1 Progress for August 3, 2011 The boat shipment with the prime focus cage, cage cart, imager handling system etc … arrived on the mountain top this morning.

Slides:



Advertisements
Similar presentations
DOCKMEN TRAINING LINC LOGISTICS INSIGHTS CORPORATION.
Advertisements

Work Orders Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
AV Controls in the Conference Rooms Trying to Navigate the Changes.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Description On the 12 th July 2011, a truck carrying a container was inspected at the SBS Gantry, prior to being sent to the Quayside. A 4ft long, 4x2.
Step #1 Wash hands using proper hand washing technique Note: please see “Hand Washing” Power Point for more details Cafeteria: Canned Fruit Prep.
Optical Manufacturing Solutions 1 Probe Assembly.
Click on this image to open the full PDF document.
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
Annual Refresher Training. Preliminary Procedure in Glassware Washing Contaminated items. Return glassware that contains chemicals or contamination to.
1 Check all equipment is included before returning. If you have an accident or the equipment is damaged or you need support please contact Blaize
Container Stuffing and Stripping
Step 12 Here is the issue…..the mount for the throttle arm is pushed up against the side of the housing. The problem with this is it allows (due to alignment)
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
RC Helicopter Flight Preparation Checklist / Safety 1 Sylvain Marron Modèle Air Club du Mâconnais Friday, March 4th 2011.
FF-650 Repair Procedure—CMP 30 Frame Reason for Repair—CMP 30 models with Serial Numbers in the range of 2453 through 3354 in Lot 9587, 0008 through 0120.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
The Xbox Story.  Just bought an Xbox or about to buy one?  Have you ever wondered who is involved and how the Xbox gets to you?  Quite simply it moves.
Warehouse Safety. © Business & Legal Reports, Inc Session Objectives Identify warehouse hazards Prevent back injuries Work safely with material-handling.
1 Progress for July 29, 2011 This morning Klaus and Tom programmed the IP addresses into the Hexapod. That worked. Left: sunrise today Right: Klaus’s Office.
MTF SLIT COMPONENTS Adjusting Blocks and Mounting Plate Steel Blocks
ATLAS End-Cap C Proposed Transport Box P Cooke 15 June 2005.
Autoclave Use and Safety
Showing Demonstrations on the TV How to connect the camera to our TV set.
ZTF Interconnecting Scheme Stephen Kaye
Using the Supplier Relationship Management (SRM) CDW-G Punch-out Catalog.
CBL Page 1 – Menu Menu Overview Effective shipment processing Pre-delivery and shipment breakdown Shipment processing and running Accessory processing.
Metrology Issues 9/11/07. Metrology Troubleshooting Advertised tolerance: typical +/- Not sure what these mean. –We fall within.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
SFSP Trivia Do you know it all?. SummerFoodServiceProgramRocks
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Digital Camera Basics Misty Freeman Georgia CTAE Resource Network 2010.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3- Develop Solutions Unit 4- Implement A Solution Unit 5- Test and Evaluate.
By: Kristen McKnabb. Step 1: Aquarium and Aquarium materials Wash the aquarium gravel, rocks, and other decorations. Do not use soap or detergents they.
1 Loscam Limited. 2 Pallets should be stored in a clean and dry facility Secure and with adequate air circulation, free from the possibility of flooding.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
The User Friendly Community 2007 A community that is dedicated to making all of our rooms and procedures User Friendly As of
Shop Built Magnetic LED Light Bob Clark Aug, 11, 2011.
1 Progress for July 17, 2011 Still plenty of snow on the Mt. It is crusty this morning.
1 Progress for July 16, 2011 We woke up to 9+ inches of new heavy snow.
A year in a treatment free apiary in Nebraska. Presentations online Before you take copious notes, all these presentations are online here:
Hatrak Scheduler UsOn Line Demo HATRAK SCHEDLER.
1 DECam in Chile Intro to Dark Energy Survey & DECam Project Status of arrivals in Chile Instrument checkout in Chile Schedule for first light.
Charging Cart Instruction & User Manual EnTrans Technology Co., Ltd.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
LAT Transport Container1 GLAST LAT Project8 September 2005 LAT Transport Container Design Review 8 September 2005 LAT Transport Container Design Review.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 Progress for July 18, 2011 Morning Safety Meeting was held in the Control Room today. Tom & Herman worked with Jim Hughes (remotely) and made a temporary.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
UH-60 Load Out on C-5 Aircraft
Register training Click one of the boxes below to enter a training area Using “My 5 Day Timetable” The student view 1 Using the college register system.
REDLANDS UNIFIED SCHOOL DISTRICT.  Stored in a secure room, the keys travel with the cart, but should not be stored with the cart  Lock the wheels.
1 Progress for July 19, 2011 Preparations for Fill. –4 protection valves were attached: 2 on Z-shaped tubes, 2 on the tank –Herman’s new CTIO engineering.
This will serve as the guide to use at any destination that holds all Toyota product for no starts. Please follow our guidelines at all times. Rail Strategy.
ETS Inside Product Launch
Ladder Assembly All tools and jigs produced Glue dispensing works
DESCRIPTION AND GUIDE TO OPERATIONS
DECam Filter/Shutter Installation and Filters Installation
Maintenance masterdrive siemens
Ski Club Meeting.
2.2 Gallon TourTank Installation
MICE Coupling Coil Update
Lab Cleanup Practices Following Experiments
CHAPTER 45 Engine Lubrication.
Register training Using the college register system
Hybrid & Module Electrical Testing
How to Set Up for an Event
Presentation transcript:

1 Progress for August 3, 2011 The boat shipment with the prime focus cage, cage cart, imager handling system etc … arrived on the mountain top this morning. It had been unloaded from the shipping container onto the flatbed shortly after it was taken off the ship, making it possible for Gale & co. to unload the boxes using a forklift.

2 Unloading the Truck

3 The boxes were taken off by forklift or crane. Dario drove the forklift. Here’s the unloaded truck just as it starts back down. Gale Brehmer in action.

4 Stored Boxes All but one of the boxes were stored inside on the ground floor. Looks like there won’t be any basketball this trip. The box containing the cage and cage cart was stored outside. –Gale is going to cover it with a tarp to protect it against the weather.

5 HexaPod Progress for Aug. 3 Brenna, Alistair, Klaus, Steve and Tom met with GG and Danielle from ADS and reviewed out experience with the hexapod during this trip. We discussed the significance. –The ~70 micron shift in X max corresponds to a 4 um shift in the position of the faulting joint limit switch on actuator 2. –We agreed that this small shift maybe due to either the vibration from the shipping or even simply because the Coude Room is at 50 deg and previous tests have been at more like 70 deg F. Hexapod –It is important to ensure nothing can “come loose” after we mount the hexapod on the barrel. –A software and/or firmware update with a new limit inside X=15930 can be performed at any time we are in position to power the hexapod rack.

6 HexaPod Progress for Aug. 3 Steve and Tom identified the offending limit switch (#4 of 8). It’s on the underside of the #2 flexure. –These limit switch contacts look very sensitive and delicate, so we stayed away from them –We noticed that the upside-down bolts on the underside had no Loctite but all the right-side-up ones on other limit switches did. –Steve tightened the 7mm hex-head bolts (2) that attach that joint limit switch shim plate to the flexure knuckle. They turned ~1/12 to 1/6 of a turn. It is important to note that they weren’t loose. –Steve also slightly tightened the corresponding bolts on actuator #6. –The ones on #4 didn’t move. –The limit switch is still engaged at X ~ microns, as before. Steve checked the long power cables. They are OK. We reran the full motion test and recorded the data for later analysis.

7 Progress for August 3, 2011 The Filter Changer and Shutter are buttoned up. And in the Coude Room. Ken & Cheryl worked in the carpentry shop near the warehouse area. Carpentry Shop They made progress on assembly and painting of 3 cabinets. The color: nobody but Cheryl (and Ken) knows. Ken and Cheryl returned to La Serena and will be back early tomorrow.

8 Next Steps & Plan Hexapod –Secure the hexapod, leaving it safely stowed in the Coude Room for the late September trip. It will be warmer – we can check the temperature dependence of the limit switch position. –Steve will take the 6 short power tails from the rack (that his power cables plug into) back to FNAL for retermination. Finish & fill cabinets Put a tarp over the box containing the Cage. Recover the boxes that we wanted to keep from the outdoor trash pile.