1 GOES-R Calibration Working Group (CWG) June 16, 2010 Presented By: Changyong Cao 1 NOAA/NESDIS/STAR CWG Progress Update.

Slides:



Advertisements
Similar presentations
Jeffrey Kronenwetter PLT Director PLT Coordination & Field Campaign Preparations.
Advertisements

GOES-R Program Calibration and Validation Robert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (1), Steve Goodman (2), Changyong Cao (3), Jaime Daniels (3),
GOES-R Ground Segment Project Robin Pfister Deputy Project Manager, GOES-R Ground Segment 6 th GOES Users’ Conference Madison, Wisconsin Tuesday, November.
Reflected Solar Calibration Demonstration System Update J. McCorkel K. Thome D. Jennings B. McAndrew J. Hair D. Rabin A. Daw National Aeronautics and Space.
Greg Mandt GOES-R System Program Director 2011 GOES-R Proving Ground Annual Meeting Boulder, CO May 17, 2011.
GOES-R Ground Segment Project Update American Meteorological Society Annual Meeting Atlanta, Georgia January 20, 2010 Vanessa Griffin Project Manager,
An Overview of the GOES-R Program
Bob Iacovazzi Jr. September 20, 2011 GOES-R GLM Calibration GLM Science Meeting 2011.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
Calibration and Status of MOBY Dennis Clark, NOAA/NESDIS Carol Johnson, NIST Steve Brown, NIST Mark Yarbrough, MLML Stephanie Flora, MLML Mike Feinholz,
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
Calibration Working Group L1b Cal/Val Update 1 Presented by Changyong Cao NOAA/NESDIS/STAR GOES-R Calibration Working Group January 9, 2014.
July 10, 2013 Space Weather Product Team (SWPT). Outline 2 SWPT Roster SWPT Timeline (1) GOES-R Pre-launch Timeline (1) SPADES Overview (2) Cal/INR/Product.
NOAA Research and Operations Marine Optical Buoy Design Review July 18-19, 2006 Plan for calibration and maintenance of AHAB Uncertainty Budget: Laboratory.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Sensor Calibration/Validation.
Bob Iacovazzi, Jr. GOES-R POSST Ops Manager (POM) January 9-10, 2014 GOES-R Product Operations Science Support Team: Planning for GOES-R Cal/Val AWG Second.
May 15, 2013 Space Weather Product Team (SWPT) Making Sense of the Nonsensical.
March 26, 2014 Space Weather Product Team (SWPT) Kick Off Meeting.
GOES-R Program Calibration and Validation (Cal/Val) Robert A. Iacovazzi, Jr.* (1), Edward C. Grigsby (2), Steve Goodman (1), Changyong Cao (3), Jaime Daniels.
GOES-R Calibration & Validation Update
1 GOES-R Update Greg Mandt System Program Director GOES User Conference 3 Nov 2009.
2013 GOES-R AWG 2 nd Validation Workshop January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
Robin Pfister (GOES-R Ground Segment Deputy Project Manager)
FLEX-US 2013 Airborne Campaign
Sentinel-3 Validation Team (S3VT) Meeting ESA/ESRIN, Frascati, Italy, th November 2013 General Presentation Template for S3VT meeting Project name.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
GOES-R Ground Segment Project Robin Pfister Deputy Project Manager, GOES-R Ground Segment GOES Users’ Conference Madison, Wisconsin Tuesday, November 3,
TOWR-G Test for Operational Weather Readiness with GOES-R Joe Zajic NWS Office of Science & Technology – Science Plans Branch Integrity Applications Incorporated.
2015 AMS Annual Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES- R.
2015 GLM Annual Science Team Meeting: Cal/Val Tools Developers Forum 9-11 September, 2015 DATA MANAGEMENT For GLM Cal/Val Activities Helen Conover Information.
