Integrating LCA into Building Design and Retrofit Processes Sarah Russell-Smith Research Group Meeting August 25, 2010.

Slides:



Advertisements
Similar presentations
GIS and BIM Integration: Business Level Framework
Advertisements

New Paradigms for Measuring Savings
Cut Costs and Improve Order Efficiency with EDI September 16, 2009 Jim Augenstein Andrew Bing.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Implementation in Chain Store March 2010.
Tracey Clavell Head of Estimating and Pricing – Corporate Defence Cost Estimating Conference Melbourne Oct Commercial in Confidence.
Presented by: Thabet Kacem Spring Outline Contributions Introduction Proposed Approach Related Work Reconception of ADLs XTEAM Tool Chain Discussion.
06/06/07 – 07/11/07 BIM Building Information Modeling.
SmartER Semantic Cloud Sevices Karuna P Joshi University of Maryland, Baltimore County Advisors: Dr. Tim Finin, Dr. Yelena Yesha.
IS/IT strategy of a Virtual Construction Management Services Company Wafa Alsakini Design Management System for a Virtual Construction Management Services.
Spreadsheet Management. Field Interviews with Senior Managers by Caulkins et. al. (2007) report that Spreadsheet errors are common and have been observed.
Lime is… …an interactive visual analysis tool connected to Dynamics NAV Graphical representation of NAV data in your browser Real-time visualization of.
Prepared By: Kopila Sharma  Enables communication between two or more system.  Uses standard network protocols for communication.  Do.
LECTURE-2. Software Is a Product Designed by software engineers. Consists of : –Programs - that execute within a computer and provides desired functions.
Noor Fouad Al-Emadi IEEE 1074 Standard for Developing Life Cycle Processes.
Robust Tools for Archiving and Preserving Digital Data Joseph JaJa, Mike Smorul, and Mike McGann Institute for Advanced Computer Studies Department of.
Network Enabled Capability Through Innovative Systems Engineering Service Oriented Integration of Systems for Military Capability Duncan Russell, Nik Looker,
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
Lecture-8/ T. Nouf Almujally
Building Information Modeling
Igal Kaptsan Research Director Applied Research, Bentley Systems Change Management.
POLITECNICO DI TORINO TRIBUTE and DIMMER. DIMMER - The context One of the major challenges in today’s economy concerns the reduction in energy usage and.
WebShow_PM4D.ppt / MJo 1 Product Model Approach in Design, Construction and FM Development Project : Product Model 4D – Construction Pilot (PM4D) Pilot.
Spreadsheet Management. Sarbanes-Oxley Act (SOX, 2002) Requires “an effective system of internal control” for financial reporting in publicly- held companies.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Introduction to BIM BIM Curriculum 01.
Emerging Trends in Electronic Design and Construction April 2013.
Thesis Proposal Virtual Reality in Construction Cost Estimating By: Mandy Frazure Date: 5/12/04.
Implementation of HUBzero as a Knowledge Management System in a Large Organization HUBBUB Conference 2012 September 24 th, 2012 Gaurav Nanda, Jonathan.
Software All parts of the computer people can NOT touch, such as programs, files, documents and any other data.
Publish Your Work BIM Curriculum 04. Topics  External Collaboration  Sharing the BIM model  Sharing Documents  Sharing the 3D model  Reviewing 
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Copyright © 2006 by The McGraw-Hill Companies,
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
System Development Process Prof. Sujata Rao. 2Overview Systems development life cycle (SDLC) – Provides overall framework for managing system development.
SMART GRID The Next Generation Electric Grid Kunkerati Lublertlop 11/30/2011 Electrical Engineering Department Southern Taiwan University.
material assembled from the web pages at
A performance evaluation approach openModeller: A Framework for species distribution Modelling.
ProjectWise StartPoint An entry-level collaboration tool built on Microsoft SharePoint technologies Joe Croser Global Marketing Director, Platform Products.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
CEE 215 Mid-Term Team: Kevin Chen, Matt Clugston, Preston Taylor, Jesse Santiago 22 October 2008.
DigitalSoftwareWritingMix It Up Digital 100 / The smallest unit of digital information is a / binary / bit / byte / kilobyte / The smallest.
Copyright  2009 Improving MDO in AEC CIFE TAC 2009 Improving Multidisciplinary Optimizaton Methods in AEC 1 Principal Investigators John Haymaker, Assistant.
Selective Overview of R&D to Improve Energy Simulation Philip Haves LBNL CPUC Workshop: Energy Modeling Tools and their Applications in Energy Efficiency.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
© 2006 Bentley Systems, Inc. Bentley Building Solutions multidisciplinary, integrated design and analysis.
K15T2-Team 5- PoD Team Software Project Management.
Phoenix Convention Center Phoenix, Arizona Transactive Energy in Building Clusters [Innovation][Regional Innovation in Arizona] Teresa Wu Arizona State.
Overview of Building Information Modeling What does it mean for Civil Engineering?
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part I.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Using Technology to Solve Problems Unit 2 Mod 2 SO 7.
Integrated Modeling Environment System Engineering Seminar Johnny Medina / Code 531 Chris Stone / Code 531 / Constellation Software Engineering.
Smart Grid Big Data: Automating Analysis of Distribution Systems Steve Pascoe Manager Business Development E&O - NISC.
TOKMO and COBIE Igor Starkov President Tokmo Solutions, Inc.
June 2007Office of Federal Environmental Executive Symposium a data standard for use with construction specifications Bill Brodt Facilities Engineering.
© 2011 Autodesk Autodesk ® Sustainability Solutions Buildings and Infrastructure Name Title.
ARCH653 Building Information Modeling in Architecture Wei Yan, Ph.D. Texas A&M University.
Introduction to Systems Analysis and Design
Project Cost Management
PowerPoint presentation
BIM EXECUTION PLANNING PROCESS
of our Partners and Customers
Estimating With Electronic Documents Kevin R. Miller, Ph. D
BIM MAPPING.
BIM EXECUTION PLANNING PROCESS
MANAGING KNOWLEDGE FOR THE DIGITAL FIRM
Your Facility Your Information
Grid Application Model and Design and Implementation of Grid Services
CHAPTER 9 (part a) BASIC INFORMATION SYSTEMS CONCEPTS
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
Interview Task 1.
Presentation transcript:

