Anode Front-End Electronics current status Presented by Nikolay Bondar. Fermilab. 09/08/00.

Slides:



Advertisements
Similar presentations
RAD Engineering BLM VME J2 Backplane Printed Circuit Board Backplane Crosstalk Comparison January 25, 2005.
Advertisements

The MAD chip: 4 channel preamplifier + discriminator.
E. Atkin, E. Malankin, V. Shumikhin NRNU MEPhI, Moscow 1.
Specific requirements for analog electronics of a high counting rate TRD Vasile Catanescu NIHAM - Bucharest CBM 10th Collaboration Meeting Sept 25 – 28,
GEMMA (GEM Mixed-signal Asic): Design & Developing Second Year Ph.D. Activity Report Alessandro PEZZOTTA 26 September 2013 Tutor: Prof. A. Baschirotto.
ELK 06/21/00 Desktop Interface EngineeringATA/100 Eric Kvamme Quantum Corporation Manager, Desktop Interface Engineering (408)
Power supply cable Charge injection 3 channels readout (external cables to the scope) 3 channels readout (internal cables) Set up for reading two cards.
MDT-ASD PRR C. Posch30-Aug-02 1 Specifications, Design and Performance   Specifications Functional Analog   Architecture Analog channel Programmable.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
1 ME 234/2 HV noise investigation N.Bondar CMU. 12/18/02.
August SGSS front end, Summary August 2008 Edwin Spencer, SCIPP1 SGST Preview SCIPP, UC Santa Cruz Andrey Martchovsky Gregory Horn Edwin Spencer.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
A.Kashchuk Muon meeting, CERN Presented by A.Kashchuk.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
16 – 17 Jul 02Andrew Werner TRD Monitor Tube Readout Electronics: Shaping Peter Fisher, Bernard Wadsworth, Andrew Werner MIT 1.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Preliminary LumiCAL FEE Specification Presented by Alexander Solin NC PHEP FCAL collaboration meeting, February 12-13, 2006, Krakow (INP PAS),
1 E906 Pre-Amplifier Card 2009/10/07. 2 E906 Wire Chambers Station1 MWPC: –build a new E906 MWPC. –4500 channels in total. Station2 DC: –recycle old E866.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
QIE10 Issues Tom Zimmerman Fermilab Oct. 28,
B.Satyanarayana, TIFR, Mumbai. Architecture of front-end ASIC INO Collaboration Meeting VECC, Kolkata July 11-13, Amp_out 8:1 Analog Multiplexer.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Progress on STS CSA chip development E. Atkin Department of Electronics, MEPhI A.Voronin SINP, MSU.
Peter, Wieczorek - EE Low Noise Charge Sensitive Preamplifier Development for the PANDA Calorimeter Design and Measurements of the APFEL - Chip.
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
1 G.Pessina, RICH Elec Upg, 11 April 2010 Analog Channels per chip4 to 8 Digital channel per chip4 to 8 Wire-bond pitch (input channels) Input capacitance.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
Trip-t testing progress report
SIAM M. Despeisse / 29 th January Toward a Gigatracker Front-end - Performance of the NINO LCO and HCO Matthieu Despeisse F. Osmic, S. Tiuraniemi,
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Fermilab Silicon Strip Readout Chip for BTEV
NA62 straw readout Characterization and qualification of the frontend electronics Detector and interface to frontend Small readout system Plans Expected.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
TPC electronics Status, Plans, Needs Marcus Larwill April
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Click to edit Master subtitle style Presented By Mythreyi Nethi HINP16C.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Terra-Pixel APS for CALICE Progress meeting 10 th Nov 2005 Jamie Crooks, Microelectronics/RAL.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
1 Chapter No. 17 Radiation Detection and Measurements, Glenn T. Knoll, Third edition (2000), John Willey. Measurement of Timing Properties.
05/12/2014 Gerrit Jan Focker, BE/BI/PM 1 PSB-Injection H - and H 0 Dump detectors and Stripping Foil current measurement.
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
KLOE II Inner Tracker FEE
Calorimeter Mu2e Development electronics Front-end Review
ECAL Front-end development
Status of n-XYTER read-out chain at GSI
University of California Los Angeles
BESIII EMC electronics
RPC Front End Electronics
RPC Electronics Overall system diagram Current status At detector
PHENIX forward trigger review
Presentation transcript:

Anode Front-End Electronics current status Presented by Nikolay Bondar. Fermilab. 09/08/00

Anode Amplifier Discriminator chip (CMP16_F) specification Used technology-AMI 1.5u BiCMOS Amplifier input pF pF Shaper peaking time30 ns40 ns Shaped waveform Semi-gaussian with two exponent tail cancellation Transfer function (gain)5 mV/fC9 mV/fC Two threshold discriminator High threshold used as ENABLE. Low threshold zero-crossing discriminator driven by a constant fraction shaped pulse High level thresholdAdjustable mVAdjustable fC Output pulse width-Input pulse over the threshold ~ 80 ns (average) Discriminator slewing time<3 ns <3 ns Initial delay-100 ns Dead time-350 ns Minimum stable threshold-5 fC (on bench) Threshold temperature variation--0.5fC/degree C (preliminary) Delay temperature variation-0.2 ns/degree C (preliminary) Operational voltage V Power consumption200 mW/channel35 mW/ch PackageQFP 80 - (Plastic Quad Flat Pack) 14 mm x 20 mm, 80 pins, 0.8 mm pin pitch Specified for design Implemented in ACD16_F

Anode Amplifier Discriminator chip (CMP16_F) current status CMP16_F chip received in April chips was received in that time and 160 chips more in May. Total chips. First 90 chips was assembled on AD16 boards and carefully tested with the Test Stand. All results are placed on CMU web pages. Statistic: -initially broken chips - 2 out of 90 -most of chips match specification -the chip parameters are pretty consistent Resume u rules more stable and reliable than previous 1.2 u. These chips used for: - supplied 3 FAST sites with AD16 boards Rad. test broken during test on chamber spare - 2 Additional 160 chips - assembled on AD16 board. Just received from company, not tested yet. 100 chips - for steady state test 60 chips spare.

CMP16_F chip problem CMS16 Chip corresponds to the initial specification. Only one problem - after switching to the new design rules (1.5u) the chip became slower the output pulse waveform overshooting increased from 5% up to 30%. Dead time increased from 180ns to 350ns. The reason of this changes - increased parasitic capacitance (factor 2) That is an easy correctable problem. According simulation there is possibility to go back to initial waveform.

Anode Front-End Board (AFEB) AD-16 specification Board dimension 2.8’ x 3.075” x 0.625” Input connector strip socket, two rows, 34 contacts Inputs DC isolated Input signalNegative current pulse min. detectable charge5 fC max. detectable charge1000 fC max. allowed charge10 uC Output connector 40-pin header with polarized key Outputs current source LVDS compatible (1.5 mA) Threshold control voltage V 0 V- corresponds to maximum threshold Input test pulse: negative, 0 to -2 V 20 ns rise time > 2 us pulse width 0.25 fC/mV transfer function 110 Ohm termination Power supply voltage +5.5 V +6.0 V maximum Current 0.09 Power consumption 495 mW total 31 mW per channel Remote power switch TTL level high -on / low -off

Anode Front-End Board integration issues AD16 is designed for direct connection to a protection board on the chamber. The board sticks out of the side of chamber via a slot in the CSC side panel. A special bracket is attached to the panel next to the slot to fix the board and provide additional grounding between the board and the chamber. All AD16 boards on the chamber will be covered by an aluminum cover for additional shielding and mechanical protection. All mechanical drawings are made by Vladislav Razmyslovich. The AFEB - ALCT cables (halogen free) are grouped into sets of different lengths to accommodate the different distances between sets of AD16 boards (3 boards per column) and the ALCT. They have strain relief on both ends. Each type of CSC has its own cable layout and individual cable sets. First issue of drawings for the cable assembly is ready thanks of TD help. Galogen free cable have been received. First samples of new cables are ready.

CMP16_F chip and AD16 board reliability test. (Proposal) Problem to solve: -estimate burn-in test time duration (Mil. Spec °C) -estimate long term reliability for AD16 board (Mil. Spec Test performance and setup: 100 AD16 boards powered and pulsed and placed in an oven under 100°C for long term running (?) hours. Test procedure: Weekly the board must be taken out and tested. A regression curve will be plotted. Test will be finished when we get 50% of dead channels. Equipment: Heavy duty oven Power supply +5.5V 10A Pulse generator

Delay chip DEL16 specification Used technologyAMI 0.5u CMOS Input signal level LVDS standard Output signal 3.3 V CMOS Output pulse width 40 ns (adjustable with an external current) Delay minimum 20 ns Delay step  T 2 ns (adjustable with an external current) Number of delay steps N 15 maximum Delay function 20 ns+N*  T Delay nonlinearity  T/2 Delay control interface serial Control interface signal specifications: CLRB Set delay to zero ChSB Select chip to download delay data. Data is fixed inside the chip at the end of the ChSB pulse. CLC Clock pulses D_IN Input data D_OUT Output data pattern Power supply voltage 3.3 V Chip packageQFP x 10 (Plastic Quad Flat Pack) 10 mm x10 mm, 64 pins, 0.5 mm pin pitch