Weld Booths. System Needs and Proposed Solution Weld Booths Primary Needs: 1.Standardize weld booth Better use of space by eliminating unnecessary equipment/materials.

Slides:



Advertisements
Similar presentations
Slips / Trips / Falls Food Service Safety. Applicable OSHA Standards 1.Keep all places of employment clean and orderly and in a sanitary condition. 29.
Advertisements

HVAC523 Heat Sources.
Energy Efficient Steam Systems
Electrical Safety.
Clark–Reliance Company Manufacturing Update Presented to General Electric July 17, 2007.
Electrical Plans.
Welding : SMAW Safety and information
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
OXYFUEL WELDING. INTRODUCTION Oxyfuel welding is a welding process where the heat for fusion is supplied by a torch using oxygen and a fuel gas. Several.
SAFETY TALK - SLIDE 1 OF 14 Elkhart Products Corporation 08/00 WELCOME ELKHART PRODUCTS CORPORATION “TOOLBOX SAFETY TALK” Welding, Cutting, & Burning.
Welding, Cutting, & Burning. GENERAL HAZARDS General hazards of welding include: –Impact –Penetration –Harmful dust –Smoke –Fumes –Heat –Light radiation.
29 CFR CONFINED SPACE ENTRY.
Standard 29 CFR Part Welding, Cutting and Brazing Training.
--OCG Confidential-- OCG Chicago: Kaizen Event Small Turning (Mazak) July, 2013.
HOT WORK PROCEDURES Welding and Hot Work, such as brazing or grinding present a significant opportunity for fire and injury. CCR Title 8 Sub Chapter 7,
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees Faculty Guide: Professor Kaemmerlen.
Project Information Project Name Process Improvement Project Project Number P09457 Project Family Sustainable Technology for the Global Market Track Process.
R-I-T Project Improvement Project Matthew Bonaventura Jimmy Ichihana Eric MacCormack Cody Rath Colin Roy.
Equipment and Setup NCCER Unit 7.
Project Information Project Name Process Improvement Project
Liquid Fuel Safety Cummins Southern Plains, Ltd..
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
Bilan du contrat Renco Piping contract F467 TS workshop Archamps Mai 25 th 2005 R. Principe TSCV.
Pipeline Qra Seminar Title slide Title slide.
P09457 Process Improvement Project Project Review Eric MacCormack – Chief Engineer (IE) Colin Roy – Project Manager (IE) Duke Bonaventura – Engineer (IE)
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
Safe Work Practices in AgMech The importance of AgMech. – Mechanical technology supplies security in the form of food, clothing and shelter.
Hazards on the construction job site could be caused by: human error equipment failure envirmental condition.
Atrium Fire Protection
Week 3. Electrical Code 1. all electrical outlets run off a pigtail from main line 2. Each Circuit is wired directly into circuit panel - no junction.
Housekeeping 2015 POST Safety Forum Rob Rivers.
Slip, Trip, and Fall Prevention What’s Your Safety Temperature?
FORT MCCOY SAFETY INDUSTRIAL OPERATIONS PROGRAM SLIPS, TRIPS, AND FALLS Jan 02.
Arc/MIG/TIG Welding Safety Notes. 1. PROTECT YOUR SKIN by wearing leather or flame resistant canvas coat and gloves. PROTECT YOUR HEAD AND EYES by wearing.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
MNM Fatal Falling Material Accident Falling Material Accident April 4, 2013 (Arizona) April 4, 2013 (Arizona) Copper Operation Copper Operation.
NMED 3700 Production Management. NMED 3700 Today’s Class… Mid-term Evaluation Location Installation.
Probability 2 Compound Probability.  Now lets consider the following:  2 dice are rolled and the numbers are added together.  What are the numbers.
INTRODUCTION. Function of Chillers Remove Cool Control Support.
Potential Terrorist Hazards. Biological Bacteria Viruses Toxins Delivery methods: Aerosols Animals Food and water Person-to- person.
Las Delicias Water Supply System OPERATION AND MAINTENANCE MANUAL 1.
Safety in Work Cells n Issues, mechanisms and equipment, preventative measures.
September Safety Upgrades. Upgraded Safety Equipment We have purchased several new pieces of safety equipment after we failed to meet several OSHA safety.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
In this session, you will learn to: Describe data redundancy Describe the first, second, and third normal forms Describe the Boyce-Codd Normal Form Appreciate.
Fire Safety in the Theater By: Haley Patton Patti Ott Beaney Corral
Spray Booths Follow safe operating instructions. Spray-finishing operations  Organic materials  Inorganic materials  Dispersed form  Deposited to.
SAFETY AND INFRASTRUCTURE REQUIREMENTS FOR TEL-2 INSTALLATION IN THE LAB Paolo Magagnin (BE-BI-ML) 24 – April
Innovation quality reliability Vikoma Vikoflex Boom System December 2015.
POSTECH H uman S ystem D esign Lab oratory Chapter 34 THE NEXT-GENERATION UNIVERSAL HOME Thu. Kim, Hee-jin.
Salmon River CSD Capital Project Phase II Monthly Status Report March & April 2016.
Example 3.1a Sensitivity Analysis and Solver Table Add-in.
Flammable Liquids Directorate of Training and Education
Take 5 for Safety. Security Update  Vulnerability Assessment Dated July 2007 Many people involved in copper cable use Many locations for copper cable.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Learning Objective 1 Describe the classroom settings and arrangements commonly used for fire and emergency services training.
Unit 13 Oil-Burning Equipment
Substructure Groundworks - Hazards
CONFINED SPACE ENTRY TRAINING PROGRAM
UNIT-III MAINTENANCE OF SAFETY
EMERGENCY ACTION PLAN.
Emergency Action Plan Don Ebert- Risk Manager (509)
Parts of the Stage.
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Spray Booths Follow safe operating instructions
Presentation transcript:

Weld Booths

System Needs and Proposed Solution Weld Booths Primary Needs: 1.Standardize weld booth Better use of space by eliminating unnecessary equipment/materials Allow welders the flexibility to use any weld booth 2.Install visual controls to ensure welder is always busy 3.Construct exhaust system to remove gasses generated from welding Suggested Solution: 1.Add pipe rollers to weld booths Productivity → Provide greater flexibility 2.Eliminate argon tanks with direct piping Safety & Productivity → Eliminate the need for welders to go outside and fill up argon tanks (currently 2x per week), alleviating unnecessary lifting and walking 3.Dig trenches for cords Safety → Eliminate cords from lying along the floor 4.Install visual control system (green/white lights) Productivity → Make pipe-fitters aware of when/which welder needs work and make pipe-fitters aware of when welder has completed work 5.Simple exhaust system (add oscillating fans between weld booths) Safety → Welding curtains can remain closed and decrease potential for weld flashing

Proposed Design Weld Booths Work Table ViceStick Rod Rollers Quench Tank Power Supply Welder Rod Oven Lockers Oscillating Fan Cell 1Cell 2 Curtain Entrance Staging Area *Proposed Equipment (listed in red) Argon