South Carolina Department of Natural Resources Flood Mitigation Section South Carolina Map Modernization Initiative Update Pee Dee GIS Users Group Meeting.

Slides:



Advertisements
Similar presentations
In coordination with FEMA Kickoff Meeting Riverside County, CA May 27, 2010.
Advertisements

Flood Map Modernization in North Dakota North Dakota State Water Commission FLOOD MAP MODERNIZATION.
Risk MAP Discovery Matanuska-Susitna Borough Information Exchange Sessions March 2013.
Scoping the North Carolina Cooperating Technical State Project Ed Curtis, P.E., CFM, North Carolina Division of Emergency Management Jerry Sparks, P.E.,
FEMA Update: Flood Map Modernization and Risk MAP Presented on behalf of FEMA by David I. Maurstad, PBS&J.
Update on Use of Hazus for FEMA Risk MAP Flood Risk Products Shane Parson – RAMPP PTS (URS)
Update on Hazus AAL Study and Data
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Discovery Meetings [DATE]
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
1 Changes to Alabama Flood Maps Impacts to Flood Insurance Presented By: Leslie A. Durham, P.E. ADECA Office of Water Resources January 23, 2014.
In coordination with FEMA Scoping Meeting Lake County, California February 19, 2010.
Approximate Floodplain Mapping - Procedures and Approaches to Data Challenges Troy Thielen, CFM Brett Addams, CFM May 18, 2010.
Risk Map Early Demonstration Project Lackawanna County, PA CCO Meeting September 13, 2011.
NC Floodplain Mapping Program North Carolina Floodplain Mapping Program Becoming a Cooperating Technical State.
Utilizing a Basinwide Approach for the North Carolina Flood Mapping Program John Dorman, Program Director, NC CTS Flood Mapping Program Gib Jones, P.E.,
§ – Delineation of flood hazard areas and 100-year floodplains; powers of Department; powers of local governments and of the Department. §
HAZUS ®MH Coastal Flood Hazard Analysis FATIH C. DOGAN ABS CONSULTING.
Idaho Risk MAP Activities Ryan McDaniel, CFM Cooperating Technical Partners Coordinator Idaho Department of Water Resources.
North Carolina Neuse River Basin Plan Final Scoping Meetings April 23, 24, and 25, 2001.
CHAPTER 3 MAPS AND MAP CHANGES
Creating Depth Grid from a DFIRM FEMA Region VIII Mitigation GIS Team Wednesday, February 13, 2013.
David Knipe Engineering Section Manager Automated Zone A Floodplain Mapping.
Map Modernization Management Support Best Practices Project - FEMA State of Idaho Idaho Department of Water Resources Boise, Idaho November 2008.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Flood Risk Datasets & Products in Greenville County, South Carolina Agenda Greenville Co, SC Overview Process, Examples, Lessons Learned, and Community.
FLOOD STUDY Rockland County, NY
FLOOD STUDY Oswego County, NY FEMA REGION II February 7, 2011.
The Georgia Flood Map Modernization Program Nolton A Partnership between FEMA, the State of Georgia, and Community Mapping Partners.
Georgia Flood M.A.P. Program
1 US Army Engineer Research and Development Center FEMA REGION III COASTAL MAPPING PROJECT May 19, 2011 Coastal Analyses and Outreach Robin Danforth, FEMA.
National Flood Insurance Program (NFIP) and Map Modernization History and Overview Bill Massey and Sam Crampton Dewberry South Florida Water Management.
Friday, September 30, 2011 Coordinated Needs Management Strategy (CNMS) 2011 Ohio GIS Statewide Conference Tim Beck, CFM – ODNR James Laine, GISP, CFM.
Automated H&H and Advanced Terrain Processing
National Flood Conference April 22, 2009 Victor Hom Hydrologic Services Division Office of Climate, Water and Weather NOAA’s National Weather Service National.
Flood Map Modernization Multi-Hazard Flood Map Modernization NOAA Height Mod Conference 12/1/06 Dave Jula, Michael Baker Jr., Inc.
Back Creek Floodplain SEPTEMBER 2, Why are we here Introductions Almost 300 parcels affected by revised flood study of Back Creek Outline ◦History.
FLOOD STUDY Cumberland County, NJ FEMA REGION II February 22, 2011.
North Carolina White Oak River Basin Plan December 19, 2000.
FEMA Region II Essex County, NJ Digital Flood Insurance Rate Map (DFIRM) FEMA Region 2 Mitigation Division July 14th, :00-11:00.
US Army Engineer Research and Development Center COASTAL OUTREACH ADVISORY TEAM Kick-off Meeting November 19, 2010 FEMA Region III Coastal Mapping Project.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Office for Information Resources GIS Services Flood Map Modernization and the Tennessee Base Mapping Program Dennis Pedersen, Director F&A, OIR – GIS Services.
A Total Water Resource A division of Hayes, Seay, Mattern & Mattern, Inc. North Carolina Floodplain Mapping State of North Carolina North Carolina Floodplain.
National Research Council Mapping Science Committee Floodplain Mapping – Sensitivity and Errors Scott K. Edelman, PE Watershed Concepts and Karen Schuckman,
Behind The Curtain: GIS and Floodplain Mapping Adam Daily, Bradford Hartley, & Adam Pooler GIS Analysts Stantec Consulting Services Inc Ohio GIS.
FEMA Region II Somerset County, NJ Digital Flood Insurance Rate Map (DFIRM) FEMA Region 2 Mitigation Division June 24th, :00-11:00.
North Carolina Tar-Pamlico River Basin Plan Final Scoping Meetings January 30 and 31, 2001.
Assessment of Economic Benefits of the North Carolina Floodplain Mapping Program Hydrologic and Hydraulic Case Studies Adapted from a Presentation to NRC.
Flood Map Modernization and North Dakota Julie Prescott, ND Map Modernization Coordinator North Dakota State Water Commission And Brian Fischer, CFM, GIS.
FEMA’s Risk MAP Coastal Updates – An Overview Jonathan E. Westcott, P.E. ASFPM 2012 National Conference San Antonio, TX Session D.8.
North Carolina Pasquotank River Basin Plan Final Scoping Meetings May 17 and 18, 2001.
Passaic County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division October 6th, :00-11:00.
In coordination with FEMA Kickoff Meeting Ventura County, CA April 29, 2010.
U.S. Department of the Interior U.S. Geological Survey Marie C. Peppler USGS FIM Program Liaison Flood Inundation Mapping Program Project needs overview.
Automated Solutions to Water Resource Evaluations Katherine Skalak, EIT ODNR Floodplain Management Program 2012 Ohio GIS Conference September ,
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
1-Day of 2-D How Are The Results Of Hydraulic Models Used To Manage Floodplain Development Under The NFIP? Eric Simmons, FEMA Region IX.
FLOOD STUDY Burlington County, NJ FEMA REGION II November 29, 2010.
Flood Inundation Mapping Program
FLOOD STUDY Salem County, NJ FEMA REGION II February 22, 2011.
Cape May County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division September 29th, :00-11:00.
Risk MAP Discovery Malheur & Payette Counties Information Exchange Sessions July 2015.
Oregon Statewide Flood Hazard Framework Geodatabase and Web Library, version 1.0 Seamless statewide GIS floodplain element that conforms to standards adopted.
FEMA’s Risk Management Directorate and Flood Mapping Program 2016 National Flood Determination Association Conference Sarah Ice, Risk Management Directorate.
West Virginia GIS Conference WV Flood Risk Mapping Status and Needs Lee Brancheau, GISP FEMA Region III, Risk Analysis Branch May 5, 2016 West Virginia.
North Carolina Lumber River Basin Plan
Risk MAP & the Little River Basin
Risk Mapping, Assessment, and Planning
<<County Name>> <<Date>>
Union County, NJ Initial Coordination Meeting
Presentation transcript:

South Carolina Department of Natural Resources Flood Mitigation Section South Carolina Map Modernization Initiative Update Pee Dee GIS Users Group Meeting February 24, 2010 Florence, SC Daryle L. Fontenot, PE, CFM Project Manager, AECOM 1

National Flood Insurance Program (NFIP) n n Flood Insurance   Property owners in participating communities purchase flood insurance n n Floodplain Management   Participating communities adopt and enforce flood damage prevention ordinance n n Flood Hazard Mapping   Develop flooding limits 2

3 n n Nationwide, 5-year, $1 billion program n n Update FEMA’s Flood Insurance Rate Maps (FIRMs) for the nation’s n n Produce quality maps n n Reduce map production time n n Reduce cost/time for future updates n n Produce seamless, nationwide flood data Map Modernization

Through collaboration with State, Local, and Tribal entities, Risk MAP will deliver quality data that increases public awareness and leads to action that reduces risk to life and property Risk MAP (Mapping, Assessment and Planning)

Risk MAP Builds on Map Mod

Why SC Is Undertaking This Project n n Property owners will be more accurately informed of flood risks, and will be able to make informed decisions when purchasing flood insurance n n Accurate, up-to-date flood hazard information crucial to protect lives and property 6

SC Flood Mapping Program n n Program established to implement the Cooperating Technical State Partnership with the Federal Emergency Management Agency (FEMA) n n Ownership and responsibility for Flood Insurance Rate Maps (FIRMs) delegated to State n n Education local entities on the Map Modernization process, nature and purpose of their study, intent of use of data collected, and post-preliminary process n n QA/QC of all mapping products 7

