EIAScreening5(Gajaseni, 2007) 1 EIA - Operating Principles.

Slides:



Advertisements
Similar presentations
Health impact assessment explained
Advertisements

SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Screening.
PROJECT RISK MANAGEMENT
Presentation by Cambodian Participants Phuket, Thailand February 2012 Health Impact Assessment Royal Government of Cambodia.
Environmental Management System (EMS)
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Environmental Impact Assessment
Scoping in the EIA process Proposal Identification Screening
1 Theme 1 Affected communities and sustainable territorial development programme encompassing Radioactive Waste Management Affected Communities What does.
USAID Africa Bureau EIA Procedures for Sub-Projects
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Monitoring.
Environmental Impact Assessment Myriam Raiche November 8, 2007.
Jump to first page EIAMonitoring9.07(Gajaseni,20 07) 1 Monitoring Monitoring = check of actions Monitoring plan =environmental management plan.
ENVIRONMENTAL MANAGEMENT SYSTEMS. ENVIRONMENTAL ISSUES Global Warming Climate Change Ozone Layer Resource Depletion Population Growth Waste Disposal Effects.
ISO General Awareness Training
ENVIRONMENTAL MANAGEMENT PLAN
E nvironmental I mpact A ssessment Geog 456 – Spring 2008 Paul Fraser.
Topic 6 Environmental Impact Assessments. EIA – Introduction The start Effectiveness?
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
EIA Process, IEE, TOR Dr. Wesam Al Madhoun
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
MEASURING CHANGES OF THE SYSTEM Environmental Gradients Human Impacts Environmental Impact Assessments (EIA’s) Modified from DARLENE OEHLKE.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
UNEP Training Resource Manual Topic 13 Slide 1 Aims and objectives of SIA are to: F analyse how proposals affect people F identify and mitigate adverse.
ISO 14001:2004, Environmental Management System
Basic Concepts for Assessing Environmental Impacts.
UNEP Training Resource Manual Topic 11 Slide 1 Aims of EIA implementation and follow up are to: F carry out conditions of approval F ensure they work effectively.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
UNEP Training Resource ManualTopic 7 Slide 1 The purpose of mitigation is to: F find better ways of doing things F enhance environmental and social benefits.
UNEP Training Resource Manual Topic 10 Slide 1. UNEP Training Resource Manual Topic 10 Slide 2 EIA is a process to: F gather information necessary for.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
UNEP Training Resource ManualTopic 2 Slide 1 The EIA process The EIA process comprises:  screening - to decide if and at what level EIA should be applied.
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Mitigation and Impact management
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
SEA in the Czech Republic Prague, 24 September 2008.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
YMEP Environmental Training Overview of Training Program Four Modules: 1.USAID Environmental Guidelines Purpose and Overview 2.Environmental Screening.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Reporting in the EIA process.
National Environmental Assessment Requirements and Relation to World Bank Policies Relevance to Central Asia Gulana Hajiyeva WB Safeguards Training Workshop.
ENVIRONMENTAL IMPACT ASSESSMENT: A TOOL FOR DECISION MAKING.
LECTURE 2 EIA/EIS. Proposed Undertaking (> 10 hectares) Determine whether there are environmental, health and safety impacts Application for environmental.
Jerzy Jendrośka Decisions on proposed activities not listed in annex 1 of the Convention (article 6 paragraph 1 (b) of the Convention) Task Force on Public.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Maria Teresa Gómez Osorio Supervisors: Dr. R. Cobb and Dr. A. Bond Role of Environmental Impact Assessment (EIA) in decision- making.
Strategic Environmental Assessment Patrick White and Nelly Isyagi.
Required Documentation: Determination and Overview (EPTM Chapter 3)
UNEP Training Resource ManualTopic 9 Slide 1 No EIA EIA Required *Public involvement Scoping Mitigation and impact management EIA Report Proposal Identification.
What If I Have to Go Beyond an IEE?. EA Training Course 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs) How Do I Prepare.
EIA approval process, Management plan and Monitoring
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
National Environmental Policy Act (NEPA)
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
Mitigation.
1.
Environmental Impact Assessments
The purpose of screening
Environmental Impact Assessment EIA
Presentation transcript:

EIAScreening5(Gajaseni, 2007) 1 EIA - Operating Principles

EIAScreening5(Gajaseni, 2007) 2 EIA - Operating Principles***  Screening  Scoping  Assessing  Mitigation  Reporting  Reviewing  Decision-making  Monitoring and management  Public involvement

EIAScreening5(Gajaseni, 2007) 3 The EIA process: F screening - to decide if and at what level EIA should be applied F scoping - to identify the important issues and prepare terms of reference F impact analysis - to predict the effects of a proposal and evaluate their significance F mitigation - to establish measures to prevent, reduce or compensate for impacts

EIAScreening5(Gajaseni, 2007) 4 F reporting - to prepare the information necessary for decision-making F review - to check the quality of the EIA report. F decision-making - to approve (or reject) the proposal and set conditions F follow up – to monitor, manage and audit the impacts of project implementation F public involvement - to inform and consult with stakeholders

