MUTAC Review, 9 April 2008 1 MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720.

Slides:



Advertisements
Similar presentations
CM-22 Magnet Issues, 6 June MICE Magnet Cool Down and Other Issues Michael A. Green Lawrence Berkeley Laboratory Berkeley CA
Advertisements

Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Vacuum Vessel Production Readiness Review
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Magnet quench during a training run Magnet electrical circuit schematic PROGRESS ON THE MODELING AND MODIFICATION OF THE MICE SUPERCONDUCTING SPECTROMETER.
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Progress on the MICE Cooling Channel Solenoid Magnet System
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
-1- Wang, Li The 23rd MICE Collaboration Meeting to 17 HIT/CHINA WANG, Li Institute of Cryogenics and Superconductivity Technology.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
1 Update on Focus Coil Design and Configuration M. A. Green, G. Barr, W. Lau, R. S. Senanayake, and S. Q. Yang University of Oxford Department of Physics.
1 Spectrometer Solenoid Design and Cost Update Michael A. Green Lawrence Berkeley Laboratory 10 February 2005.
Tracker Solenoid Module Design Update Steve VirostekStephanie Yang Mike GreenWing Lau Lawrence Berkeley National LabOxford Physics MICE Collaboration Meeting.
10 October 2006 MICE CM-16 at RAL 1 Distributed versus Lumped Coupling Magnets Michael A. Green and Soren Prestemon Lawrence Berkeley Laboratory, Berkeley.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 The Genoa Tracker Solenoids and their Contribution toward a New Design Michael A. Green Lawrence Berkeley National Laboratory and Pasquale Fabbricatore.
1 Quench Protection and the Power Supplies for the MICE Focusing and Coupling Magnets Michael A Green Lawrence Berkley Laboratory 10 February 2005.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
12 March 2006NFMCC Meeting, IIT, Chicago1 Progress on the MICE Cooling Channel and Tracker Magnets Michael A. Green Lawrence Berkeley Laboratory.
CM-18 June Magnet Conductor Parameters and How They affect Conductor Selection for MICE Magnets Michael Green Lawrence Berkeley Laboratory Berkeley.
Twin Solenoid Twin Solenoid - conceptual design for FCC-hh detector magnet - Matthias GT Mentink Alexey Dudarev Helder Pais Da Silva Leonardo Erik Gerritse.
1 Progress on the MICE Cooling Channel Magnets Michael A. Green Lawrence Berkeley National Laboratory 28 June 2005.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Superconducting Large Bore Sextupole for ILC
MCTF Alexander Zlobin MUTAC Meeting 8-10 April MCTF Magnet and HTS Conductor R&D.
RF Cavity / Coupling Coil Module
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Status of CEPC Detector magnet
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
Progress on MICE/MuCool Coupling Magnets -1- CM20/UK, ICST/HIT Progresson MICE/MuCool Coupling Magnets Li Wang Institute of Cryogenics.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Preliminary Design for the Coupling Coil Cryostat in MICE
Abstract: The Muon Ionization Cooling Experiment (MICE) is an international effort sited at Rutherford Appleton Laboratory, which will demonstrate ionization.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
MICE Cooling Channel Magnets: Spectrometer Solenoid Procurement RF Module Coupling Coil Proposal Steve Virostek Lawrence Berkeley National Lab NFMCC 07.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
MICE/MuCool Coupling Magnets to 22 ICST/HIT MICE/Muool Coupling Magnets Progress Li Wang for MICE Group Institute of Cryogenics.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova The air core magnets.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
Magnetics Program Highlights VLT Conference Call September 13, 2000 presented by J.V. Minervini MIT Plasma Science and Fusion Center.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Michael A. Green and Heng Pan
Mechanical behavior of the EuroCirCol 16 T Block-type dipole magnet during a quench Junjie Zhao, Tiina Salmi, Antti stenvall, Clement Lorin 1.
Spectrometer Solenoid Update
Spectrometer Solenoid Fabrication Status and Schedule
Yingshun Zhu Accelerator Center, Magnet Group
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
as a prototype for Super c-tau factory
Quench calculations of the CBM magnet
Presentation transcript:

MUTAC Review, 9 April MuCOOL and MICE Coupling Magnet Status Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720

MUTAC Review, 9 April The ICST Coupling Solenoid Design Coupling Magnet Cryostat Coupling Magnet Cold Mass

MUTAC Review, 9 April Magnet Progress to Date A portion of the superconductor has been delivered. The rest of the conductor is being fabricated. Engineering design of the coupling magnet is over 90 percent complete. The engineering design of the two ICST test coils is complete. The coil winding tooling is complete. The first dummy test coil is being wound at ICST. The first test coil joints have been fabricated. The joints will be tested in a magnetic field at Berkeley.

MUTAC Review, 9 April ICST Coil Winding Facility De-spooling and Tensioning Apparatus Coil Winding Apparatus Winding a Copper Test Coil

MUTAC Review, 9 April Purpose of Test Coil 1 This coil is the first superconducting solenoid wound with the coupling coil conductor. The joint design and the coil taps for the quench protection system is verified in this magnet. This coil will be part of the crew training process. Test coil 1 will produce enough field so that the magnet can be used for cold diode tests and other sorts of tests to be done in a magnetic field at 300 K, 77 K and 4.2 K. Both of the superconducting test coils will be cooled using the ICST refrigerator.