Integrating LCA into Building Design and Retrofit Processes Sarah Russell-Smith Research Group Meeting August 25, 2010

The Plan The goal is to delve into: 1.Mathematical Tools for Data Analysis 2.Life Cycle Impacts of Commercial Buildings 3.Useful/Meaningful Metrics for Analysis Case Studies: 1.Y2E2: Retrospective New Construction Project 2.GSA Border Crossing Complex: Prospective New Construction Project 3.TBD: Retrofit Project Sarah Russell-Smith

Requirements for Case Studies Past Data & Future Monitoring Planned Access to Building Managers & Engineers Plans available Digital bidding and as-built documents and BIM model help Similar Size (~100,000 sq.ft.) Same climate Same type of building (office) Additionally for Next Case: Retrofit Planned Sarah Russell-Smith

Y2E2 1.Acquired building documents from Stanford Maps & Records (PDF and DWG files) 2.Attempted to create 3D Revit model (but files are only 2D) 3.Spoke with Arup and Hathaway-Dinwiddie – no 3D model for Y2E2, but 4 th building is mirror image, awaiting material inventory 4.Created Excel spreadsheet listing materials (Thanks Jeff!) Sarah Russell-Smith

Y2E2 – Next Steps 1.LCI - Identify matching SimaPro material and quantify material take-offs 2.Analyze Sensor Data for Use Phase Energy Consumption 1.Review work from CEE243 (2009) class 2.Explore Algorithms to Reduce Data Intensity 3.Complete Process – Reduce data without compromising accuracy 3.Data Analysis of Design Process 1.Work backwards from complete model, taking away information to replicate decisions that were made 2.Analyze how decision process worked and possible improvements 4.Determine “Best” Metrics 1.Tie LCA to Data Analysis Sarah Russell-Smith

GSA Border Crossing 1.Met with Peggy Ho Yee from GSA to discuss research plan 2.Spoke with Anh Nguyen (GSA), Craig Curtis (MillerHull), Drew Gangnes (MKA) 3.Project Details: 1.Border crossing complex near San Diego 2.Campus of several buildings, highway 3.2 main buildings connected at basement, 3-story office buildings, mirror images of each other to be built in separate phases 4.Currently finishing proposal for GSA 5.Goal: Development of a framework and computational architecture to enable building designers, engineers, contractors, owners, managers, and users to quickly, reliably, and efficiently construction a dynamic life cycle model that quantifies the life cycle impacts associated with the pre-use building life cycle through computational links with existing 3D architectural modeling tools, 3D structural analysis software, 4D virtual design and construction packages. Use phase life cycle impacts will be quantified using on real-time building performance data gathered from distributed sensor networks. Sarah Russell-Smith

Questions or Comments?