Gary MKIII Results University of Central Florida Chris Valle, Braden Urban, John Rowe, and Tyler Yoemans.

Slides:



Advertisements
Similar presentations
Charging System Tests & Voltage information Checking the charging system with just a volt meter.
Advertisements

 A telescope collects light coming off an object, like the moon, planets, and stars.  It focuses the light and magnifies it, making the object appear.
Team K^3 + C Final Team Presentation Khin Oo, Kim Gleffe, Carlie Bolin, Katelyn Harder AEM /16/11.
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Solar Cell Efficiency Flight Readiness Review Teddy Bounds Angela Dunn Joel Sasser.
Closing Summary Design Testing Abstract Monitoring crop heath via aerial photography is a proper technique used to maximize agricultural productivity.
Team: Jessica Avitia Mary Begay Daniella Eriksson Bryce Fox Mentors: Jack Crabtree Dr. Ronald Madler ASGC Symposium 4/18/2009ASGC Symposium.
TJ Sulliv an Matt Salazar Curt Watson Team Members.
Gary MKIII University of Central Florida Chris Valle, Braden Urban, John Rowe, and Tyler Yoemans.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
CASTOR Jr. MIT 2LT Corey Crowell 2LT Matt McCormack Lucas de la Garza Spenser Parra.
University of Kansas EPS of KUTEsat Pathfinder Leon S. Searl April 5, 2006 AE256 Satellite Electrical Power Systems.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team Helios. Mission and Experiment Mission: Launch a balloonsat to determine the light filtering effect of the atmosphere and test the effectiveness.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Team Mate Launch Readiness Review Jason Schelz, Will Hakes, Emma Mossinger, Ethan Long, Brendon Barela, Amelia Weller 11/02/10.
Team T.E.N Final Presentation Nate Bolt Greg Frank David Maier Luke Pederson David Stagg Matthew Stephenson 12/05/2006.
Teamo Supremo Final Presentation Kristen Brenner Kim Fornall Ahna Isaak Nick Martinez Wes Roos Bart Tofany RevD
Introduction to the Computer
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn December 7, 2006.
Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006.
Carnivorous Ninja Warriors Launch Readiness Review Katie Brissenden, Hannah Williams, Aram Podolski, Kat Bryant, Arley Hendrick, Cam Comeau November 5,
Baby Sat University of Missouri-Rolla Carl Seubert Jason Searcy Josh Jacob Michelle Rader.
PHSAUTOMOTIVESALSPHSAUTOMOTIVESALS Charging System tests & Voltage information Checking the charging system with just a volt meter.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
JAKE BINNEY JAMEY GRAHAM LOUISE MARTINEZ JACK OAKES MARCUS RAHIMPOUR ERIN TUCKER JAKE BINNEY JAMEY GRAHAM LOUISE MARTINEZ JACK OAKES MARCUS RAHIMPOUR ERIN.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Indicator Statement: Analyze the functioning and applications of electrical systems. Objective(s): Explain science and mathematical concepts applied in.
Dionysus Final Presentation 12/01/09 Alijah Smith Josh Tiras Chris Koncilja Mike Beach Elise Kowalski Becca Seigel.
University at Buffalo GLADOS SHOT II Balloon Payload Presentation June 29, 2012 Andrew Dianetti, Alex Wende, Bryant Carlson, Joe Flannery 1.
ACTIVITY – 1 IDENTIFY VARIOUS HARDWARE ELEMENTS OF THE PERSONAL COMPUTER SYSTEM BRIDGE COURSE of INFORMATION & COMMUNICATION TECHNOLOGY.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
James Bader, Jordan Dickard, Blake Firner, Amanda Kuker, Michael Lotto, Diana Shukis
Ryan Olin, Austin Granger, R.J. Kakach, Seth Frick, Joey Senkyr AEM /24/09.
Current Electricity Parallel Circuit Notes Rule #1: In a parallel circuit electrons have more than 1 path to follow.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
MinnRock Design and Canister Layout Team members Bryce Schaefer (team coordinator)- AEM Cameron Japuntich- AEM Liz Sefkow- ME Mitch Andrus-
The Balloon Launch “Spacecraft” and Environment ACES Presentation T. Gregory Guzik February 20, 2003.
Space Monkeys Launch Readiness Review Project Curious George November 11, 2008 Project Curious George November 11, 2008.
Flight Testing Small Satellites Through High Altitude Ballooning Presented by Zach Henney 18 April 2015.
Patrick O’Brien, Sara Monacelli, Tiffany Monroe, Madison Wiebe, Andy Broucek, Jacob Haynes 11/30/09.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
1 ARMADILLO – SHOT II The University of Texas at Austin Post-flight Analysis Travis Imken Shaina Johl Christopher McBryde Travis Sanders July 1 st, 2012.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Arizona Space Grant Symposium April 19, 2008 SWE Imaging Payload Command and Data Handling Jordan Cluster.
Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Matt Uhlman Ian Chen 1.
Aero Week 7 Robbie McNally. What I did... -Talked to Russo  Clarified DAS precision requirements -Submitted EcE department funding letter -Setup time.
Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Ian Chen Matt Uhlman 1.
Hardware Introducing the Components of a Computer.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
Scott Luisi, Abe Fark, Trent Quick, Jack Szmanda, Tom Valkenberg AEM 1905, 11/20/2008.
1 ARMADILLO – SHOT II The University of Texas at Austin Travis Imken Shaina Johl Christopher McBryde Travis Sanders June 29, 2012 Boulder, CO.
Computer Basics. What a computer does INPUT  Computer INPUT is whatever is typed, submitted or transmitted to a computer system. It can be supplied.
Simulation-to-Flight 1 Additional Resources:
THE Project.
Telemetry system The telemetry, tracking, and command (TT&C) subsystem performs several routine functions abroad a spacecraft. The telemetry or "telemetering"
Team Go Go Gadgets Launch Readiness Review
Team Thumbs Up Final Presentation
Preliminary Design Review
Extend power point An addition to our orientation power point
Launch Readiness Review
Team Super 8: Sat Morpheus Final Presentation
While Driving Why the Car Battery Lights On.
The Computer Work Stations
Project METEOR [P08102 RITSAT I]
CSU DemoSAT-B 2010 DemoSat V: Colorado State University April 9, 2011
Parallel Circuit Notes
Year 9 Entry Level Computing
Presentation transcript:

Gary MKIII Results University of Central Florida Chris Valle, Braden Urban, John Rowe, and Tyler Yoemans

Mission Collect and transmit temperature, pressure, and altitude data, as well as take a picture at 80,000 feet. – Use temperature data to activate and turn off heaters, ensuring the interior of the box is kept above 10 degrees Celsius. – Use pressure data to estimate altitude using function stored in computer, and activate camera at desired altitude. – Use the power distribution board in conjunction with the computer to activate and turn off components. – Transmit data to ground with radio, as well as store it on onboard SD Card.

Results Successfully transmitted data back to ground station, but lost reception shortly after launch Unable to retrieve data stored due to some SD card issues. Uncertain if camera took picture until able to retrieve data from the SD card.

What We Learned Should have used a wire harnessing system to make wire management easier and neater An voltage monitoring system should be used on the EVK to shut down before batteries were drained A full system run should have been done from mission start until the batteries were drained