Presentation to Francisco Barreiro.- Engineering Director, Aerosp. Div. Moscow 30th June 2006.

Slides:



Advertisements
Similar presentations
ESWW4, 5-9 th November 2007 Draft Proposal: Space Weather as part of an Optional Space Situational Awareness Programme A.Glover, E. Daly, R. Marsden, A.
Advertisements

GEOSS Workshop 20 September 2013 ESRIN P. Bargellini, Ground Segment and Mission Operations Department, Earth Observation Programmes Directorate, European.
CSTS Service Instance Identification Summary of CSTS Discussions on M.Götzelmann.
Advanced Multimission Operations System (AMMOS)
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
GALILEO INTERIM SUPPORT STRUCTURE EUROPEAN COMMISSION International Civil Aviation Organization GALILEO CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9.
Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
Folie 1 Service Oriented Architecture - Prototyping study - DLR/GSOC Author: S.Gully.
EEE440 Modern Communication Systems Satellite Systems.
DLR IPY Data Portfolio: TerraSAR-X High Resolution SAR Data from Space Erhard Diedrich Head of Division International Ground Segment DLR – German Remote.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
NASA Goddard Space Flight Center Direct Readout Laboratory NPP/JPSS HRD/LRD Status Patrick Coronado NASA Goddard Space Flight Center directreadout.sci.gsfc.nasa.gov/ipopp.
G O D D A R D S P A C E F L I G H T C E N T E R 1 The Trade Between CCSDS and HDLC Framing on Global Precipitation Measurement David Everett and Jonathan.
Monday 13 th November GSY/050388/ © BAE SYSTEMS All Rights Reserved ESA Space Weather Applications Pilot Project Service Development.
1 Volker Liebig (H/ESRIN, D-EOP) Gunther Kohlhammer Head of Earth Observation Ground Segment & Mission Operations Department 06 November 2012 Introduction.
European Network of Excellence in AI Planning Intelligent Planning & Scheduling An Innovative Software Technology Susanne Biundo.
Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram,
Roles and Responsibilities
Mission Operation (MO) Services SM&C-MIA Joint Meeting ESTEC, 27 October 2009 Mario Merri, ESA.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
European Plant-to-Enterprise Conference October 27-28, 2009, Utrecht, The Netherlands Mdf MES Development Framework Massimiliano Papaleo.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
ICT Standards and Guidelines The Structure of the Project Akram Najjar CNSI – Senior Consultant Director of InfoConsult.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
EOP Standard Presentation
.1 RESEARCH & TECHNOLOGY DEVELOPMENT CENTER SYSTEM AND INFORMATION SCIENCES JHU/MIT Proprietary Titan MESSENGER Autonomy Experiment.
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
Page 1 of 35 Achieving Over-The-Horizon Requirements Using Low Earth Orbit Satellites (LEOS) Presented by Eric Saikin.
Supernova/Acceleration Probe (SNAP) Mission/Science Operations Irene Bibyk Tim Rykowski Bob Schweiss June 28, 2001.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
The OIF: A Beacon for Industry Progress and Convergence.
Eye-Sat : an astronomy student nanosatellite CCSDS meeting, March 23, 2015.
ESA DDOR cross support Slide 1 CCSDS Fall Meeting 2007 ESA  DOR cross support Mattia Mercolino, ESA/ESOC.
DSL Distributed Systems Laboratory ATC 23 August Model Mission: Magnetospheric Multiscale (MMS) Mission Goal “To study the microphysics of three.
NASA Use Cases for the Earth Observation Sensor Web Karen Moe NASA Earth Science Technology Office WGISS-26 Boulder,
TRIO-CINEMA Meeting at KHU 1 October 19-23, 2009 CINEMA Operations Manfred Bester.
Network UAV C3 Stage 1 Final Briefing Timothy X Brown University of Colorado at Boulder Interdisciplinary Telecommunications Program Electrical and Computer.
BITTT and CCSDS in China October About BITTT BITTT is the abbreviation for Beijing Institute of Tracking and Telecommunications Technology.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
Office Name Goddard Space Flight Center 1 Proposed SCaN-Cx Interface Study Approach Dave Israel August 24, 2007.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
ESA Harwell Robotics & Autonomy Facility Study Workshop Autonomous Software Verification Presented By: Rick Blake.
Requirements to WSO Ground Segment Lavochkin Association & ROSCOSMOS 30/06/2006.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Spacecraft Monitor & Control Working Group (SM&C WG) CCSDS SM&C WG.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Avivim TA’s Mobility management system. Urban Mobility Management Concept Transportation objectives often conflict  Accessibility Vs. Mobility  Efficiency.
City of Hyattsville City Council IT Briefing October 19, 2015 dataprise.com | #ITinRealLife.
Mission Operation (MO) Services
USNA Next Generation Ground Station
ESA's Ground Station Network Prospects for operations of the Lagrange missions S. Kraft OPS-L , K.-J. Schulz OPS-GS 08/03/2017.
THE EUROPEAN SPACE AGENCY
Design and realization of Payload Operation and Application system of China’s Space Station Wang HongFei 首页.
The RSP Archive System RSP Archive Concept Review 28 September 2017
Exploitation of ISS Scientific data - sustainability
Mattia Mercolino, ESA/ESOC
International Civil Aviation Organization
Ground Segment for WSO/UV
WSO/UV MOC and SOC Technical Definition Decisions to be made
Technology for a NASA Space-based Science Operations Grid Internet2 Members Meeting Advanced Applications Track Session April, 2003 Robert N. Bradford.
Ground-Segment Reference Environment
EOSC-hub Contribution to the EOSC WGs
IOAG – Industry Exchange Workshop
Presentation transcript:

Presentation to Francisco Barreiro.- Engineering Director, Aerosp. Div. Moscow 30th June 2006

Interests & Objectives  To present: TCP’s overall company capabilities and expertise (briefly) TCP’s overall activities in the aerospace sector (briefly, also) A brief summary of the results of Phase A activities conducted by TCP, within AE ESP E TCP’s possible contribution and interests

TCP Sistemas e Ingeniería  TCP Sistemas e Ingeniería, S.L. is a Spanish independent company in the field of Software Engineering  The company was set up in 1992 by a group of professionals coming from the Informatics, Communications and Aerospace businesses  TCP’s headquarter is placed in Madrid (Spain). Besides, the company has offices in Valladolid (Spain), Ashburn (VA, USA) and Sao Paolo (Brazil)  Currently TCP employs nearly 300 highly skilled professionals (90% university graduates)  The Aeroespace Division represents aprox. a 10% of the company

TCP: A bird’s eye view TCP Management systems ITIL Business Processes Requirements Engineering Man-Machine Collaborative Control Systems Mobility Operators& PTTs IT Systems Banks Insurance Co. Aerospace Transport Telecom IRqA SW Factory

Aerospace BU  TCP’s expertise in the aerospace field started since the company origin in  Presently, TCP’s Aerospace Division is formed by 25 engineers working in two main fields of activities: On-board SW Ground Segment: Monitoring and Control (M&C) and Tele-operation applications  Our main customers in this sector are ESA, specially ESOC, and EADS-CASA

On-board Software  Our main fields of expertise in on-board SW are: Real-Time Developments Safety-Critical Developments Testing: Test Harness Generation (THG) Certification (RTCA-DO/178B)  Specifically, TCP is working since 2004 in the development, implementation and validation of a adaptive flight control system for UAV (Unmanned Air Vehicles)  Other open areas in this field include autonomy systems for planetary missions, combining on- board capabilities of control, navigation, planning and autonomous decision making, with ground based capabilities

Ground Segment: M&C Systems  Stations Management: GMCT: General M&C Tools CSMC: Central Station M&C, allows automatic ground station control and fully remote operations FEC-NT: Antenna Front-End Controller, ESA’s baseline for its EO and DSN stations PPIU: Power Plant Interface Unit, provides station power plant M&C SDAS: Building installations supervisory systems Kiruna (CSMC, PPIU, FEC) Redu (PPIU,FEC) Kourou (FEC, PPIU) Goldstone (NDIU) Malindi (FEC,CSMC) Maspalomas (FEC) ESOC (CSMC, PPIU) ESTEC (SDAS) New Norcia, Perth (FEC) Villafranca (PPIU, FEC, CSMC) Cebreros (FEC)