SCDNR Map Mod Team n n Outreach Coordinator – Vacant n n State NFIP Coordinator – Lisa Jones n n Compliance Specialist – Maria Cox n n Engineering & Mapping Lead – Feleke Arega & Masaaki Kiuchi n n State Hydrologist – Bud Badr n n LiDAR Lead- Jim Scurry n n Lead Engineering Firm AECOM and URS 8

Flood Study Status

Flood Study Completion Schedule

Study Process n n Scoping/Information Search n n Base Map Acquisition n n Terrain Data Acquisition n n Field Survey n n Hydrology n n Hydraulics n n Mapping n n Reporting 11

Study Process Overview 12 (Typically 9 – 12 months) Project Scoping Conducted Base Map Selection DFIRM Production Hydrology & Hydraulic Studies (Includes Coastal modeling|) PDCC Meeting FIS Report Preparation Preliminary Map/Report Production Phase (Typically 18 – 24 months) Post Preliminary Processing (12-18 months)

Digital FIRM 13 Digital FIRM = Flood Data Base + Topography +

Information Search Information Search n n Research on historical floods in each county n n Coordination with other agencies for High Water Mark Information and recent projects 14

Factors for Study Priorities n n Areas of existing or anticipated development n n Area where new road crossings have been built n n Areas affected by flood-control structures and/or channelization n n Areas where natural physical changes in the floodplain have been significant n n Areas that were studied by approximate methods and unmapped areas, especially those with development pressure 15

Factors for Study Priorities (cont.) n n Areas where the community has experienced flooding outside mapped floodplains, with severe damage to buildings and/or infrastructure n n Areas where mapped flood hazards do not match those shown on contiguous FIRMs n n Areas where flood data (BFEs, floodplains, and regulatory floodways) are likely to be changed the most by a restudy 16

Coordinated Needs Management Strategy (CNMS) CNMS   Initiative to update the way FEMA organizes, stores and analyzes flood hazard mapping needs information for communities   Provides an approach and structure for the identification and management of flood hazard mapping needs that will provide support to data driven planning and flood map update investment process in a geospatial environment.   Goal is to produce a national inventory database of flooding sources corresponding to our mapped inventory and to begin referencing mapped flooding sources as validated or as having an unmet need   Three phases to program to be completed and integrated into the Risk MAP program by FY2011:   Phase I – National summary map   Phase II – Stream level inventory   Phase III - Stream level validation

CNMS A spatial Geodatabase that tracks the community’s needs and requests for FEMA-funded flood studies.

CNMS Validation The model validation process utilizes remotely sensed & aerial photos to analyze changes with land use & stream channels. 

CNMS Database Validation criteria for detailed streams are populated & associated with need polygons in CNMS GDB. Streams with invalid models are tracked as “Unmet Needs” along with studies requested by the community that are not funded.

Base Map Information Base Map Sources   County or State Provided Imagery   USGS DOQQ 21

Base Map Information Store and Download Data

Base Map Information Capture /Digitize Waterline and other Data

Terrain Data n n Building block for hydrology & hydraulic study n n Source - Existing topographic data from each county n n New LiDAR data 24

25 WISE Terrain Analyst: DTM to TIN to DEM Terrain Data

TINs for Hydraulics: Cross Sections\Transects, Redelineation, Flood Mapping Terrain Data

DEMs for Hydrology: Flow Vectors, Drainage Area Calculation, Basin Delineation Terrain Data

Study Methods Methods for Updated Mapping   Riverine Detailed Study   Riverine Limited Detailed Study   Approximate Study   Coastal Study   Redelineation (FEMA Studies and Others) 28

Detailed Study n Traditional Detail Study n Sections Field Surveyed Elevation Reference Marks Cross Sections Historic Interviews All bridge and culvert crossings n All Hydraulic Structures Surveyed n Detailed Hydrologic Analysis n Extensive Model Calibration n Traditional Mapping Floodways Floodway Data Table Flood Profile 29

Riverine Modeling Approach 30 Detailed Study Limited Detailed Supported by H&H modeling Hydrology from Regression Equations HEC-RAS models developed Calibrated to available data Floodplain mapped to Terrain data Field Survey Detailed Calibration Floodway Mapping

Riverine Modeling  Results from HEC-RAS brought back into WISE  Mapping performed by intersecting WSEL TIN with ground TIN

Limited Detail Study n Replaces Unnumbered A Zones n Extend to 1sq. mile or limit of Current Zone A n Topo Data Sources USGS 30 meter DEMs USGS 7.5 min hypsography Local / Countywide Topo Data LIDAR n Hydrology Based on Regression Equations (or USGS gages) 32

