Univ. of XXXXXXXXX 1 Things To Include: Team Photo Team Logo/Name.

Slides:



Advertisements
Similar presentations
Whats next in your presentations?. Title Slide Background Problem Statement Solution System Diagram Electrical Circuits Mech. Drawings Code Sample(s)
Advertisements

A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
RAPUNZEL April 28, 2001 Advisory Board Presentation Presenters’ Names April 28, 2001 Advisory Board Presentation Presenters’ Names RAPUNZEL RAP id N oncond.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Proposal Analysis Review NMSGC Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
Colorado Space Grant Consortium Virginia Space Grant Consortium 1 University A University B Team # Logo 1 Logo 2.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
CS 545 Software Systems Design Project Presentation Format Lecture Created by Dan Benson Computer Science Lectures © D. Benson, 2002.
Team Name Conceptual Design Review University/Institution Team Members Date.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
Laser Shoot-Out Game By Steven Noto and Laura Miller Advisor: Steven Gutschlag April 4, 2000 Senior Project Status Report 2.
Factors in information system success or failure.
Team Name Conceptual Design Review Team Members Date Fall 2010 Rev A
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
Full Mission Simulation Test Report Team Name University/Institution Team Members Date.
Comments on this template -Leave time for questions -Leave time for demonstration -Use your actual hardware in the presentation -Practice your presentation.
Team Name Launch Readiness Review Team Members Date Fall 2011 Rev A
RockSat-C 2011 ISTR Individual Subsystem Testing Report Team Name School Date 1 Team Members
P ROMETHEUS 5 System Overview.
Laser Shoot-Out Game By Steven Noto and Laura Miller Advisor Steven Gutschlag February 15, 2000 Senior Project Status.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
BLOCK DIAGRAMS. Block diagrams A way to show schematically the individual subsystems of a design with arrows to show the direction that signals flow through.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
(PDR ) University of Northern Colorado Nathan and Casey 11/14/08.
1 Test Slide Text works. Text works. Graphics work. Graphics work.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME.
ECE445: The Design Review Raj Vinjamuri February 3, 2014.
Multiples of Nine.
ECE 4901 Computer and Electrical Engineering Design I John Chandy
Robotics & Engineering Design Projective Management Chin-Sung Lin Eleanor Roosevelt High School.
It is imperative that leaders and managers at all levels understand their responsibilities and are held accountable for managing information security risk.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Request for Proposal (RFP)
CSC480 Software Engineering Lecture 5 September 9, 2002.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
ECE477 Midterm Design Review: Team #
ECE 4901 Computer and Electrical Engineering Design I John Chandy
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
2013 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
MOSTAFA MAZEN MOIS 549 The ERP Selection Process Survival Guide Article from:
Status Update Instructions (Required by NASA/Wallops) These completed slides are due to no later than Wednesday, March 6 th, 2013,
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
3/21/20161 Project Title Team Name Team membership Customer (if you have a customer) EEL3923C Junior Design (S11) Date: Project #
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram) What solutions.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Project Management PTM721S
Project METEOR [P08102 RITSAT I]
Gauge our progress! Need Statement: Family: ________________________
Individual Subsystem Testing Report
مدیریت استراتژیک منابع انسانی
Team Members Class and Date
RAPUNZEL RAPid NoncondUctive Nadir-Zenith TEther Laboratory
School/Team member names Date
Group No: xx Implementation of Wi-Fi based Home Automation using Master Slave Communication Project Advisor: Dr. Khalid Mehmood ul Hasan Department of.
Team Name Conceptual Design Review
ECE 477 Design Review Team ??  Fall 2012
FRIDAY SLIDES TEMPLATE
Quality Improvement Mid-Point Progress Update 18 October 2018
ORGANIZATION'S NAME HERE:
<Your Team # > Your Team Name Here
Presentation transcript:

Univ. of XXXXXXXXX 1 Things To Include: Team Photo Team Logo/Name

Univ. of XXXXXXXXX 2 Team Overview Things To Include: Organizational Chart

Univ. of XXXXXXXXX 3 Mission Overview Things To Include: 1.Mission Statement 2.Success Criteria/Objectives

Univ. of XXXXXXXXX 4 Design Overview Things To Include: Functional Block Diagram

Univ. of XXXXXXXXX 5 Progress To Date Things To Include: 1.Progress Bar Status a)More bars = progress b)Green = success c)Yellow = some success d)Red = no success 2.Pictures of Actual Hardware % Complete Mechanical Elements Designed Mechanical Elements Fab Mechanical Elements Tested Electrical Elements Design Electrical Elements Fab Electrical Elements Tested Software Written Software Tested Subsystem Testing System Integration Full System Testing

Univ. of XXXXXXXXX 6 Issues And Concerns Things To Include: 1.Team Issues and Concerns 2.Plan to Resolve Issues and Concerns

Univ. of XXXXXXXXX 7 Thank You!