MUTAC Review, 9 April Purpose of Test Coil 2 The winding parameters for the coupling coil will established by winding a full diameter test coil. The 2nd test coil will be cooled down using the ICST refrigerator in a cryostat suitable for the training the large test coil and the coupling magnets. Test coil 2 will be strained by the cool down and the magnetic field so that the worst case strain seen by the MICE coupling coils is seen in the test coil. There will be a full scale test of the coupling coil cold diode and resistor quench protection system with the test coil sub-divided into four circuits.

MUTAC Review, 9 April Coil Small PrototypeCoupling 96 layer 24 layer12 layer96 layer80 layer Coil Length (mm) Coil Inner Radius (mm) Coil Thickness (mm) Number of Layers No. Turns per Layer Magnet J (A mm-2)*114.6 Magnet Current (A)*210 Self Inductance (H) Peak Induction in Coil (T) Magnet Stored Energy (KJ) K Temp. Margin (K)~3.3~3.9~2.5~2.9~0.8 Conductor Len/coil (km) ~ Parameters for the Test Coils and the Coupling Coil The small test coil will have 24 layers. The large prototype test coil will have 96 layers.

MUTAC Review, 9 April Magnet Load Lines

MUTAC Review, 9 April Magnetic Field in the Small Test Coil at a Current of 512 A

MUTAC Review, 9 April After cooling to 4.2 K After charging to 512 A Von Mises Stress of the Small Test Coil after Cool Down and Charging at 512 A

MUTAC Review, 9 April Magnetic Field in the Large Test Coil at a Current of 401 A

MUTAC Review, 9 April Von Mises Stress in the Large Test Coil After Coil Winding After Coil Banding After Cool Down to 4 K After Charge to 401 A

MUTAC Review, 9 April Stress and Deflection Simulations for the 2nd Test Coil (the full diameter test coil) Stress and deflection simulations were done on the large test coil. Stress and deflection calculations were done after the magnet was cooled to 4.2 K and powered to 401 A. The hoop stress and Von Mises stress is almost the same for the large test coil at 401 A when compared to the coupling coil at 210 A. The radial deflection is also similar. If the large test coil can operate at 400 A, the coupling coil should operate to at least 200 A.

MUTAC Review, 9 April Winding banding Cooling Charging Winding coil Von Mises Stress in the Coupling Coil The stress and deflection calculations include the winding pre-stress in the coil and banding, which keeps the coil from lifting off the mandrel when it is fully charged to a current of 210 A. The boundary conditions are different for the coupling coil than they were for the large test coil. The minimum winding Pre-stress is 70 MPa. The aluminum banding pre-stress is 30 MPa.

MUTAC Review, 9 April Modeling the Temperature Distribution in the Coupling Coil during Normal Operation The heat flow into the magnet as shown is 1.5 W from radiation and conduction. The heat flow due to AC losses in the magnet coil during to a rapid discharge from 210 A to no current in 5400 seconds has also been modeled using ANSYS. The coupling magnet can be discharged in 5400 seconds without quenching.  T = K

MUTAC Review, 9 April Parameter 0 m  60 m  2-Section Hot Spot Temperature (K)136 Max Internal Voltage (V) Section Hot Spot Temperature (K)129 Max Internal Voltage (V) Section Hot Spot Temperature (K) Max Internal Voltage (V) Parameter 0  5  8-Section Hot Spot Temperature (K)13588 Max Internal Voltage (V) Results for Test Coil 2 Results for Coupling Coil A Summary of Quench Protection Simulations for the 2nd Test Coil and the Coupling Coil

MUTAC Review, 9 April The ICST set up allows the coupling magnet to be trained rapidly to its full current. Refrigerator 1500 mm ID Magnet Coil

MUTAC Review, 9 April ICST MuCOOL Milestones Complete the large coil test stand 6/15/08. Complete the two test coils 6/30/08. Finish winding the MuCool Coil 7/31/08. Complete the MuCool coil Cold Mass 9/20/08. Train MuCool coil cold mass assembly 9/30/08. Finish Mucool magnet assembly 12/02/08. Mucool magnet acceptance test finished 1/01/09. Ship Mucool magnet to Fermilab 1/10/09

MUTAC Review, 9 April Finish winding 1st MICE coil 10/09/08. Finish and train 1st MICE coil assembly 11/30/08. Finish winding 2nd MICE coil 12/18/08. Finish 1st MICE magnet assembly 2/09/09. Finish and train 2nd MICE coil assembly 2/17/09. 1st MICE magnet acceptance test finished 3/02/09. Ship 1st MICE magnet to LBNL 3/15/09. Finish 2nd MICE magnet assembly 4/28/09. 2nd MICE magnet acceptance test finished 5/29/09 Ship 2nd MICE magnet to LBNL 6/10/09. ICST MICE Magnet Milestones

MUTAC Review, 9 April Concluding Comments The coupling magnet engineering is nearly done, but there may be a few changes in the final design based on what is learned from the two test coils. The schedule for the Mucool and MICE magnets is based on things going well. The schedule doesn’t consider unforeseen problems that may be encountered when the MuCool magnet is run with the 1.5 W coolers for the first time.