P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)

Slides:



Advertisements
Similar presentations
The Business Analyst and the SDLC
Advertisements

Team Uno 11/11/04 Bunker Curnes Product Assembly.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review March 20, 2008.
Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
QBASE Engineering © QBASE Engineering Sdn Bhd QBASE Engineering QBASE Engineering Overview This training is designed to build-up the participant’s knowledge.
Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
P10511: Miniaturization of Xerography
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
Rational Unified Process
MSD-I Project Review Modular Motion Tracking Sensors 1.
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
EDGE™ A P D C Copyright © 2004 Dr. Edward Hensel P.E. and P.H. Stiebitz. All rights reserved. Technical Data Package & Team Notebook …what is it anyway?
Preliminary Design Review EE 296 – Micromouse Spring 2007.
Team Xerox Progress Report Mechanical Engineering Design Team Mechanical Engineering Design Team Jeff Carpenter Charlie Morris David Postel Jeremy Ryatt.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2006 R I T Design Reviews Objectives of the Design Review Participants for a successful.
The objective of this project was to design a dynamic similarity test rig to replicate the operating conditions of the main crank bearing in the Dresser-Rand.
P13621: Conductive Heat Transfer Lab Equipment MSD II: Final Project Review 10 May, 2013 RIT KGCOE.
Component 1 – Content Knowledge You may sit in common Certificate Areas.
Applying the Inspection Process. What Software Artifacts Are Candidates for Inspection? Software Requirements Software Designs Code Test Plans.
NIST Special Publication Revision 1
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Assessment – Practices and Strategies. Where is what I need? Find your Standards. Find your prompt descriptors.(Assessment at a glance) Find your scoring.
The Instructional Decision-Making Process 1 hour presentation.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Detailed Design & Component Selection. Detailed Design Phase Portion of the engineering design process where the engineering team can completely describe.
Assessment – Practices and Strategies. Our Mission.
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
Request for Proposal (RFP)
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
CLIC Permanent Magnet Quadrupole Engineering Development of second family member Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 07/11/2012.
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
The Journey to a West Coast Drivetrain
P16680: AATech Universal Oil and Bag System Subsystem Design Review 10/20/15.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
January 16, 2009Senior Design I - System Level Design Review System Level Design Review Senior Design I Low Energy Printing Project P09505.
Layout Drawings Presentation ME 4182 Team: 5 Guys Engineering + 1 Nathan Bessette, Rahul Bhatia, Andrew Cass, Zeeshan Saiyed, Glen Stewart YJ Chok.
Complete Design & Gate Review. Complete Design Detailed Design Review (DDR) 1.“High and medium technical risk” areas –Design Review (Prelim-DDR): standard.
What has been accomplished at the end of MSD 1 & 2?
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Introduction to Software Engineering 1. Software Engineering Failures – Complexity – Change 2. What is Software Engineering? – Using engineering approaches.
P15342 Linear RF Measurement System Kate Gunderson Matt Chauncey Will Tourtillotte.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Lifting with Equipment During assembly operations it may be necessary to lift or move heavy equipment. The equipment used to achieve this is covered by.
First-Year Engineering Program Preliminary Design Review (PDR) Definition PDR Objectives PDR Material Project Management Review.
Community Infrastructure Levy Project Planning and Infrastructure Evidence July 2014.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
LESSON 5 Introduction to Materials Requirements Planning (MRP)
Project life span.
Where is what I need? Find your Standards.
P17082 Biomechanical Elbow Model Detailed Design
P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016
P17082 Biomechanical Elbow Model Build and Test Prep
Final Project Review -Senior Design 2
P Nano-ink Deposition System Detail Design Review
P09045: Membrane Characteristic Test Stand
Detailed Design Review (Phase 4)
Detailed Design Presentation
Preliminary Detailed Design Review: P18001
Presentation transcript:

P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)

Customer Requirements Pareto

Engineering Metrics Pareto

Risk Assessment Pareto Link to Risk Assessment Table rev2

EE Wiring Schematic

Detailed Design Iso

Almost all parts are the same thickness for feasibility of manufacture (10mm). Vertical components will be mounted onto an aluminum jig plate. Vertical components will be supported with L- brackets or gussets.

Detailed Design Charger

Interference with charger or charger mount components with photoreceptor end caps. Charger wires binding with mount components when sliding for alignment. Sliding placement with gapping blocks.