2015 OCONUS Meeting Non Export-Controlled Information Progress in Development and Integration of the Product Generation Capabilities of the GOES-R Ground.
Calibration/Validation of the NPOESS NPP Instruments: Plan Overview National Polar-Orbiting Operational Environmental Satellite System Karen St.Germain,
NOAA Science Week – Kansas City, MO. 30 April 2012 Non Export-Controlled Information GOES-R – System Validation and User Readiness Planning Stephen D.
1 Solar / Geophysics – 23 February 2015 Solar / Geophysics W. Denig, Chief Solar & Terrestrial Physics Division NOAA/NESDIS/NGDC
V: Instrument & Product Calibration / Validation
VIIRS Product Evaluation at the Ocean PEATE Frederick S. Patt Gene C. Feldman IGARSS 2010 July 27, 2010.
Calibration and validation of satellite sensors 1 Sharlene-Asia Naicker Maanda Rambau Sedzani Elia Muravha Amanda Forbes Busisiwe Nkuzani Busisiwe Nkuzani.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Stephen Ambrose GOES-R Data Operations Manager (DOM) OSPO/SPSD March 12, 2013 GOES-R Ground Segment Project Data Operations Support Team System Validation.
 Establishing state-of-the-art coding, documentation, configuration management standards for the AWG.  Software development process comparable with CMMI.
Satellite Precipitation Estimation and Nowcasting Plans for the GOES-R Era Robert J. Kuligowski NOAA/NESDIS Center for Satellite Applications and Research.
SeaWiFS Calibration & Validation Strategy & Results Charles R. McClain SeaWiFS Project Scientist NASA/Goddard Space Flight Center February 11, 2004.
GLM Annual Science Team Meeting Cal/Val Tools Developers Forum 9-11 September 2015 GLM PLT & Cal/Val Status William Koshak, NASA/MSFC.
Radiometric Calibration PROBA-V QWG #2. PRESENTATION OUTLINE »Introduction »Stability of PROBA-V »ICP updates since QWG#1 »Outlook »Moon calibration GSICS.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Double Differences of BTs in AVHRR Ch4 from MICROS Climate Quality Calibration.
Agency xxx, version xx, Date xx 2016 [update in the slide master] Coordination Group for Meteorological Satellites - CGMS Introduction to GSICS Presented.
Matt Seybold (OSPO/SPSD) GOES-R Data Operations Manager & PRO Team Lead NOAA Satellite Proving Ground and User Readiness Meeting May 9, /9/2016NOAA.
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
1 CLARREO Advances in Reflected Solar Spectra Calibration Accuracy K. Thome 1, N. Fox 2, G. Kopp 3, J. McCorkel 1, P. Pilewskie 3 1 NASA/Goddard Space.
NOAA GPRC Report 2013 GSICS Annual Meeting Williamsburg, VA 03/04/ /08/2013.
Matt Seybold (OSPO/SPSD) GOES-R Data Operations Manager & PRO Team Lead NOAA Satellite Proving Ground and User Readiness Meeting May 9, /9/2016NOAA.
NOAA Transition to New Direct Readout Systems for JPSS Presented to CGMS-44 Working Group 1, agenda item 3.2.
NOAA VIIRS Team GIRO Implementation Updates
Fangfang Yu, Fuzhong Weng, Xiangqian Wu, and Ninghai Sun
I&T&C Organization Chart
NESDIS-JMA AHI Collaboration
Fangfang Yu and Xiangqian Wu
GOES-R Calibration Working Group Meeting with CNES Calibration Group
GOES-16 ABI Lunar Data Preparation to GIRO
VIS/NIR sub-group discussion
GOES-R Program Systems Engineering (PSE) Cal/Val Lead
Use of GSICS to Improve Operational Radiometric Calibration
GOES Calibration Event Log
GSICS Annual Meeting March 06, 2019 Frascati, Italy
goes-16/17 abi lunar calibration
T. Hewison, S. Wagner, A. Burini, O. Perez Navarro, M. Burla, F
T. Hewison, S. Wagner, A. Burini, O. Perez Navarro, M. Burla, F
Integration & Test Instrument Operations Coordination
Presentation transcript:

1 GOES-R Calibration Working Group (CWG) June 16, 2010 Presented By: Changyong Cao 1 NOAA/NESDIS/STAR CWG Progress Update

2 Outline  Cal/Val Plans and CWG collaborations  NIST progress  Cal/Val data management  Discrepancy resolution  Cal/val interfaces  Aircraft flight campaigns  Tool development  Summary

5D-3 GOES-R Program Cal/Val Documents Roles and responsibilities Baselined on Feb 7, 2011

GOES-R Cal/Val Collaborators 5D-4 Instrument and Ground Segments Vendors  All instruments Flight Project  All instruments Ground Project  All instruments NOAA/NESDIS/STAR  All instruments MIT Lincoln Laboratory  All instruments NIST  Optical Technology Division  ABI  Electron & Optical Physics Division (SUVI, EXIS) Marshall Space Flight Center/UAH  GLM  SUVI  NGDC/SWPC (Space weather instruments)  Field Campaign (NASA, NOAA, JPL, etc.) ABI, GLM, SUVI

5 Calibration Coordination Team (CCT) Formed Under New PSE Leadership AWG PSE & Program Science Flight GSP Instr. Vendor GS Vendor MOST DOST GOES-R Calibration Coordination Team Scope – A coordinating body to ensure efficient implementation of calibration activities throughout the GOES-R Program during all mission phases. GOES-R Calibration Coordination Team membership diagram CCT members - Representatives of any group with responsibility to ensure L1b Product integrity, e.g., PSE & Program Science (Cal/Val Working Group Reps) Flight (Deputy Project Manager, Instrument Managers) Ground (Deputy Project Manager) Vendors (Instrument and Ground) AWG MOST (MOM) DOST (DOM) Thanks to Mr. Ed Grigsby

Pre-Launch Resources - NIST 5D-6 NIST is a resource leveraged by PSE/Program Science (CWG) in order to provide: Review of vendor calibration plans and test setups Links to primary SI standards Development of plans for SI-traceable calibrations NIST is currently involved in the following activities: Deployment of the Traveling SIRCUS to the ABI Vendor testing facility Blackbody characterization using TXR Characterization of ABI vendor’s integration sp Validation of the ABI vendor’s FEL lamps Determining the SRF of ABI filters End-to-end calibrations of EXIS at SURF-III/Beamline 2 Review of the SUVI vendor NIST SURF-III Facility NIST SIRCUS COMPLETED

Major GOES-R Cal/Val-related Activities in Each Mission Phase 5D-7 Pre-Launch  Schedule determined by Flight and Vendors  Instrument and Test Design and Review  Instrument Testing and Test Verification  L1b Algorithm Development, Implementation and Review Post-Launch Testing (PLT)  Schedule determined by MOST and DOST  Science Test Design and Review  Science Tests Analysis and Verification  Cal Parameter Verification  Long-Term Monitoring Initialization  Performance Analysis/Anomaly Resolution  L1b Product Validation Mission Operational Lifetime  Schedule determined by Ops  Long-Term Monitoring  Vicarious Calibration  Cal Parameter Update  L1b Product Validation  Anomaly Resolution

Pre-Launch Design & Development Review Instrument/GS Vendor Flight Instrument Manager GOES-R Portal Flight / Instrument Vendor Interface Flight/CWG Review Development Plans, Procedures, Reports, Draft CDRLs, RFA Responses, Requested Items CDRLs, Reports Reviews, TIMs, and TRRs Reports, Presentations Feedback, Comments, RFAs CDRLs, Reports RFA Responses, Requested Items RFAs Feedback, Comments, Direction, RFAs Feedback, Comments, RFAs Participation

Pre-Launch Calibration Data Management Addresses RFA #6 Instrument Vendor Cal TestingCal Analysis Flight/Instrument Manager GOES-R Portal Flight / Instrument Vendor Interface Flight/CWG Validation Selected Cal Reports & Data for CDRLs Cal Test Data, Results & Reports Vendor Archive 2030 expiration All Instrument Test Data Cal Test Data Requests, Test Anomaly Notification Cal Test Data Requests, Test Anomaly Notification Cal Test Data, Test Anomaly Resolution Cal Test Data, Documentation, Results Cal Test Validation Reports Cal/Val Long-term Stewardship

CWG Discrepancy Reporting Process 5D-10 Instrument Data CWG Data analysis/ Document Review Discrepancy Identification Internal Review PSE/Flight/Ground Discrepancy Process Discrepancy Report Discrepancy Found Revision Requests (if applicable) Validation Record (No Discrepancy/Resolved) Currently 8 discrepancies identified and some are being addressed through flight

