FNAL TB09 Plots Alessandra Borgia Syracuse Unviersity Marina Artuso, Jianchun Wang, Ray Mountain January 20, 2010.

Slides:



Advertisements
Similar presentations
Collection Of Plots for A Testbeam Paper. List of Possible Plots R/Phi resolution, charge sharing, noise etc. Noise performance and few Landau distributions.
Advertisements

Ryan Badman, M. Artuso, J. Wang, Z. Xing July 7 th, 2010 TIMEPIX Characterization with test pulses with the Syracuse test stand.
Update on Analysis of FNAL TB09 Jianchun Wang for the group Syracuse Univesity Jan 29 th,2010.
LHCb VELO Testbeam at Fermilab Jianchun Wang Syracuse University.
Timepix Studies: Medipix Collaboration Summary and More Timewalk Plots Alessandra Borgia Marina Artuso Syracuse University Group Meeting – Thursday 20.
Standalone VeloPix Simulation Jianchun Wang 4/30/10.
VELO Beamtest Trigger VELO meeting 08/12/2005 Jianchun (JC) Wang Syracuse University.
TB analysis update Gwen & Alessandra VELO Group Meeting, Monday October 6 th first fits of the landaus header correction algorithms irradiated RD50: status.
Testbeam 2010 with CAPTAN System Jianchun Wang Syracuse University.
Status on Testbeam Analysis Jianchun Wang Syracuse University VELO meeting, August 28, 2007.
9/11/2007JC Wang1 Track Resolution Scale, assume equal  meas for different planes. HP3 HP4 All 6 measurements. Without leftmost one. Without rightmost.
Pixel Testbeam at Fermilab Jianchun Wang Syracuse University.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
L1 Trigger for ACDC Jianchun (JC) Wang Syracuse University VELO ACDC Software Meeting 01/20/2006.
VELO Testbeam 2006 Tracking and Triggering Jianchun (JC) Wang Syracuse University VELO Testbeam and Software Review 09/05/2005 List of tasks 1)L0 trigger.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
Jianchun Wang Marina Artuso Syracuse University 11/06/00 MC Simulation of Silicon Pixel Detector.
VELO ADC vs Charge Calibration Jianchun Wang April 16, 2008 This is an update to the presentation at April 11 st VELO Group Meeting. A new scan data of.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
FPIX0 Electronic Test Marina Artuso Paul Gelling Jianchun Wang  The system works fine with charge injection calibration  Gain curve, threshold, and noise.
Responsibility on Next Beam Test Jianchun Wang Syracuse University BTeV meeting 06/27/01.
Analysis work by: Marina Artuso Sheldon Stone Jianchun Wang CBX note available: /homes/cleo/sls/dompi.ps Study of B  D   Jianchun Wang 05/12/00.
Number of Comparators Marina Artuso Jianchun Wang 08/06/01.
Update on the RICH Beamtest The RICH Group M. Artuso, S. Blusk, C. Boulahouache, J. Butt, O. Dorjkhaidav, A. Kanan, N. Menaa, R. Mountain, H. Muramatsu,
Leroy Nicolas, HESS Calibration results, 28 th ICRC Tsukuba Japan, August Calibration results of the first two H·E·S·S· telescopes Nicolas Leroy.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
First Results from Cherwell, a CMOS sensor for Particle Physics By James Mylroie-Smith
SLHC Sensors at Meson Test Ryan Rivera ESE/CD, Fermilab All-Experimenter’s Meeting April 19, 2010.
Test-beam Results for the CMS Forward Pixel Detector Carsten Rott Daniela Bortoletto, Gino Bolla, Amitava Roy Purdue University 28 April 2001.
Chris Parkes for VELO software Group VELO Software Overview & Shutdown Planning Organisation Milestones 3 Critical Areas.
11 Wish list for July May testbeam Keep It (Stupidly) Simple..
Testbeam Studies of the LHCb Vertex Locator Modules Lisa Dwyer.
QGP France sept 2010Sanjoy Pal Performances of the tracking Chambers of the ALICE MUON Spectrometer 1.
Diamond detectors for the LHCb upgrade M. Artuso, A. Borgia, J. Garofoli, R.Mountain, P.Urquijo, J. Wang, Z. Xing 5/5/20101Marina Artuso Velo Upgrade Meeting.
First tests of CHERWELL, a Monolithic Active Pixel Sensor. A CMOS Image Sensor (CIS) using 180 nm technology James Mylroie-Smith Queen Mary, University.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
Fermilab Test Beam analysis for CMS GE1/1-III GEM detector Aiwu Zhang, V. Bhopatkar, M. Hohlmann, A.M. Phipps, J. Twigger Florida Institute of Technology.
Forward Pixel Beamtest Analysis Carsten Rott Purdue University Januar 24, 2001.
 The zigzag readout board is divided into eight η-sectors; each sector has a length of ~12 cm and comprises 128 zigzag strips; zigzag strips run in radial.
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
FNAL Beam test results A. Zhang, V. Bhopatkar, M. Phipps, J. Twigger, M. Hohlmann HEP Group A, Florida Tech 2013/11/18.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
GE1/1-III GEM Cluster Size and Resolution Studies with the FNAL Beam Test Data Aiwu Zhang, Vallary Bhopatkar, Marcus Hohlmann Florida Institute of Technology.
Construction and beam test analysis of GE1/1 prototype III gaseous electron multiplier (GEM) detector V. BHOPATKAR, E. HANSEN, M. HOHLMANN, M. PHIPPS,
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 CPC2-CPR2 Assemblies Testing Status Charge Amplifiers –Attempts to make them work Best voltage single channel 2MHz Cluster finding first.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Irradiated 3D sensor testbeam results Alex Krzywda On behalf of CMS 3D collaboration Purdue University March 15, 2012.
FNAL beam test data analysis A Hands-on session at CMS Upgrade School Aiwu Zhang Florida Institute of Technology On behalf of the CMS GEM collaboration.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
CdTe prototype detector testing Anja Schubert The University of Melbourne 9 May 2011 Updates.
Ssd simulation status : preparation for embedding Jonathan Bouchet Svt Meeting : 09/19.
Sensitivity of HO to Muons Shashi Dugad for HO group India-CMS Meeting 6-7 Oct
BTeV Beam Test Results Jianchun Wang Syracuse University Representing J.A. Appel, J.N. Butler, G. Cardoso, H. Cheung, G. Chiodini, D.C. Christian, E.E.
Annealing effects in irradiated HPK strip detectors measured with SCT128 chip Igor Mandić 1, Vladimir Cindro 1, Andrej Gorišek 1,Gregor Kramberger 1, Marko.
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
May 2016 Testbeam LHCb Upstream Tracker S. Blusk, Syracuse University On behalf of the UT group With tremendous appreciation to the SPS crew, especially.
Analysis of LumiCal data from the 2010 testbeam
*Institute of Space Science
TT Upgrade Power Review
BTeV Pixel Silicon Detector
Test Beam Measurements october – november, 2016
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Beam Test Results for the CMS Forward Pixel Detector
3E7_05151 wafer 11 IV curve Noise ~122e Source scans bad and
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
Presentation transcript:

