1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

K. Long, 18 April, 2015 Beam-line status — red sky at night?
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 114 September 18, 2008.
MICE RF Module Safety Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting February 12, 2005.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Brian Martlew 6 th June 2006 Controls Ground Rules Brian Martlew.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Spectrometer Solenoid Update Steve Gourlay Steve Virostek Lawrence Berkeley National Lab Steve Gourlay Steve Virostek Lawrence Berkeley National Lab MICE.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Vacuum and cryogenic systems in R5.2 for MICE Presentation to the MICE/ISIS Operations meeting on 16/03/2015.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Electrical & Control Power Supplies Trevor Hartnett.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
Spectrometer Solenoid: Plans to Fix Magnet 2 Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Spectrometer Solenoid Overview Roy Preece 31 st January 2011.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 6, 2009.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Adrian Oates Graham Cox Daresbury Laboratory MICE Control System DL Contribution June 09.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE Spectrometer Solenoids Step IV running
S A Griffiths CM42 June 2015 Electrical & Control.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
HMS Status Steven Lassiter Jan 20, 2017.
MICE Absorber and Focus Coil Magnet – Test Results
Chris Booth Sheffield 29th March 2006
Status of the MICE Construction Project
MICE NEWS MICE VC 155 Next Collaboration meeting will be
352MHz Klystron Control for the 3MeV Linac test stand
Focus Coil Quench Detector
EPICS Controls Steve Lewis 13 December 2007
Presentation transcript:

SS and AFC Control Systems Brian Martlew 21 st Sept 2011

2 - Overview Initially the plan was only to design and build control systems for integration of the Spectrometer Solenoid and AFC into the MICE hall. During the formulation of a recovery plan for the SS the need for a control system that could be used during the cooldown, testing and field mapping was identified. Similarly, a requirement for monitoring and control during the cooldown and testing of the AFC at Tesla and RAL exists. DL has taken on responsibility for the design, build and commission of both systems (as well as the final hall systems).

3 - Design Requirements for both systems are similar, therefore a common hardware design has been developed. 19” rack VME crate – MVME5500 PPC CPU RS232 Serial comms 16-bit analogue input/output DL standard Canbus interlock modules Cable terminals for connection of instrumentation, PSUs etc. EPICS with control synoptics, archiving etc This is essentially identical to other DL supplied systems already in use on MICE (ie. DS, beamline magnets, target).

4 - Spectrometer Solenoid - Details Detailed document produced by Ian Mullacrane detailing interface and control requirements. Included: Control/monitoring of magnet power supplies Monitoring of temperatures Monitoring of levels Control of heaters Control/monitoring of cryo-compressors Not included: Vacuum monitoring – provided by FNL Monitoring of voltage taps / quench detection – FNL Process control requirements still being developed – but minimal needs anticipated for cooldown and initial testing

5 - AFC - Details Requirements from Tom Bradshaw For testing at Tesla: Monitoring only For acceptance tests in R9, RAL Monitoring Quench protection (likely to be minimal) For full hall integration Monitoring Quench protection Control of top plate temp & pressure Remote monitoring and control Automation

6 – Project Milestones 30 th SeptProcurement complete 28 th OctAssembly of AFC rack complete 15 th NovAFC rack testing at DL complete 17 th NovAFC rack ready for shipping 24 th NovAFC rack delivered to Tesla 18 th NovAssembly of SS rack complete 6 th DecSS rack testing at DL complete 8 th DecSS rack ready for shipping 22 nd DecSS rack delivered to Wang NMR

7 – Future Systems for hall integration of both SS and AFC will be of very similar design and will incorporate lessons learned during the early stage testing Plan is to re-use one of the portable systems for testing of RFCCs (details yet to be agreed)