Swedish participation in DataGrid and NorduGrid Paula Eerola SWEGRID meeting, 11.6.2001.

Slides:



Advertisements
Similar presentations
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
Advertisements

Partikeldagarna Tord Ekelöf Uppsala University 1 New actions by the Swedish LHC Consortium Open Access Publishing of LHC results Nobel Symposium.
4/2/2002HEP Globus Testing Request - Jae Yu x Participating in Globus Test-bed Activity for DØGrid UTA HEP group is playing a leading role in establishing.
LHC and Beyond Collaboration project under the NordForsk scheme ”Joint Nordic Use of Research Infrastructures” Webpages Webpages
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Grid activities in Sweden Paula Eerola IT seminar, Vetenskapsrådet,
EU 2nd Year Review – 04 Feb – WP10 status report – n° 1 WP10 Status Report Vincent Breton (WP10 manager) Presentation address.
Nordic Data Grid Facility NDGF – Paula Eerola, paula.eerola [at] hep.lu.se paula.eerola [at] hep.lu.sepaula.eerola [at] hep.lu.se 1st Iberian.
Current Monte Carlo calculation activities in ATLAS (ATLAS Data Challenges) Oxana Smirnova LCG/ATLAS, Lund University SWEGRID Seminar (April 9, 2003, Uppsala)
1 CENTER FOR PARALLEL COMPUTERS Grid PDC Olle Mulmo
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
Grid Computing Reinhard Bischof ECFA-Meeting March 26 th 2004 Innsbruck.
DataGrid Kimmo Soikkeli Ilkka Sormunen. What is DataGrid? DataGrid is a project that aims to enable access to geographically distributed computing power.
Grid and High Energy Physics Paula Eerola Lunarc, Artist’s view on Grid, by Ursula Wilby, Sydsvenskan
ATLAS experiment Paula Eerola ATLAS presentation Prof. Paula Eerola Division of High Energy Physics Fysiska institutionen,Professorsgatan 1,
The NorduGrid project: Using Globus toolkit for building Grid infrastructure presented by Aleksandr Konstantinov Mattias Ellert Aleksandr Konstantinov.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
EGEE (EU IST project) – Networking Activities 4: biomedical applications NA4 Biomedical Activities Johan Montagnat First EGEE Meeting Cork,
DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
Grid Computing Oxana Smirnova NDGF- Lund University R-ECFA meeting in Sweden Uppsala, May 9, 2008.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
Conference xxx - August 2003 Anders Ynnerman EGEE Nordic Federation Director Swedish National Infrastructure for Computing Linköping University Sweden.
03/27/2003CHEP20031 Remote Operation of a Monte Carlo Production Farm Using Globus Dirk Hufnagel, Teela Pulliam, Thomas Allmendinger, Klaus Honscheid (Ohio.
Tord.Ekelöf, Uppsala UniversityPartikeldagarna Karlstad Tord Ekelöf Uppsala University Partikeldagarna Karlstad
Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
Conference xxx - August 2003 Anders Ynnerman Director Swedish National Infrastructure for Computing Linköping University Sweden Griding the Nordic Supercomputer.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
LCG Generator, October 16 th 2003 Introduction to the October LCG Generator meeting Paolo Bartalini CERN.
Quick Introduction to NorduGrid Oxana Smirnova 4 th Nordic LHC Workshop November 23, 2001, Stockholm.
D0RACE: Testbed Session Lee Lueking D0 Remote Analysis Workshop February 12, 2002.
The NorduGrid Information System Balázs Kónya GGF July, 2002, Edinburgh.
DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 1 DataGrid Workshop INFN Testbed status report L. Gaido Oxford July,
3-Nov-00D.P.Kelsey, HEPiX, JLAB1 Certificates for DataGRID David Kelsey CLRC/RAL, UK
28 March 2001F Harris LHCb Software Week1 Overview of GGF1 (Global Grid Forum) and Datagrid meeting, NIKHEF, Mar 5-9 F Harris(Oxford)
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Project Status Fabrizio Gagliardi.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting.
DATAGRID Testbed Work Package (report) F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam.
User Management: Authentication & Authorization on the NorduGrid Balázs Kónya, AndersWäänänen 3 rd NorduGrid Workshop, 23 May, 2002 Helsinki.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
NIKHEF CT/ Status NIKHEF (NL). NIKHEFDataGrid/Oxford/July DutchGrid Participation of High-energy Physics Earth observation Computer.
FP6−2004−Infrastructures−6-SSA EUChinaGrid status report Giuseppe Andronico INFN Sez. Di Catania CERN – March 3° 2006.
Status of NorduGrid testbed DataGrid Workshop, Oxford 2 nd – 5 th of July Anders Waananen.
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
Report from DataGrid Technical Board Massimo Sgaravatto INFN Padova.
IAG – Israel Academic Grid, EGEE and HEP in Israel Prof. David Horn Tel Aviv University.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
EU 2nd Year Review – 04 Feb – WP10 status report – n° 1 WP10 Status Report Vincent Breton (WP10 manager) Presentation address.
L. Perini DATAGRID WP8 Use-cases 19 Dec ATLAS short term grid use-cases The “production” activities foreseen till mid-2001 and the tools to be used.
10-May-01D.P.Kelsey, WP6 Security1 Certificates/Authorisation for DataGrid Testbeds David Kelsey CLRC/RAL, UK
11-May-01D.P.Kelsey, Security Update1 GRID Security Update David Kelsey CLRC/RAL, UK
CERN 1 DataGrid Architecture Group Bob Jones CERN.
Dave Newbold, University of Bristol14/8/2001 Testbed 1 What is it? First deployment of DataGrid middleware tools The place where we find out if it all.
WP10 Goals and accomplishments from WP10 point of view J. Montagnat, CNRS, CREATIS V. Breton, CNRS/IN2P3 DataGrid Biomedical Work Package.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
NDGF – a Joint Nordic Production Grid Lars Fischer ICFA Workshop on HEP Networking, Grid, and Digital Divide Issues for Global e-Science Cracow, 2 October.
Grid activities in Czech Republic Jiri Kosina Institute of Physics of the Academy of Sciences of the Czech Republic
NorduGrid's ARC: A Grid Solution for Decentralized Resources Oxana Smirnova (Lund University/CERN) for the NorduGrid collaboration ISGC 2005, Taiwan.
The EDG Testbed Deployment Details
Grid Technology and Applications in The North European Region
Presentation transcript:

Swedish participation in DataGrid and NorduGrid Paula Eerola SWEGRID meeting,

Paula Eerola SWEGRID meeting, Sweden in the DataGrid  Swedish participation in the EU DataGrid project is enabled through VR and CERN - the partners in the DataGrid project.  The NorduGrid testbed acts as a link between the activities, providing an appropriate infrastructure.

Paula Eerola SWEGRID meeting, WP2 Data Management  PDC (KTH, Stockholm): Grid Data Management Work Package (WP2). Working on issues like secure infrastructure and access. Contact: Per Öster

Paula Eerola SWEGRID meeting, WP6 Testbed  Lund University (and in future Stockholm and Uppsala): through the NorduGrid project, participate in the Testbed and Demonstrators Work Package (WP6). Activity involves configuring computing farms to be the part of the DataGrid testbed. Contact: Oxana Smirnova

Paula Eerola SWEGRID meeting, WP8 HEP Applications  Universities of Lund, Stockholm and Uppsala: involved in the HEP Applications Work Package (WP8), through participation in the ATLAS experiment. Contacts: Oxana Smirnova, Tord Ekelöf, Sten Hellman

Paula Eerola SWEGRID meeting, WP10 Biology Applications  Uppsala University, Karolinska Institute (Stockholm): working for the Biology Applications Work Package (WP10). KI is involved in genomics, esp. data mining in distributed databases. In Uppsala, Linnaeus Centre for Bioinformatics is involved in genome sequencing, requiring also distributed databases. Contacts: Siv Andersson (UU), Gunnar Norstedt (KI)

Paula Eerola SWEGRID meeting, Status of the DataGrid  The project was launched in January 2001, with the first workshop being held in March (Amsterdam, together with the Global Grid Forum). The second workshop will be in July (Oxford, UK)  The first milestone, so-called Project Month 6 (PM6) is reached, with the following progress achieved:

Paula Eerola SWEGRID meeting, DataGrid: today  Testbed0 participants and sites are defined (12 participants, ca. 50 sites, including NorduGrid)  Short-term use-cases to be executed at the Testbed. Use-cases defined by the LHC experiments and other participants  Code-writing started at the corresponding WP's (scheduling, data management etc)  Architecture Task Force report is in progress, user requirements are collected, and deliverables for the Project Month 9 (PM9) are being defined

Paula Eerola SWEGRID meeting, DataGrid: tomorrow  The major milestone of PM9 is expected to have some of the necessary toolkits, services and other software delivered (beta- versions) for testing  Most of the software packages will be released not earlier than PM12 (glitches in the original planning)

Paula Eerola SWEGRID meeting, Status of the NorduGrid  The NorduGrid project has a purpose to create a Nordic branch of the DataGrid, and proceeds in a close contact with the latter  The project is financed via the Nordunet2 programme, and started in January 2001  NorduGrid testbed is a part of the DataGrid Testbed Workpackage (WP6)

Paula Eerola SWEGRID meeting, NorduGrid: sites & people  Three dedicated postdoc positions are set up:  Lund: Balázs Kónya (support for Lund and Copenhagen clusters), started on May 1  Uppsala: Mattias Ellert (Uppsala- Stockholm-Helsinki), started on June 1  Oslo: Aleksandr Konstantinov (Oslo- Bergen), to start on June 15

Paula Eerola SWEGRID meeting, NorduGrid: resources  Farms in Lund and Copenhagen are configured (Globus, OpenPBS batch scheduler); simple tests done; farms are ready to execute realistic tasks  Uppsala, KoSuFy in Lund: have Globus enabled at stand-alone PC’s, connectivity tested  Nordic Certification Authority (CA) is set up at the NBI (Copenhagen), being also a part of the DataGrid CA's

Paula Eerola SWEGRID meeting, NorduGrid: next steps  KoSuFy (Lund) may join NorduGrid: 80- CPU farm, to be one of the biggest single farms in DataGrid  HEP applications: to go from local batch submission to Globus; installation of the ATLAS toolkit for the short-term use- case  Include biology applications (genomics in UU and KI), - contacts are being established