New Reactors Bill Borchardt Director, Office of New Reactors.

Slides:



Advertisements
Similar presentations
New Reactors: NRC Plans, Process, and Progress David B. Matthews Director Division of New Reactor Licensing February 28, 2008.
Advertisements

New Nuclear Plants in the United States
(1) Office of Nuclear Energy, Nuclear Energy – Advanced Fuel Cycles and the Global Nuclear Energy Partnership Buzz Savage Office of Nuclear Energy U.S.
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
Federal Energy and Environmental Regulation Agencies and Laws
Nuclear Energy Progress and Opportunities Moving Forward: Perspective on Building New Nuclear Power Plants Dr. Joe C. Turnage Senior Vice President - Strategy,
OHIO ENERGY POLICY PROGRESS & REVIEW UCEAO 6 th Annual Conference Securing Ohio’s Energy and Economic Future THE BEST OF TIMES, THE WORST OF TIMES: ADVANCED.
New Reactor Activities Joseph Colaccino, Senior Project Manager Division of New Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory.
Slide 1 Doc.ppt 0144 NEW NUCLEAR POWER Ed Cummins Westinghouse Electric Company June 29, 2006.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
NRC Status and Plans for New and Advanced Reactors Michael A. Norato, PhD Chief, Component Integrity, Performance & Testing Branch 2 (BWRs) Division of.
School for drafting regulations Nuclear Safety Combined licensing approach Vienna, 2-7 December 2012 Tea Bilic Zabric.
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
What is killing the Nuclear Renaissance? Presentation at 10th IAEE European Conference Vienna, September 7-10, 2009 Steve Thomas
EU Energy Strategy
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Federal Energy and Environmental Regulation Agencies and Laws
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
1 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 David Cliff UK Licensing Manager AP1000 Westinghouse.
New Nuclear Power and Climate Change: Issues and Opportunities Mary Quillian Director – Business and Environmental Policy Nuclear Energy Institute.
Mary Alice Hayward Vice President, Strategy, Government and International Affairs AREVA, Inc. Williams Mullen Alternative Energy Forum May 26, 2011 Nuclear.
U.S. Nuclear Energy Policy and Outlook After Fukushima Mark Holt, Congressional Research Service October 19, 2011.
NRC Update 2009 New Reactor Licensing Activities
Nuclear Energy: Safety, Radiological Protection and Physical Security in the post-carbon era (Energía Nuclear: Seguridad, Protección Radiológica y Seguridad.
1 Dale E. Klein, Ph.D., P.E. Assoc. Vice Chancellor for Research – The University of Texas System Associate Director – Energy Institute, The University.
Rated # 1 “BEST PLACES TO WORK IN THE FEDERAL GOVERNMENT” Dale A. Powers US Nuclear Regulatory Commission.
WALL STREET UTILITY GROUP The Energy Policy Act of 2005: The Implications for Nuclear Energy 22 September 2005.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Westinghouse Operational Experience and Prospects for New Build
7671-9/06- 1 Nuclear Power Poised for Expansion /06- 1 Jimmy Wang Vice President Bechtel Nuclear.
Comanche Peak Nuclear Power Plant Existing and Proposed Units American Society of Civil Engineers Dallas Chapter November 1, 2010.
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
Nuclear Power Plant New Build Activity: A Market Overview
Engineering Deans Institute 2015 The Future of Nuclear Energy Dr. Terry A. Michalske Laboratory Director April 13, 2015.
Steven Biegalski, Ph.D., P.E. Director, Nuclear Engineering Teaching Laboratory Associate Professor, Mechanical Engineering Dusting off the Atom: Nuclear.
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
New Nuclear Generation Ellen Ruff President, Duke Energy Carolinas.
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting October 22, 2008 Dinner Meeting Tom Mudge.
Plant Parameter Envelope for Early Site Permits
1 Nuclear Energy Division MIT Report on the Future of Nuclear Power in the United-States : review and discussion Eric Proust Director, Industrial Affairs.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
PP571.1 The Prospects for New Nuclear Construction Eugene S. Grecheck Vice President Nuclear Support Services ANS Virginia Section Meeting March 16, 2004.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Greening the Grid with America’s Nuclear Power Plants.
Welcome Carol Berrigan Nuclear Energy Institute July 13, 2015.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
Federal Energy and Environmental Regulation Agencies and Laws
Nuclear Power Update for The Society of American Military Engineers
NRC Cyber Security Regulatory Overview
NEI Perspectives on Small Modular Reactors
Dr. Nils J. Diaz 28th Annual Bonbright Center
Adding Nuclear Power to the Grid
Plant Parameter Envelope for Early Site Permits
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
Presentation transcript:

New Reactors Bill Borchardt Director, Office of New Reactors

1 Nuclear Energy Worldwide There are currently 435 commercial nuclear power reactors operating in 30 countries Nuclear power provides over 16% of the world's electricity and 34% in the European Union. 30 more power reactors are under construction, while over 60 are firmly planned

2 Conditions of the mid-1980s did not favor nuclear construction Energy efficiency improvements Economic restructuring Significant drop in electricity demand Excess generating capacity Oil (traded fossil energy) price collapse Electricity market liberalization & privatization Regulatory interventions after TMI High Interest rates Chernobyl

3 Conditions of today are distinctly different from the mid-1980s Strong energy demand growth Fossil fuels no longer cheap Energy supply security concerns Attractive life cycle costs of nuclear power Pollution control and climate change Excellent operating experience Renewables and efficiency improvements: Low hanging fruit already harvested

4

5 Energy Policy Act of 2005 Authorizes federal risk insurance for the next 6 nuclear plants for delays associated with NRC reviews ($500 M for first 2 plants, $250 M for next 4 plants) Nuclear energy production tax credits for the first 6,000 megawatts of electricity from new advanced reactors Authorizes $3 billion in nuclear research and development to support NGNP and NP2010

6 National Programs NP2010(Nuclear Power 2010): A joint government/industry cost-shared effort to demonstrate key regulatory processes associated with siting and building new nuclear power plants NGNP (Next Generation Nuclear Plant): A demonstration reactor at Idaho National Laboratory that will serve as a test for advanced reactor technologies and for cogeneration of hydrogen by nuclear energy. GNEP (Global Nuclear Energy Partnership): A program to develop new proliferation-resistant recycling technologies in order to produce more energy, reduce waste, and minimize proliferation concerns.

7 NRC Mission NRC Mission Statement To regulate the nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, to promote the common defense and security, and to protect the environment. Office of New Reactors The Office of New Reactors serves the public interest by enabling the safe, secure, and environmentally responsible use of nuclear power in meeting the nation's future energy needs

8 Resurgence of Nuclear Power 29 new plants at 20 sites proposed by the industry Five different plant designs proposed –AP1000 –Economic Simplified Boiling Water Reactor –Evolutionary Power Reactor –Advanced Boiling Water Reactor –Advanced Pressurized Water Reactor

9 New Reactor Licensing Applications Design Cert AP1000 Program Review EPR Program Review ABWR Program Review 2014 Duke – Lee Station (SC) Hearing Progress Energy - Harris (NC) HearingTVA – Bellefonte (AL)Hearing South Carolina E&G-Summer Vogtle ESP Southern – Vogtle (GA) Hearing * Schedules depicted for future activities represent nominal assumed review durations based on submittal time frames in letters of intent from prospective applicants. Actual schedules will be determined when applications are docketed. NRG Energy – South Texas Project Hearing Amarillo Power Hearing Design Certification UniStar-Calvert Cliffs (MD ) Hearing UniStar-Nine Mile Pt (NY) Hearing An estimated schedule by Fiscal Year 8/13/07 ESBWR Program Review Design Certification Dominion - North Anna (VA) Hearing Entergy – Grand Gulf (MS) Hearing Entergy – River Bend (LA) Hearing Grand Gulf ESP North Anna ESP Hearing DC – Mitsubishi USAPWR TXU Power –Comanche Peak (TX) COL Hearing USAPWR Program Review Progress Energy–Levy County (FL) Hearing Legend: Post SER/EIS Hearing (other hearing activities occur during ESP/COL safety and environmental reviews) Design Certification Early Site Permit Combined License Hearing AmerenUE - Callaway Hearing FPL - Site and Vendor TBD Hearing Exelon - Site and Vendor TBD Hearing DTE – Fermi - Vender TBD Hearing Unspecified PPL - SusquehannaHearing Clinton ESPHearing AEH – Bruneau, IDHearing

10 Potential New Reactor Applicants ESBWR Dominion Entergy NuStart US ABWR NRG Energy AP1000 Duke NuStart Progress Energy S.C. Electric & Gas Southern Co. EPR Amarillo Power Ameren UE PPL Generation UNISTAR US APWR TXU Power