5D-11 Postlaunch Instrument Calibration Data Flow NOAA Satellite Operations Facility (NSOF) L1b Data, GRB CLASS GAS MM, PG, PD and DE CWG Instrument Radiometric and Spectral Calibration Data Quality Assurance for GOES-series R Post Launch Verification Long-term Monitoring Vicarious Calibration Deep-Dive Calibration Analysis Wallops Command and Data Acquisition System (WCDAS) Fairmount, WV (RBU) Instrument Calibration Data All Calibration Parameters and Algorithms used in L0→L1b processing Satellite Telemetry Instrument Housekeeping & Engineering data Instrument Calibration Data Via Terrestrial Data Link L0 Data L1Data, GRB Product Generation Operational Environment L0 & Input Data Ground Processing Algorithm L1b Calibrated Data Product Generation Development Environment L0 & Input Data Experimental Ground Processing Algorithm Experimental L1b Calibrated Data CLASS Updated Calibration Parameter Tables Cal L0 and Processing Data L1b, L2+ Products MLS and 2-Day Store

Anomaly Resolution L1b Product Performance Monitoring and Anomaly Resolution 5D-12 Instr. Telemetry 5-Day RDR CLASS Mission Mgmt: Instr. Temps, etc. H & S Monitor WCDAS/ NSOF WCDAS- WCDAS Cal Terminals CALVAL Workstation Gov’t Tools MLS 2-day MLS 2-day GAS NSOF Cal Terminals CLASS STAR Anomaly Resolution STAR LS STAR Workstations Automated Cal Data Acquisition GOES-R Integrated Cal/Val Instrument Performance Web Displays CALVAL Workstation Gov’t Tools STAR GOES-R Remote Access Firewall L0 GRB (L1b) TDL (CAL) L1b, L2+, CAL Remote Access Product Generation: Product Performance Monitor Mission Management: GRB Monitor Product Generation: GRB to L2+ Product Generation: Create L0, L0 to L1b processing and GRB generation. L0

GOES-R ABI Post-Launch Test - leveraging operational experience from heritage instruments Post-Launch Testing and Product Evaluation Cal/Val Mission PDR Aug 2011 GEO-LEO GEO-GEO KPP Product Quality Evaluation Working with the Imagery Team

Post-launch Cal/Val using Lunar Observations  for MTF, band to band registration, RVS, and stability evaluation  Heritage Mission Lifetime Calibration Stray light Analysis and VNIR Lunar Observations Stray Light Effect Analysis -Leveraging operational experience from heritage instruments Simulated ABI Lunar Images using Hyperion Hyperspectral Observations 3.9  m GOES-R ABI will scan around the exclusion zone: a sophisticated KOZ Exclusion zone does not eliminate all of the stray light contamination.

Long-term Performance Monitoring  Heritage Activity Sonoran Desert and White Sands Site Characterization  Heritage test site for GOES Imagers  Characterization of BRDF to remove seasonal signal variation for vicarious calibration. Mission Lifetime Calibration V&V Support and Instrument Performance Monitoring 5D-15 Cal/Val Mission PDR Aug 2011

GOES-R Instrument and L1b Product Analysis Tool Development Online/L0 Tools for All GOES-R Instruments Radiometric Calibration Tools Instrument Noise Monitoring/TrendingVNIR Lunar and Stellar Irradiance Trending/AnalysisABI Instrument Telemetry Monitoring/Trending GEO-GEO and GEO-LEO Inter-Comparison Trending/Analysis ABI, SUVI, EXIS Calibration Coefficients Monitoring/Trending Vicarious Calibration Target Radiance Trending/Analysis – (DCC, Desert Site, Instrumented Sites, Rayleigh Scattering, Sunglint) ABI, GLM Raw Data ReadersNWP Bias MonitoringABI, GLM L0 and L1b Product AssessmentAircraft Radiometer UnderflightsABI Spectral Calibration ToolsSpatial Calibration Tools SRF CorrectionABI, SUVI, EXISBand-to-Band RegistrationABI SRF AnalysisABI, SUVI, EXISMTF Analysis SUVI, ABI, GLM UnderflightABI, EXISLSF AnalysisABI CWG developing tools for:  Long-term instrument performance monitoring  L1b product radiometric, spatial and spectral calibration monitoring  Instrument and L1b product anomaly resolution Tools to be deployed during GOES-R post-launch tests and mission operational life.

Field Campaigns  Hardware Procurement for Cal/Val »Spectraoradiometer – ASD um with 10nm resolution »Sunphotometer »Infrared camera  Proposals  Thanks to Dr. Steve Goodman 17

Summary  Developed a comprehensive GOES-R Cal/Val program to ensure product quality  Cal/Val Strategy  Cal/Val Plan  Implementation and execution  GOES-R leveraging diverse complementary technical capabilities  Provide life cycle support for a successful GOES-R program  Realigned with the new PSE