Josiah Dobson Brett Nicholson Travis Befus Team 11.

Slides:



Advertisements
Similar presentations
Intel Water Reclaim Project Final Report 5/25/05.
Advertisements

Project Management Because a few hours spent now will save weeks of frustration later Jon Patrick Student Director.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
The Design Process. What is Design? What is a Design Process? Design Process Example.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Rainwater Conservation System Town of Cary Senior Center Facility.
ISLA POPA II, PANAMA WATER SUPPLY PROJECT July 10 th 2014.
For the City of Kendrick Thursday, July 30 th,
1 Hillel House Rain Garden 4/20/09 Matt Leon – Senior, OLS (Project Leader) Rachel Machbitz – Freshman, Engineering (Project Liaison) Emily Pohlman - Senior,
Review Questions List and describe the purpose of the four phases of Systems Analysis. The preliminary investigation phase quickly determines whether or.
OFF THE GRID Property Irrigation System Alex Chepeska Alex Chepeska.
PLANNING FOR SUSTAINABLE COMMUNITY-BASED ECOTOURISM IN UAXACTÚN, GUATEMALA Advisors: Joan Nassauer Ivette Perfecto Group members: Marina Alvarez Lorcan.
Thailand Water Supply System Project By: Stephen Bonk (Team Leader) Kevin Dischino Joseph Moore.
Carbon emission decrease by solar water heating MENARID Knowledge Exchange workshop 24th to 28th of March, Hammamet, Tunisia H. Jazi National Project Manager.
Sharif University of Technology Session # 4.  Contents  Systems Analysis and Design Sharif University of Technology MIS (Management Information System),
Aquaponics Proposal Group Members:
Design Process Overview
Kongiganak Wind Farm Picture by Puvurnaq Power Company Josh Craft Assistant Wind Program Manager Alaska Energy Authority (907)
P14119 Rochester Roots Adaptable High Tunnel Abstract Rochester Roots, a non-profit in Rochester, NY, uses urban agriculture as a tool for social and educational.
Engineers Without Borders-USA 2008 International Conference.
Water distribution network optimization by non-technical workers the application of decision support systems to analyzing peace corps data case study of.
Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System.
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
1 ENCO Utility Services How Could a Boulder Municipal Utility Run Its Electric Distribution System? June 1, 2011 Boulder, Colorado
Safe Drinking Water Permit and Capacity Requirements Developer Services Summit November 16, 2010 Engineering - Asset Planning Vince Monaco.
Engineers Without Borders-USA 2009 Midwest Workshop.
ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005.
LCWDBoardMtg_ pptx/1 LCWD Board Meeting January 14, Carneros Avenue, Napa Los Carneros Water District.
AB Ellis Public School and Espanola High School Revitalization.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Energy Group Kilowatt Hour Meter Date: 11/14/2011 Project Update Team Leader: Kevin Manieri Team Advisors: Dr. Fish + Tom Austin Students: Dave Allen,
November 30, Pull in …supplement. Revisit Supply and Demand, focus on: 1) Energy Resource 2) Delivery System Sizing & Design PVWatts (Solar Resource)
Heritage Lottery Fund Planning your heritage project & our small grants programmes.
Design Process Overview. What is Design? The word “design” is often used as a generic term that refers to anything that was made by a conscious human.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Engineers Without Borders-USA Mid-Atlantic Professionals Chapter Water for Life Project Apatut, La Union, Philippines Amanda Jacobs Project Lead.
Nikolaus Sires ET-493 Advisor: Dr. Rana Mitra. Problem 1 The site of this senior project is a pond of approximately three acres. I desire to remove one.
Practice Problems Constrained Optimization. Two Goods You have budgeted $500 for the Christmas vacation to buy presents and gasoline for travel. In your.
Design Process Overview. What is Design? The word “design” is often used as a generic term that refers to anything that was made by a conscious human.
Food Preservation Challenge The Science Behind Food Preservation Unit.
Josiah Dobson Brett Nicholson Travis Befus Team 11.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Brenda Bateman, Senior Policy Coordinator House Interim Committee on Energy & the Environment Oregon Water Supply & Conservation Initiative Update December.
® Forging new generations of engineers. Design Process Review.
OCIO Site Licensing CIO Advisory Community Aug. 19, 2010.
Pump Station Considerations for a Simple Duplex Station Discharging into a Combined Regional Force Main Rachel Rausch, EIT.
SATMathVideos.Net Water is pumped into an tank at 20 gallons per minute. The tank has a length of 10 feet and a width of 5 feet. If the tank starts empty,
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Design Process Overview. A design process is a systematic problem-solving strategy, with criteria and constraints, used to develop many possible solutions.
Solar Evaluation Committee Report to the Master Planning Committee 9 December 2015.
CMU Study Abroad-2014 A team of 6 CMU students and our professor Dr. Omar Keith Helferich and wife Patricia traveled to La Romana in the Dominican Republic.
Tube well pump using wind power Nishan Madushanka HND/CV/03/12.
.  1.Leaderships in energy and environmental design (LEED). 2.Khalifa tower Environment friendly. 3.Elevators of Khalifa tower. 4.Evacuation and fire.
Humans can Take Action Educational Resources from the CLEAN Collection.
Maria Steblay, MaKinnah Collins, Ryan DeGroot, Caleb Ingram
PROPOSED EWB BOSTON PROFESSIONALS PROGRAM IN TANZANIA
The Engineering Design Process
By: Addison Duhon, Alex Lehocky, Elliot VanLandingham
Small Radio Controlled Dredge
Design Process Overview
Detailed Design Review Solar Thermal Water Heater
Design Process Overview
Dr. Mwangi Engineering and Technology
Design Process Overview
Design Process Overview
Alabama Industrial Assessment Center
Welcome, everyone! Thanks for being here today to learn more about the upcoming Model Water Tower Competition. We will give you an overview and then.
Design Process Overview
Detailed Design Review Solar Thermal Water Heater
Presentation transcript:

