Lunar Lander Project Patrick Thurston and David Cobler
Problem VTC is sending a cube-sat to the moon and the Lander needs to be thoroughly tested before a final design can be made.
Mission Diagram
Solution Create a testing system that will repeatadly test the lander under various conditions and record the information gathered.
Technical Details The testing platform will need to simulate: – Varying drop height/mass/velocity – Varying Landing orientations – Varying Terrain conditions – Calculate the shock – Calculate the stability of the lander
System Design Cube Sat Release/Retrieve System Base Adjustment System
Mechanical Aspects
Electrical Large Stepper motor for base Small Stepper motor for inclining base Medium Stepper motor to lift the Lander One Electromagnetic clutch to release Lander An accelerometer in the Lander to measure shock
Logic Flow Lab View/6808 Lifting Motor Controller Base Orientation Motor Controller Lifting Stepper Motor Electromagnetic Clutch Inclined Table Stepper Motor Base Stepper Motor Accelerometer Inclined Table Motor Controller
Budget Three Stepper Motors$100 One Electromagnetic Clutch$25 One Accelerometer$20 Aluminum stock (for frame)$100 Threaded Rod$10 Line Spool$10 Total:$265
Time Management Nov.Dec.Jan.Feb.Mar.Apr.May. Brainstorming Systems Design Programming Electrical Mechanical System Build Test Apparatus Build Testing
Questions?