS CHARM I/II CHORUS NOMAD OPERA ICARUS

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities conceptual feasibility study of the following components: a high power proton driver of at least 4-5 GeV the engineering of the handling, containment and safety aspects of a hi power target & collection station a performing and cost effective muon phase rotation and cooling channel non-scaling FFAGs for acceleration of muons (and possibly protons) an optimised storage ring for muons higher intensity and higher gamma beta beams technical preparatory (R&D) projects, aiming at demonstrating: the existence of at least one adequate choice of target an extended lifetime of the horn prototypes at high rate and radiation muon ionization cooling, by completion of the MICE experimental program operation of a non-scaling FFAG RF cavities and kicker magnets for fast manipulation of muon beams + specific detector R&D and design efforts on : photo detector development for very large far detectors developments of the liquid argon technique including the presence of magnetic field study and tests of a magnetic calorimeter susceptible to be built with a mass of up to 100 kton. detectors dedicated for tau detection such as the emulsion cloud chamber last but not least the necessary near detector concepts and beam instrumentation guessing the Content of the Design Study pre-submitting it now to ECFA/ESGARD scrutiny

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities

CARESG, 13 Sep 2006V. Palladino Report on BENE Activities Agenda of the BENE day at RAL >> Fri Apr 28 Morning : general introduction >> >> 9:00 Status and prospect of the ISS, towards the IDS (Dornan) >> 9:10 Address from ESFRI Chair (J. Wood) >> 9:40 News from EC (R. Aleksan, tbc) >> 10:00 FP7 (DS, JRA's) and general outlook in EU (Edgecock) >> 10:30 US contributions to the IDS (A.Bross) >> >> 10:40 Break >> >> 11:00 Japan contribution to the IDS (Kuno) >> 11:20 Other contributions to the IDS (Mondal, tbc) >> >> 12:00 General Discussion until lunch >> >> >> Fri Apr 28 Afternoon : EU contributions to the IDS(*) > >> 1) Initiative in the Physics studies sector (Mezzetto/Donini 20') >> 2) Initiative in the Proton driver sector(Cavata 10') >> 3) Initiative in the Target sector (Bennett 10') >> 4) Initiative in the Collection sector (Dracos 10') >> 5) Initiative in the Muon Front End sector (Long 10') >> 6) Initiative in the Muon Back End sector (Meot 10') >> 7) Initiative in the Betabeam sector (Lindroos 15-20') >> 8) Initiative in the Neutrino detector sector (Blondel 20') General Discussion on EU contributions to the IDS (introduced & chaired by R. Garoby) (*) NB this will be match very closely our requests to FP7