EIAScreening5(Gajaseni, 2007) 5 EIAScreening5(Gajaseni, 2007) UNEP Training Resource Manual Topic 1 Slide 5

EIAScreening5(Gajaseni, 2007) 6 Project Screening - is an EIA needed? Scoping – which impacts & issue to consider? Description of the proposed action Identification of key impacts Project Screening - is an EIA needed? Scoping – which impacts & issue to consider? Description of the proposed action Identification of key impacts Assessing: Prediction of impacts Evaluation & assessment of significant of impacts Identification of mitigation measures Assessing: Prediction of impacts Evaluation & assessment of significant of impacts Identification of mitigation measures Presentation of finding in an EIA report (EIS) (including a non-technical summary) Presentation of finding in an EIA report (EIS) (including a non-technical summary) Review of the EIA report (EIS) Decision-making Post-decision monitoring Auditing of predictions and mitigation of measures Post-decision monitoring Auditing of predictions and mitigation of measures Public involvemen t Important Steps in the EIA Process

EIAScreening5(Gajaseni, 2007) 7 EIA process I. Screening

EIAScreening5(Gajaseni, 2007) 8 SCREENING  Definition: –is the process of determining whether or not a proposal requires full-scale EIA and the level at which that assessment should occur.

EIAScreening5(Gajaseni, 2007) 9 The purpose of screening The purpose of screening is to determine: F whether or not a proposal requires an EIA F what level of EIA is required

EIAScreening5(Gajaseni, 2007) 10 Outcomes of screening F full or comprehensive EIA required F more limited EIA required F furthe r study needed to determine EIA requirement F no further requirement for EIA

EIAScreening5(Gajaseni, 2007) 11 Screening and scoping compared Screening F determines the requirement for EIA F establishes the level of review necessary Scoping F identifies the key issues and impacts F establishes the terms of reference

EIAScreening5(Gajaseni, 2007) 12 Requirement of full-scale EIA involves:  exploitation of natural resources  infrastructure  industrial activities  extractive industries  waste management and disposal  substantial changes in farming or fishing practices

EIAScreening5(Gajaseni, 2007) 13 Screening methods F legal/policy definition F inclusion list of projects (with or without thresholds) F exclusion list of projects F criteria for case-by-case screening

EIAScreening5(Gajaseni, 2007) 14 Approaches to screening involve one or a combination of:  decision-makers’ discretion  initial environmental examination  project lists with/without thresholds  exclusion lists

EIAScreening5(Gajaseni, 2007) 15

EIAScreening5(Gajaseni, 2007) 16 Decision-maker’s discretion:  the proposal itself and its potential impacts  the level of confidence in the predicted impacts  the characteristics of the receiving environment and its resilience to change  the existing planning, environmental management and decision-making framework  the degree of public interest likely in the proposal

EIAScreening5(Gajaseni, 2007) 17 Initial environmental examination (evaluation)  describe the proposal and examine any alternatives that might improve the environmental outcomes  identify and address the concerns of the local community  identify and assess the potential environmental effects  mitigate adverse effects and enhance potential benefits  contain environmental monitoring and management plans

EIAScreening5(Gajaseni, 2007) 18 Project lists: establish a set of specific criteria that can be used to determine which projects will undergo EIA.  requiring full-scale EIA  requiring some form of further environmental analysis  not requiring any further environmental analysis

EIAScreening5(Gajaseni, 2007) 19 Exclusion lists:  The use of exclusion lists is not a common approach to screening.  The use is that the greater number of smaller and less significant projects are given exemption from EIA based on project type or size.

EIAScreening5(Gajaseni, 2007) 20 Thailand: Type and sizes of projects or activities requiring EIA report.  1. Industry  2. Residential building and service community  3. Transportation  4. Energy  5. Water resource  6. Watershed area  7. Mine

EIAScreening5(Gajaseni, 2007) 21

EIAScreening5(Gajaseni, 2007) 22 Lists of actions:  Utilising of positive/inclusive nature  Utilising of negative/exclusive nature  Weakness of lists based on types of action without considering to –size –technology –resource requirements –waste characteristics

EIAScreening5(Gajaseni, 2007) 23 Three possible outcomes of screening process:  1. proposals which do not require additional environmental investigation because it is expected that they will not have significant impacts  2. proposals which require a limited environmental study because the environmental impacts are known and can be easily mitigated

EIAScreening5(Gajaseni, 2007) 24  3. proposals which require EIA to determine the extent and magnitude of range of significant adverse impacts and to propose a range of appropriate mitigation, monitoring and management measures

EIAScreening5(Gajaseni, 2007) 25 Ex: Egypt  3 lists of project criteria; –1. White list  No EIA requirement –2. Gray list  Scoped EIA study may be required. –3. Black list  Full EIA study is required.

EIAScreening5(Gajaseni, 2007) 26

EIAScreening5(Gajaseni, 2007) 27 A framework for screening UNEP Training Resource Manual Topic 4 Slide 27 Increasing impact of development Exclusive threshold