Detailed Design Motor

Moment created from heavy photoreceptor motor. Interference from photoreceptor motor cradle with smaller ESV motor underneath. Collars for photoreceptor motor to shaft and ESV motor to lead screw.

Detailed Design Photoreceptor

Spring selection for correct compression to eliminate slippage. Bearing selection Angle of V-flanges on endcaps. Notch in shaft, notch in endcap, key insert for driven side.

Detailed Design Erase

Thin metal bar to support erase light. Bend for no interference with endcaps. Notches for discrete placement (~1 inch gap).

Detailed Design ESV

Bearing selection. ESV mount guide design (delrin or aluminum?). Lead screw, re-use current part.

BOM EE BOM presented at systems design review ME BOM – Jig plate – L-Brackets – 10mm thick steel – Bearings – Motor coupler – Delrin/aluminum – Graphite brush

LabVIEW State Diagram

Deliverable (weight) Score in Week (#) Max. Score Score*Excellent/Very GoodGood/AcceptableBarely acceptableUnacceptable Comments, Target, Date Completed Bill of Materials(9)3 BOM is complete, and long lead time items and vendors have been identified. (3 points) BOM is partly complete - some specifics still remain to be defined. (1-2 points) BOM is imcomplete, most items not specified. (0 points) Detailed Design Drawings/Schematics(9)5 All drawings for parts to be manufactured are complete, assembly drawings demonstrate that system assembly is feasible. (5 points) Most drawings or schematics are complete, assembly drawings are nearly done. (3-4 points) Some drawings are complete, others are not done or require modification. (1-2 points) Few, if any, drawings or schematics exist beyond hand sketches or concept drawings. (0 points) Feasibility Analysis(9)7 Significant analysis has been done to demonstrate feasibility of all systems/components. Appropriate links to the risk assessment activity are complete. (6-7 points) Most design features have convincing support, some require further work. Link to risk assessment partly complete. (4-5 points) Many design features require further analysis to demonstrate feasibility. (2-3 points) Little analysis has been done to demonstrate feasibility. (0 points) Risk Assessment and actions to minimize risks - Detailed Design phase (9)3 As detailed design phase has progressed, the initial list of risks has been reviewed and updated. Actions that could be taken to minimize risks have been taken and documented. (3 points) Plans are in-place for to monitor and take action on most of the key risks the plans and analyses are missing some key elements. (1-2 points) Plans are not in place to reassess and minimize the impacts of risk. (0 points) Knowledge & understanding of design (9)7 Thorough and in-depth understanding is evident of the design (system & relevant subsystems) and rationale for design decisions and tradeoffs. (6-7 points) Good understanding is evident of the design and rationale for most design decisions and tradeoffs. (4-5 points) General comprehension of the design is evident but rationale for decisions is not solid and tradeoffs are not well understood. (2-3 points) Superficial understanding of the design is evident at either the system or subsystem level. Rationale for specific design decisions and tradeoffs is poorly understood, if at all. (0 points) Detailed Design Plan to meet Customer Needs/Engineering Specifications including a Preliminary Test Plan (9)7 Sufficient evidence is presented to demonstrate that customer needs and design specs will be met. This includes development and documentation of a preliminary test plan using the suggested format (6-7 points) Team demonstrated that most customer needs and design specs will be met. Test plan has been developed but could be more specific (4-5 points) Team demonstrated that some needs and specs will be met, but others require significant further analysis. (2-3 points) Many questions remain as to whether needs and specs will be met. There is no test plan (0 points) Detailed Design Review execution(9)5 Design Review was very well planned and executed with appropriate attendees. All subsystems discussed, key issues addressed, notes and action items documented. (5 points) Design Review execution was acceptable but was weak in one or more areas: breadth of participants, preparation, thoroughness, or documentation. (1-4 points) Design Review was not held or was poorly executed: key subsystems were not reviewed, key issues were not addressed, little/no preparation or documentation. (0 points) Detailed Design Review represents 37% of your MSD 1 Grade 37 X X X X X X X

Action Items = Busy Week Obtain wireless PCI card from John Wellin. Make computer functional for LabVIEW code. Further follow-up with Rob Kraynik on concept feasibility. Finish CAD parts: ESV guide, PR shaft key, motor shaft collars. Create part drawings. Create ME Bill of Materials. Further review Risk Assessment.

Questions?