34.  Scientific Operations SAVIO: SOA framework & components for web- based distributed systems DYNACORE: provides instrument remote operation CMMOC: Multimission Scientific Operations Centre Ground Segment: Tele-operation

 Mission requirements and assumptions  Ground Stations Technical requirements  Ground Stations proposed baseline Phase A: Ground Stations System  WP 3400 output documents: Ground Stations part of  Customer Requirements Document  Ground Segment Baseline Definition  Space to Ground Interface Control Document  Final report

Ground Segment Structure GROUND SEGMENT Ground Operations Organisation GROUND SYSTEM Mission Control System EGSE´s Ground Communications Subnet Ground Stations System Supporting Infrastructures MOC SOC Space Segment Control Stations Mission Exploitation Stations

Mission requirements and assumptions Telecommunications:  L2 orbit ( MKm), 5 years nominal mission  15M antennas, in X-band  ESA’s X-b near-earth transponder (like Hershel-Plank)  Max. data rate downlink 1.5Mbps.  Data production rate: 32 Gbits per day.  8 hours/day for downloading the data  Ground Stations under consideration: oArgentina (Falda del Carmen) oP.R. China (Miyun) oRussia (Facilities TBC) oSouth Africa (Sat. Appli. Centre, CSIR) oSpain (Villafranca, ESA)

Mission requirements and assumptions Other:  Minimize need of specific resources  Variable number of centres during the mission lifetime  Minimal requirements on architecture and communications infrastructure. Same configuration HW/SW in each layer  Distributed, international environment, ground segment distributed operations (scientific & mission)  Possible MOCs, SOCs role rotation  Up to 4 ground stations. Normal working hours operations, 2-3 hour-a-day per station

Ground Stations Technical Requirements  Functional requirements (15m antenna)  downlink: Xband. G/T=38Db/K  uplink: X band. EIRP=81dBW  ranging: required but not simultaneous TM rng  data rate: DL 1.5 Mbps / UL: 40/400 bps, 4kbps  data processing: CCSDS standard with Reed Solomon and Viterbi coding  Modulation SCD mode, OQPSK or GMSK  S/No 70dBHz  BER 1E-5 or less. 5dB TM recovery

Ground Stations Technical Requirements  Cross support and interoperability:  M&C: full station configuration and routine operations automation  SLE services: RAF, RCF, CLTU  Raw data storage & archive  Use of COTS  Design, implementation, maintenance  ECSS recommendations and SLE compliance

Ground Stations Technical Requirements  General requirements on Ground Station Network  Need of a GSN Management layer (1 to 4 stations co- ordinated) to ensure 8 h continued operations (routine)  Primary and backup network  TM on line real time transfer to MOC  Science transfer via offline public network  Support systems: operations automation and remote operation. Coordination tools.  Network interface: consider co-located CCs or enough bandwith to fullfill on line comms.

Ground Stations Proposed baseline Some TBDs:  Definition of G/S Service provision, to replace the requirement of identical HW/SW cfg (due to heterogeneous G/S)  WSO/UV mission service agreement  QoS TBD  Req. on G/S layer Coordination with MOC/SOC layer

Now some questions...  Modifications of the space to ground IF ?  Ground Stations to consider ?  Modifications on ground segment concept ?  Communications infrastructure ?  International standards (SLE) assumed ? ... ?

TCPSI possible contribution  Ground Stations  G/S Management (M&C, Automation)  Management of heterogeneous G/S Network:(remote M&C, scheduling and coordination)  Distributed SOC  Science goal tracking tools  planning & scheduling tools  workflow and coordination  remote payload operations via web  simulation framework tools  security tools  Proposals management tools  e-collaboration

C/ Fernández Caro, Madrid SPAIN Tel: ; Fax: