Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010.

Slides:



Advertisements
Similar presentations
Proposal for a programme of Neutrino Factory research and development WP-3 The Target The Neutrino Factory Target Lead Author - J R J Bennett CCLRC, RAL.
Advertisements

Mercury Chamber Update V. Graves NF-IDS Meeting October 4, 2011.
Global Design Effort Compact Water Cooled Dump Resistor IRENG07 Wes Craddock September 19, 2007.
Oak Ridge SNS Experimental Facilities X /arb 1 SNS MPS Review Target-MPS Review WBS Ron Battle Target Controls, Target Systems Experimental.
A Neutrino Factory Target Station Design based on Solid Targets J. R. J. Bennett STFC, Rutherford Appleton Laboratory, Harwell Science.
CE 230-Engineering Fluid Mechanics Lecture # BERNOULLI EQUATION.
Managed by UT-Battelle for the Department of Energy Neutrino Factory Mercury Containment Concepts V.B. Graves 2 nd Oxford-Princeton High- Powered Target.
Neutrino Factory Target Cryostat Review Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 11 Mar 2009 Neutrino Factory Cryostat 1 Concept V.B. Graves MERIT Videoconference.
1Managed by UT-Battelle for the U.S. Department of Energy NF/IDS Hg Vessel Layout 30 Jun 09 Cryostat 2 Front Drain Mercury Vessel Concept Matthew F. Glisson.
Mercury Nozzle Status V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004.
High Power Hg Target Conceptual Design Review Hg Target Design P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National Laboratory February 7-8, 2005.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Targetry R&D in the 5-Year Plan Harold G. Kirk Brookhaven National Lab.
KT McDonald Muon Collider 2011 June 28, The Target System Baseline K. McDonald Princeton U. (June 28, 2011) Muon Collider 2011 Telluride, CO More.
Above: Energy deposition in the superconducting magnet and the tungsten-carbide shield inside them. Approximately 2.4 MW must be dissipated in the shield.
1Managed by UT-Battelle for the U.S. Department of Energy NF-IDS Videoconference 2 Jun 2009 Neutrino Factory Magnet Layout Comparison V.B. Graves NF-IDS.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
KT McDonald Target Studies Meeting June 14, Mechanical Issues for the Target System K. McDonald Princeton U. (June 14, 2011) Target Studies Meeting.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
1Managed by UT-Battelle for the U.S. Department of Energy NMFCC Friday Meeting 10 Apr 2009 Neutrino Factory Nozzle Layouts V.B. Graves NFMCC Friday Meeting.
IDS-NF Target Studies H. Kirk (BNL) July 8, 2009.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
1Managed by UT-Battelle for the U.S. Department of Energy NF Splash Mitigation 12 July 2011 Neutrino Factory Mercury Pool Splash Mitigation V.B. Graves.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
Fluid Mechanics 06. Energy, Work and Power Work:- Work is force acting through a distance when the force is parallel to the direction of motion. Energy:-
The Front End MAP Review Fermi National Accelerator Lab August 24-26, 2010 Harold G. Kirk Brookhaven National Laboratory.
1Managed by UT-Battelle for the U.S. Department of Energy MERIT Videoconference 5 Aug 2009 Cryostat Front End Design Update Matthew Glisson Van Graves.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
Bulk flow—Pressure difference Plant Physiology UNI 2009.
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
MER Design of Thermal Fluid Systems Pumps and Fans Professor Anderson Spring Term
Managed by UT-Battelle for the Department of Energy Hg System Decommissioning Activities V.B. Graves NFMCC Friday Meeting Feb 29, 2008.
1Managed by UT-Battelle for the U.S. Department of Energy PASI_2012_Flowing_Target_Challenges Challenges for Flowing Targets Bernie Riemer (ORNL) (Jan.
-Fact 99 cdj Experiments with liquid jets C.Johnson CERN History CERN Mercury Jet Target - version 1985 Muon Collider Collaboration Targetry Workshops.
A powder jet target for a Neutrino Factory Ottone Caretta, Chris Densham (RAL), Tom Davies (Exeter University), Richard Woods (Gericke Ltd)
Neutrino Factory Mercury Vessel: Initial Cooling Calculations V. Graves Target Studies Nov 15, 2012.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Next generation of ν beams Challenges Ahead I. Efthymiopoulos - CERN LAGUNA Workshp Aussois, France, September 8,2010 what it takes to design and construct.
1 cm diameter tungsten target Goran Skoro University of Sheffield.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Review of Recent IDS120 Target Concepts Van Graves October 31, 2013.
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
20to2T5m100cm Images Van Graves February 13, 2014.
K. McDonald Target Studies Meeting June 29, Materials for the Target System Internal Shield K. McDonald Princeton U. (June 27, 2010) Iron Plug Proton.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Target and Pion Collection System and Support Facility
1 Target Station Design for Neutrino Superbeams Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory NBI 2012, CERN.
K. McDonald MAP Technical Board Meeting Nov 1, FY11 Target System Budget Proposal K. McDonald Princeton U. (November 1, 2010)
IDS120j WITHOUT RESISTIVE MAGNETS MODIFYING Hg MODULE Nicholas Souchlas, PBL (11/1/2012) 1.
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
IDS120j WITH AND WITHOUT RESISTIVE MAGNETS PION AND MUON STUDIES WITHIN TAPER REGION, III ( 20 cm GAPS BETWEEN CRYOSTATS ) Nicholas Souchlas, PBL (9/4/2012)
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BEAM PIPE BEYOND FIRST CRYOSTAT ( 20 cm GAPS AND 15.8 g/cc W BEADS ) Nicholas Souchlas, PBL.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
Neutrino Factory Target Vessel Concept Update V. Graves Target Studies EVO June 12, 2012.
Neutrino Factory Target Cryostat Review (Update Aug 12) Van Graves Cale Caldwell IDS-NF Phone Meeting August 10, 2010.
The Development of Fluidised Powder Target Technology for a Neutrino Factory, Muon Collider or Superbeam Chris Densham Ottone Caretta, Peter Loveridge.
MCTF Harold G. Kirk MUTAC 5-Year Plan Review 22 August Other R&D Harold G. Kirk Brookhaven National Lab.
Target On axis field [scale /20 T] Target Magnets Decay-Channel Triplets Taper magnets.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
Design of Cold Water Networks
Troubleshooting Hydraulic Pumps
Neutrino Factory Mercury Catcher Concept
V.B. Graves Hg Jet Design Meeting Princeton University Nov 15, 2004
Presentation transcript:

Neutrino Factory Mercury Flow Loop V. Graves C. Caldwell IDS-NF Videoconference March 9, 2010

2Managed by UT-Battelle for the U.S. Department of Energy IDS-NF Videoconference, 9 Mar 2010 Flow Loop Review 1 cm dia nozzle, 20 m/s jet requires 1.57 liter/sec mercury flow (94.2 liter/min, 24.9 gpm). MERIT experiment showed that a pump discharge pressure of ~40 bar gauge required to produce the desired jet. – Reference: SNS nominal flow 1440 liter/min (380 gpm), 7 bar gauge pump discharge pressure, ~1400 liters total Hg inventory Basic flow scheme Pump → Nozzle → Jet/Beam Dump → Heat Exchanger → Pump

3Managed by UT-Battelle for the U.S. Department of Energy IDS-NF Videoconference, 9 Mar 2010 Hg Flow Minimize pressure drops through piping by increasing diameter – 2" nozzle supply piping transitioning to 1 cm nozzle Actual NF Hg inventory may reach SNS volumes – ~500 liters in the half- length beam dump shown Overflow Mercury Drain Mercury Pump Gravity Drain Flow Control Valve Storage Tank Heat Exchanger Beam Dump

4Managed by UT-Battelle for the U.S. Department of Energy IDS-NF Videoconference, 9 Mar 2010 Gravity Drain Requires Flow Control Bulk flow exits dump via overflow drains Gravity drain intended to remain closed until end-of run, but this liquid becomes static Decay heating requires gravity drain to have flow control Mercury Jet Proton Beam Mercury Overflow Gravity Drain Flow Control Overflow drains WC Shielding

5Managed by UT-Battelle for the U.S. Department of Energy IDS-NF Videoconference, 9 Mar 2010 Target Building Based on Study 2 concept Mercury loop "hot cell" will probably extend into magnet chase – Could require double containment of mercury – Chase will certainly have a drain back into hot cell Decay Channel Cryostats Core Vessel Mercury Process Hot Cell Main Cryostat (Target Region)

6Managed by UT-Battelle for the U.S. Department of Energy IDS-NF Videoconference, 9 Mar 2010 Heat Removal From Study 2, the mercury jet/pool receive < 10% of beam energy; bulk goes into WC shielding – Currently assumed to be WC spheres cooled by water – Much larger heat exchanger needed to cool shielding Considering that both W and WC must be water-cooled, their effective densities will approach that of Hg. Consequently, IF a Hg target is selected, the infrastructure will be in place to support use of Hg as a solenoid shield. – Would probably be a separate loop due to vastly different flow/pressure requirements, but could share a storage tank Element/CompoundDensity (g/cm^3) Hg13.5 W19.3 WC15.8

7Managed by UT-Battelle for the U.S. Department of Energy IDS-NF Videoconference, 9 Mar 2010 Future Work – Continue development of Target Building infrastructure conceptual design – Look further into the mechanics of the region upstream of the nozzle Remote maintenance / assembly / disassembly Mercury flow