Limited Detail Study  Hydraulic Models Developed  Hydraulic Structures Measured (No Survey)  Selected Channels Measured  Rough Floodway  Model Review by Engineer  N-Values  Ineffective Areas Considered  Some Calibration 33

Limited Detail Study n Mapping Details  Flood boundaries mapped from model output  BFEs can potentially be shown (as in NC)  Cross Sections Shown on Maps  Flood Hazard Data Tables in FIS Report  Floodways Not Shown  DFIRM database tables/attributes  Can be Considered a Zone AE 34

Approximate Studies n Replaces Unnumbered A Zones n Much more automated approach n Hydrology from Regional Equations n Hydraulic Models Developed  Channel dimensions from rating curve  A more automated cross section placement  Standard N-values are used  No Hydraulic structures are included  No floodway  No calibration to High Water Marks  Limited Model Review / Modifications by Engineer – model defaults accepted 35

Approximate Study n Mapping Details  Flood boundaries mapped from model output  BFEs are not shown (can be provided as a GIS layer)  Cross Sections NOT shown  Floodways Not Shown  Is considered a Unnumbered A Zone 36

Coastal Modeling  Topography  Bathymetry  Stillwater Elevation  Wave Setup  Wave Runup and Erosion Analysis  Wave Height Analysis  Mapping of Flood Elevations and Zones

Coastal Modeling Approach Coastal Detailed Study Coastal Flood Hazard Analysis Wave Runup & Erosion Analysis Wave Height Analysis Mapping of Flood Elevations and Zones to Terrain Data Hydrodynamic Storm Surge Modeling Stillwater Elevation Wave Setup

39 ADCIRC Storm Surge Model Grid Coastal Modeling Storm Surge

40 (1) Model Validation n n Hurricane Hazel n n Hurricane Hugo n n Hurricane Ophelia (2) Production Runs n n ADCIRC n n 2D Wave model (3) Storm Statistics n Produce 10-, 50-, 100-, and 500-yr stillwater plus wave setup values for overland wave modeling Coastal Modeling Storm Surge

Coastal Modeling Wave Height Analysis in WISE   Erosion   Calculations automated – much quicker than CHAMP   CHAMP, WHAFIS, & RUNUP   Exports topo and land use data into CHAMP for WHAFIS & RUNUP   Mapping   Imports results from CHAMP into WISE for mapping

Redelineation 42

Redelineation n Used to Update Effective Mapping with new Terrain Data n Datum Conversion to NAVD 88 from NGVD 29 n Foundation is the FEMA Profile Recreated QC Checked against FDT Datum Shift n Floodways and Cross Sections are Digitized 43

Redelineation n n Stream Stations usually are not adjusted to new topo n n FEMA Lettered Sections are supplemented with “mapping sections” n n Efforts made to ensure tie-ins to downstream and upstream studies n n Notes added to profiles as needed referencing adjacent Limited Detail Studies 44

Redelineation Digitize Rectified Profiles

Floodplain Mapping Fully Automated:   Mapping of flood boundaries   Automated creation of profiles   Placement of BFE’s to FEMA standards   Generation of Floodway Data Tables DFIRM product 46

Floodplain Mapping Example of Flooding in GIS and on Map

DFIRM Product BFE Creation using Tic Marks

DFIRM Product Topology

DFIRM Product Create Polys for s_fld_haz_ar

DFIRM Product Attribute Polys with Flood Zone

DFIRM Product DFIRM.net Example

DFIRM Product MapText Example

DFIRM Product Label Cleanup

South Carolina DFIRM Product 55

100% Digital Submission n n Project upload to FEMA’s Mapping Information Platform (MIP) n n Project Elements Uploaded to MIP as each Element is completed n n Data Availability to Communities 56

MIP Work Bench

MIP Manage Data Development

MIP Task

QA/QC Flood Insurance Study Independent QA/QC n n QA/QC Checklist for Each Production Step   Topographic Data   Hydrologic Data   Hydraulic Data   DFIRM   Floodplain Mapping   DFIRM Database

PM 42 – Quality Control Requirements for DFRIM Map Production

Flood Study Independent QAQC n n Data needed for reviews include (continued):   GIS layers   Streamlines   Basins   Cross sections   Structure locations   Roads

Technical Support Data Notebook (TSDN) n n Complete Documentation of Project n n All Data Collected n n All Analyses & Assumptions n n Uploaded into the MIP 63

Field Surveys Mapping Terrain Data Automated H&H Models

Questions

66 FINIFINIFINIFINI Daryle L Fontenot, PE, CFM Project Manager D x4315 C AECOM 6201 Fairview Road, Suite 400, Charlotte, NC F