FNAL TB09 Plots Alessandra Borgia Syracuse Unviersity Marina Artuso, Jianchun Wang, Ray Mountain January 20, 2010

Plots that are Ready as of Today All are complete for both sensors, n- and p-type. Ped and CMS Noise – There are many! – Signal vs channel – Gaussian fits per each sector Test Pulse – MPV vs link MPV vs Y Position (mm) for 500 V Cluster sizes for HV Scan when P type is High Irr Efficiencies for HV Scan when P type is High Irr 2010 January 202 Alessandra Borgia, Syracuse University Velo Meeting

Plots Not Ready yet MPV vs Y Position (mm) for other voltages ADC vs Voltage projection, slice of MPV vs Y Position at high irr. Cluster sizes for HV Scan when N type is High Irr Efficiencies for HV Scan when N type is High Irr All are in process January 203 Alessandra Borgia, Syracuse University Velo Meeting

Noise Plots ADCs Channel ADCs Channel Signal + JC Effect Signal N Type – 500V – Pedestal N Type – 500V – CMS 2010 January 204 Alessandra Borgia, Syracuse University Velo Meeting

Noise N Type – 500V – CMS N Type – 500V – Ped File Name: RR_0deg_Top_latency_0x17_delay _40ns_Kazu_HV mdf Conditions: Beam at Top N type – Low Irr P type – High Irr What these plot represent: Plots of the means of Gaussian noise fits for each strip in a sector. i.e. sum of noise in a sector 2010 January 205 Alessandra Borgia, Syracuse University Velo Meeting

Noise P Type – 500V – CMS P Type – 500V – Ped File Name: RR_0deg_Top_latency_0x17_delay _40ns_Kazu_HV mdf Conditions: Beam at Top N type – Low Irr P type – High Irr Dead chip on p-type will be removed 2010 January 206 Alessandra Borgia, Syracuse University Velo Meeting

Test Pulse N Type: Channels 9 and 30 due to timing shift **Means obtained the same way as the noise, only I pick out the channel that has the signal on it, which I know before hand; plot mean per link. 2 channels are pulsed per link, so 128 channels hit January 207 Alessandra Borgia, Syracuse University Velo Meeting

Test Pulse P Type: Channels 3 and 24 The ADC value should by consistent for each link January 208 Alessandra Borgia, Syracuse University Velo Meeting

N Type Charge Collection 2010 January 209 Alessandra Borgia, Syracuse University Velo Meeting

N Type with fluence superimposed 2010 January 2010 Alessandra Borgia, Syracuse University Velo Meeting

P Type Charge Collection 2010 January 2011 Alessandra Borgia, Syracuse University Velo Meeting

P Type with fluence superimposed 2010 January 2012 Alessandra Borgia, Syracuse University Velo Meeting

ADC vs Voltage projection JC’s ppt from last week’s SU Velo mtg Just from eyeballing, this is the shape: **NB** Of course, will do it properly….wanted to see the shape January 2013 Alessandra Borgia, Syracuse University Velo Meeting

Cluster Size where P type is High Irr at 500V N Type 500VP Type 500V 2010 January 2014 Alessandra Borgia, Syracuse University Velo Meeting File Name: RR_0deg_Top_latency_0x17_delay_40n s_Kazu_HV mdf Conditions: Beam at Top N type – Low Irr P type – High Irr

Cluster Size where P type is High Irr 50V N Type 50VP Type 50V 2010 January 2015 Alessandra Borgia, Syracuse University Velo Meeting File Name: RR_0deg_Top_latency_0x17_delay_40n s_Kazu_HV mdf Conditions: Beam at Top N type – Low Irr P type – High Irr

Efficiencies Efficiencies considered when: 1 track from pixel telescope is within ± 100um of cluster position on sensor 2010 January 2016 Alessandra Borgia, Syracuse University Velo Meeting