Target Paper Status Summary 21 st December 2010 Chris Booth 1.

Slides:



Advertisements
Similar presentations
1 MICE Target Status Chris Booth 3 rd March 2004.
Advertisements

MICE Target Status Chris Booth 30 th March Chris BoothUniversity of Sheffield 2 The challenge ISIS beam shrinks from 73 mm to 55 mm radius during.
EPerformance Module 1 - Chapter 1. Completing your self-appraisal There are three steps to completing your performance appraisal: 1.Completing the self-appraisal.
Target Status Report Lara Howlett University of Sheffield.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
MICE Target Development Chris Booth Sheffield 8 th June 2006.
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
Target Paper Status Summary 13 th December 2011 Chris Booth 1.
Jim Haywood - Product Manager for Statutory Returns School Census Summer 2015 Overview Keywords: CENSUS CENSUS15.
MICE Target Schedule Chris Booth Sheffield 12 th June 2006.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Inspection of T2#2 documented in MICE Note 272 Some issue with Notes site … couldn’t.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
MICE Target Review Chris Booth Sheffield 12 th June 2006.
Target: K. Long, 21Dec2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel delivery.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Delay in material delivery: » Torlon delivery expected.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel and.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
INTRODUCTION.
SLO Workshop #2. Overview Objectives for today: You will be able to..  Recognize well written components of an SLO  Practice the process of analyzing.
Main progress on Design & Safety Review: EmCAL -- Received the revised TRD write up from Ludovico Design & Safety Audit sheets need to be revised to correspond.
DC Motor Control Project Group A ALEXANDER M FUNK LAM D NGUYEN JAKEISHA D THOMPSON PAULETTE J VERNON ERIC G ZAISER 12/03/01.
Target Report Introduction Chris Booth Sheffield 20 th November 2008.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
MICE Target – Design Update and Test Plans Chris Booth Sheffield 22 nd October 2005.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
STEPPER MOTORS Name: Mr.R.Anandaraj Designation: Associate. Professor Department: Electrical and Electronics Engineering Subject code :EC 6252 Year: II.
Sensorless Control of the Permanent Magnet Synchronous Motor Using Neural Networks 1,2Department of Electrical and Electronic Engineering, Fırat University.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
What do I have to do? Cause a motor to turn the center arm. attach motor to frame can redesign the center arm piece as needed use bushings or bearings.
Geant4 Orsay Workshop K.Amako 1 Geant4 User’s Documents Geant4 Orsay Workshop 18 October, 2000 Katsuya Amako (KEK/CERN)
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
McTronX: Proudly South African magnetic bearing solutions G van Schoor.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
1 EPA’s QA Protocol/Handbook Optical Remote Sensing Dennis K. Mikel EPA-Office of Air Quality, Planning and Standards.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Professor : Ming – Shyan Wang Department of Electrical Engineering Southern Taiwan University Thesis progress report Sensorless Operation of PMSM Using.
Editing Status of Accelerator Systems R&D, CesrTA, ATF2 as of Sep.10 K. Yokoya.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Positioning Sensor for Electric Motor Drive ENGR 498 Senior Design College of Optical Sciences Industrial Affiliates.
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
NuMI Detector NIM Paper Draft MINOS Detectors NIM Paper Status and Job List for this Meeting Dave Ayres & Alec Habig Argonne & Minnesota – Duluth MINOS.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
SysML Modelica Integration Working Group Report (SE DSIG Meeting, San Antonio, TX, 9/15/2009) Chris Paredis Georgia Tech 1.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
The Target Drive For The MICE Experiment Control and Infrastructure Optical Readout and Drive Electronics Target Drive A linear electromagnetic drive has.
Target Installation Plan
Engineering Technology Division
Sample Text for Poster Title
Sample Text for Title of Poster
LIU Wire Scanner Milestones June 2017
Sample Text for Poster Title
Sample Text for Poster Title
Sample Text for Poster Title
Sample Text for Poster Title
Sample Text for Poster Title
Sample Text for Title of Poster
Sample Text for Poster Title
Sample Text for Poster Title
Sample Text for Poster Title
Sample Text for Poster Title
Sample Text for Poster Title
Sample Text for Poster Title
Sample Text for Poster Title
Dynamical Operation, Vector Control, DTC and Encoder-less Operation
Presentation transcript:

Target Paper Status Summary 21 st December 2010 Chris Booth 1

1 Introduction (KL) ok 2 Requirements and Overview (CB) ok 3 Linear motor (CB) – 3.1 Electromagnetic design (PS) missing – 3.2 Stator (CB,PS) needs figs & refs – 3.3 Permanent magnets (CB,PS) needs figs & refs 4 Mechanical design and construction (JT) – 4.1 Target Shaft (JT) needs editing, figs etc – 4.2 Target Bearings (JT) needs editing, figs etc – 4.3 Stator (JT) needs editing, figs etc – 4.4 Mechanical integration (who?? Was EMcC) missing – 4.5 Quality Assurance and Quality Control (JT, GB, PS) partly 5 Optical position-measurement system (CB,PS) nearly! – 5.1 Optical Vane (PS,CB) needs figs & refs – 5.2 Laser Source (PS,CB) needs figs & refs – 5.3 Optical Fibres (PS,CB) needs figs & refs – 5.4 Collimators, Lenses & Mechanical Mount (PS,CB) partly – 5.5 Optical sensors (PS,CB) partly 6 Control system (PS,JL) missing 7 Power electronics (PS,SG) missing 8 Performance (PH,AD) missing 9 Summary (CB) missing 2

Summary Not a lot of progress since early November! Hope to restart editing in New Year. Lots of material provided by JT. CB to edit to make consistent with rest. Intro provided by KL. Other sections written by CB (partly plagiarising PS thesis!). Most lack (sufficient quality) figures. Many sections not yet provided! Who will write “mechanical integration” section (frame, jacking system, services)? – I can write functional description. – Is that sufficient? Previously decided (I think!) to document design of last summer. Do we wish to update? – Review when present version complete? 3