Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.

Slides:



Advertisements
Similar presentations
ILIAS WG1 meeting - Birmingham1 Cryogenic Trap Vs Brewster window & noise coupling through windows J. Marque.
Advertisements

Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Open valve 1 so that the flow is from the reservoir to the pump head. Close Valve 4 so flow is stopped. Make sure Valve 2 is open to vent.
Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group TAC 2013, F. Makahleh, Vacuum & Cooling 1.
Vacuum Fundamentals High-Vacuum Technology Course Week 8 Paul Nash HE Subject Leader (Engineering)
High-Vacuum Technology Course
Q&A Smalltraps RReview 19Feb2014. From C. Michel: Congratulations for the Vac Team: the project is mature and ready for the manufacturing step. Nevertheless.
Vacuum technologies of existing and future GW interferometers Aspera Technology Forum Darmstadt, March 2012 C.Bradaschia, G.Parguez, A.Pasqualetti.
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
Some results of vacuum stand investigation.. 1. Restoration of turbopump inlet valve V1 tightness The inlet turbopump valve of the first pump station.
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
1 VAC – Vacuum system modifications ERC telecon, 24Mar09 A.Pasqualetti for the VAC team.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Vacuum Fundamentals 1 atmosphere = 760 mm Hg = kPa 1 torr = 1 mm Hg vacuum range pressure range low 760 ~ 25 torr medium 25~ high ~ 10.
1 R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
LIEBE project: WP3 – Construction and tests Project coordination meeting – 30/01/ /01/2015 LIEBE project meeting1 M. Delonca on behalf of the WP3.
AdV-VAC meeting 21Apr’09 Agenda 1) results from the reviews (A.Pasqualetti) 2) present wbs, present project planning, baseline design (A.Pasqualetti) 3)
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
Some notes about liquid Hydrogen target 1.How it operates 2.Modification Target length, empty mode 4.Status.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Vacuum / cryo links Design issues Jo van den Brand, Martin Doets Nikhef Cascina Feb. 3,
Cascina, June 19th, Brewster window noise ? Raffaele Flaminio EGO and CNRS/LAPP Summary - Original observations - Brewster window replacement - New.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Advanced Virgo: Optical Simulation and Design Advanced Virgo review Andreas Freise for the OSD Subsystem.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
RF power couplers vacuum issues J.M. Jimenez Vacuum, Surfaces and Coatings Group (TE-VSC)
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
A. Kraemer, OLAVIII, July 11th, Gas Loads into SIS100 Cryogenic Vacuum Sections A. Kraemer, Calculations and Transparencies courtesy of St. Wilfert.
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
Vacuum System P. Chiggiato TE-VSC
Vacuum Simulations for ELENA’s LNR-01 R. Kersevan IIC Meeting 9/6/2015
STRAW TRACKER SYSTEM CAD STATUS :
Ti/SS transitions A.Basti INFN-PISA*
Installation of an Instrument on a CERN machine
SPS cryogenic proximity equipment and SM18 validation
Small Coolers for MICE MICE Collaboration Meeting RAL Michael A. Green
Superattenuator for LF and HF interferometers
BASIC VACUUM PRACTICE.
AdV - Internal Review of VAC subsystem
Periodical meeting about the 'control system ‘
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger tower links (1m in diameter) without valves between towers (Antonio P. + All) 3. Upgrade of SR tower: (Pierre M.) 4. Improved clean air flow in UHV towers: (Pierre M.) 5. Vacuum system upgrade in order to reduce the residual pressure (Antonio P. + All) _ Sensitivity _ Present status _ Possible solutions _ Considerations from ligo vacuum expert about water _ Air from bench towers (oring permeation, desorption from cables …) 6. Vacuum Control System upgrade: (LAL team )

Vacuum Upgrade 1)Actual status 2)Sensitivity 3)Needed improvement and possible solutions 4)Ligo vacuum expertise 5)1m link option

1.10^-6 mbar About 7 months Actual Vacuum in Virgo W arm N arm W arm recently

W tube (600m, 1200m, 2400m) pumped during a recent stop reached 5E-8mbar, and went back to around 2E-7 mbar when reconnected to the towers (right pic ) Gas load from towers is considerable Towers are frequently vented and connected to the tubes after a few days of pumping (left pic). Pressure can reach temporarily 1E-6mbar.

Noise due to water at different pressures Beam size : 60mm-8.5mm- 60mm (slide by G.Cella) Water 3E-8 mbar

The phase noise due to vacuum of tubes has been checked by experts (GCella) and the proposed formula has been experimentally validated (LIGO) It is needed to improve the vacuum by more than one order of magnitude. Two orders of magnitude to get a margin of ~>5, the minimum considering a safety factor on design and to not limit the AdvV progress Ligo limits correspond to our full baked conditions 1E-9mbar H2, 1E- 10mbar H2O,...

Considered solutions: virgo vac system has been designed and tested to be fully baked at 150C: beam tubes + towers to reach < 1E-9 mbar, H2. Towers can’t be baked because much time consuming + risky : Baking only tubes: already in use by Ligo using Coldtraps. Increasing pumping speed: it was already discarded in the original design. Not feasible to get a factor 100, while the cost is considerable even to get a factor 10 on pumping speed because the need of doubling the stations Others ?

full baked case (total pressure 1E-9, hydrogen with other gases) ‘limit’ Feasible solution

Ligo expertize, baking tubes but not towers limit of the water load to be released inside tubes is 400mbar.liter, for all the service life It comes from a model based on water adsorption on tube walls, verified on the real case during the bake (a simulation for our case shall be done) This amount is released from towers to tubes in few months without cryotraps. AdvV towers will have additional internal load (large amount of peek). Cryotraps are recommended to lower the HC pressure in mirror chambers, possibly risky for AdvV mirrors. (RW,Sept’08)

Cryotrap principle is already present in Virgo (towers conductance, DT tower) They are traps but in particular also large cryogenic pumps ~10^5 liter/sec, 100 times than actual figure in towers. Different postions can be studied ”Ligo” Small option Additional ‘false’ valve

Cryotraps about 4m long, 1m diameter, can be made as an LN2 reservoir made out of aluminum and put inside the first portion of tube (Ligo courtesy)

Other advantages of cryotraps The need of prototypes and long design phase is reduced thanks to Ligo experience. Bake of tubes could be postponed. Once separated from towers, the pressure in tubes will improve along time. ITF duty cycle: faster recovery of tower service after venting Needed to allow the ‘1m diameter link’ option. They shall reduce water and HC in central area by a factor 100, (as we got in the tower baking test) helping to connect mirror towers to bench towers.

without ‘brewster windows’ we need to consider ‘ air’, in particular from bench towers upper parts Cryotraps don’t pump air, that will be released from polymeric materials after each venting and through orings due to permeation, and small leaks. After water we need to deal with air, exact amount is to be evaluated Could a very simplified IVC adopted on DT/IB/MC?

Needed answer ‘today’: Can now decide to have ‘’large flange not accessible’’? (pic by A.Paoli and T.Zelenova

Before the AdvV review, Nov 3rd: It is needed an update of the AdV conceptual design, including a revised plan and budget