Josiah Dobson Brett Nicholson Travis Befus Team 11

 Project Overview  Preliminary Designs  Design Norms  Major Decisions Made  Major Obstacles  Travel to Ecuador  Feasibility  Future of Project

 Working with HCJB to design a water tower and distribution system for two villages: Iniayua and Washintsa  Iniayua- 25 home community -Currently has a distribution system, but requires a new tower and reservoir -Minimum tower height is 20ft -Minimum capacity of 5000L  Washintsa-15 home community -Requires a tower, pump, and complete distribution system -Minimum capacity of 3000L

 Pumping Design Four 80 watt solar panels in Iniayua Modeled around a four hour peak sunlight (10.6 gpm)

 Distribution System Iniayua = 10,000 Liters Washintsa = 6,000 Liters

Tank Demand in Sync with pumpDemand out of Sync with Pump Pumping system on full efficiency falls 317 gallons short of Daily Demand Solution: Water conservation

 Stewardship -Use only materials local to Ecuador -Efficient use of all resources  Transparency -Maintain open communication with our client, HCJB -Make sure the communities we are serving are aware of developments

 Tower and Reservoir Designs -Max 6ft long members -Steel and wood designs -collapsible tank

Decided on the two communities we will be focusing on Narrowed materials down to steel or wood Using the Grundfos 2.5 SQF solar powered pump

 Raised the majority of our funding through the Innotec grant  Purchased plane tickets  Preliminary Models in StaadPro

 Communication  Planning the trip -Tools/Equipment to take  Site Data  Material Data Types of wood Costs of Materials

 Team has purchased tickets for January  Fly to Quito and travel by bus to Shell -Meet with the HCJB engineers  Travel by small plane to Washintsa and Iniayua to meet with the client and collect data -topographic -soil testing -layout of the village -Analyze local materials -Analyze water usage and pump operations

 Estimated costs are within budget  HCJB is budgeting for the project  Opportunity to travel to Ecuador allows us to gather data  Preliminary designs show that requirements and constraints can be met

 Prototype of Tower and System for Senior Design Night  Tower structure design and construction drawings for HCJB  Distribution system designs for Washintsa  Designs and recommendations to reduce pump failures