11 Part 52 Licensing Process Provide a more predictable licensing process Resolve safety and environmental issues before authorizing construction Provide for timely & meaningful public participation Encourage standardization of nuclear plant designs Reduce financial risk to nuclear plant licensees

December 13, 2005 Early Site Permit Or Equivalent Siting Information* Early Site Permit Or Equivalent Siting Information* Standard Design Certification Or Equivalent Design information* Standard Design Certification Or Equivalent Design information* Combined License Review, Hearing, and Decision* Combined License Review, Hearing, and Decision* Verification Of Regulations with ITAAC Verification Of Regulations with ITAAC Reactor Operation Decision Reactor Operation Decision Optional Pre-Application Review *A combined license application can reference an early site permit, a standard design certification, both, or neither. If an early site permit and/or a standard design certification is not referenced, the applicant must provide an equivalent level of information in the combined license application. Part 52 Licensing Process Pre-Construction Post-Construction

13 Early Site Permits (ESPs) 10 CFR Part 52, Subpart A An ESP is a license (“partial construction permit”) Review scope –Site safety –Environmental –Emergency preparedness Mandatory hearing Permit good for years Allows applicant to “bank” a site Two ESPs issued (Clinton and Grand Gulf), 2 under review (North Anna and Vogtle)

14 Standard Design Certifications Allows an applicant to obtain pre-approval of a standard nuclear plant design through rulemaking Reduces licensing uncertainty by resolving design issues early in the licensing process Facilitates standardization Higher degree of regulatory finality Certification good for 15 years 4 designs approved: (C-E System 80+; GE Advanced Boiling Water Reactor (ABWR); Westinghouse AP600; Westinghouse AP1000), 1 design under review (General Electric ESBWR), 2 designs in pre-application activities (Areva EPR and the Mitsubishi US APWR).

15 Combined Licenses 10 CFR Part 52, Subpart C Combined License (COL) = a combined construction permit and operating license with conditions A COL is the fundamental licensing process in Part 52 for reducing the financial risks for electric companies building nuclear power plants COL can reference ESP, DCR, both, or neither Must meet technical standards in Parts 50, 100, etc. 40 year duration

16 New Construction Nuclear plants will be built more rapidly than their predecessors Detailed engineering will be essentially complete by start of construction Modular construction techniques will be used Fabrication of components may begin before COL issuance Components and modules will be fabricated in other countries

17 Security for New Reactors Commission Policy Statement modified to encourage applicants to consider security early in the design Staff to perform aircraft impact assessments on new designs Part 52 to be revised to require applicants to perform aircraft impact assessments Sharing insights with other countries

18 Digital Instrumentation & Controls Key Technical Issues: –Cyber security –diversity and defense-in-depth –highly integrated control rooms - human factors –highly integrated control rooms - communications –risk-informed digital I&C

19 Multinational Design Evaluation Program Stage 1 – Trilateral agreement to share information and reviews on EPR design –Finland, France, and U.S. Stage 2 – 10 countries participating –Exploring opportunities for convergence of safety goals and regulatory practices Stage 3 – implementation stage

20 Challenges for New Construction Ability of the grid to support new construction Large component manufacturing Workforce / staffing

21 ABWR Design Certification - May MWe evolutionary design Vessel mounted internal recirc pumps Fine motion control rod drives Digital I&C 3 full train ECCS

22 System 80+ Design Certification - May MWe evolutionary design Complete plant design based on System 80 NSSS and Cherokee/Perkins BOP Advanced Control Room Severe accident prevention and mitigation

23 AP600 Design Certification – December MWe advanced reactor design Digital I&C Passive Safety Systems –Passive safety injection –Passive residual heat removal –External reactor vessel cooling

24 AP MWe Passive containment cooling system with steel containment vessel and natural circulation air flow Gravity drain core makeup tanks and refueling water storage tanks Natural circulation heat exchangers connected to RCS Design Certification Rule - December 2005

25 ESBWR “Economic and Simplified BWR” 1390 MWe GE reactor based on Simplified BWR and Advanced BWR Natural circulation Passive safety systems Design Certification Application submitted and staff review underway

26 EPR 1600 MWe evolutionary design Four 100% capacity engineered safety feature trains Double-walled containment Corium spreading area for severe accident mitigation Pre-application review beginning Design certification application planned for late CY 2007