CHAPTER 5 Activity-Based Costing and Activity-Based Management.

Slides:



Advertisements
Similar presentations
CHAPTER 14 Cost Allocation, Customer Profitability Analysis, and
Advertisements

CHAPTER 14 Cost Allocation, Customer Profitability Analysis, and
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Chapter 5 Activity-Based Costing. Over- and Undercosting Overcosting – a product consumes a low level of resources (costs) but is allocated high costs.
Copyright © 2003 Pearson Education Canada Inc. Slide 5-54 Chapter 5 Activity - Based Costing and Activity - Based Management.
2009 Foster School of Business Cost Accounting L.DuCharme 1 Activity-Based Costing and Activity-Based Management Chapter 5.
© 2009 Pearson Prentice Hall. All rights reserved. Activity-Based Costing and Activity-Based Management.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Activity-Based Costing: A Tool to Aid Decision Making Chapter Eight.
CHAPTER 6 Cost Management in an Automated Business Environment ABC, ABM, and TQM.
Cost Allocation Concepts Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 35.
Activity Based Costing: A Tool to Aid Decision Making
Activity Based Costing
5 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Activity-Based Management Chapter.
Chapter 5 Activity-based Cost Systems
8 Activity-Based Costing Chapter Machining Assembly  a cost system refinement  more overhead cost pools.
5 - 1 Activity-Based Costing and Activity-Based Management Chapter 5.
Activity-Based Costing and Activity-Based Management
16-1 Copyright  Houghton Mifflin Company. All rights reserved. Chapter 16 Operating Costs and Cost Allocation, Including Activity-Based Costing Belverd.
© John Wiley & Sons, 2005 Chapter 7: Activity-Based Costing and Management Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Cost Management Measuring,
Activity Based Costing
The Islamic University of Gaza Cost Accounting
Chapter Seven Activity-Based Costing: A Tool to Aid Decision Making.
Activity-Based Costing and Activity-Based Management
5 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Activity-Based Management Chapter.
5 - 1 Overview of Activity-Based Cost Systems for Management Control ACCT7320, Dr. C. Bailey.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Activity-Based Costing
0 CHAPTER 6 Activity-Based Costing © 2009 Cengage Learning.
Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
Prepared by Diane Tanner University of North Florida Chapter 5 1 Allocation of Indirect Costs: Simple Costing & ABC.
Activity-Based Costing and Analysis
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 17-1 JOB ORDER COST SYSTEMS AND OVERHEAD ALLOCATIONS Chapter 17.
The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
© 2016 Pearson Education, Inc.
1 Activity-Based Costing and Activity-Based Management
© The McGraw-Hill Companies, Inc., 2007 McGraw-Hill/Irwin Chapter 21 Cost Allocation and Performance Measurement.
1 Module19 Assigning Indirect Costs: Activity-Based Costing (omit pp to 19-13)
5 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Activity-Based Management.
Chapter Seven Activity-Based Costing: A Tool to Aid Decision Making.
Chapter 4 Product Costing for Management Decisions: Activity-Based Costing and Activity-Based Management.
Chapter 7 Activity-Based Costing and Management
Copyright © 2012 The McGraw-Hill Companies, Inc. PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker,
CHAPTER 6 Activity-Based Costing and Activity-Based Management.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Foundations and Evolutions
When cost systems were developed in the 1800s, the emphasis was on simplicity because: 1. Cost and activity data had to be collected by hand and all calculations.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Activity-Based Costing and Chapter 5.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
© 2012 Pearson Education. All rights reserved. Activity-Based Costing and Activity-Based Management.
CHAPTER 17 Activity Based Costing (ABC). Assigning Overhead Costs There are three ways to __________ overhead costs to production  Plant-wide Overhead.
© 2012 Pearson Prentice Hall. All rights reserved. Activity-Based Costing and Activity-Based Management.
Activity Based Costing Nancy R. Mangold Professor, Department of Accounting California State University, East Bay.
ACTIVITY BASED COSTING Pertemuan 12 dan 13 Matakuliah: > Tahun: >
1-1 CHAPTER 4 Activity-Based Costing and Activity-Based Management Dr. Hisham Madi.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Job Order Cost Systems and Overhead Allocations Chapter 17.
Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 4 Activity-Based Costing Systems.
Prepared by Diane Tanner University of North Florida ACG Allocating Indirect Costs: Simple Costing & ABC 2-2.
Activity-Based Costing and Activity-Based Management
Activity-Based Costing and Activity-Based Management
Activity-Based Costing
Activity-Based Management and Activity-Based Costing
CHAPTER 14 Cost Allocation, Customer Profitability Analysis, and
Activity-Based Costing and Activity-Based Management
Activity-Based Costing and Activity-Based Management
Activity-Based Costing and Activity-Based Management
Activity Based Costing - ABC
Overview of Activity-Based Cost Systems for Management Control
Activity-Based Costing and Activity-Based Management
CHAPTER 14 Cost Allocation, Customer Profitability Analysis, and
Activity-Based Costing and Activity-Based Management
Presentation transcript:

CHAPTER 5 Activity-Based Costing and Activity-Based Management

Problems with One Overhead Pool In the last chapter, the author indicated that one overhead pool can lead to less accurate cost allocation if the overhead is actually incurred in a non-uniform fashion by each product. This is known as Peanut-Butter costing. You are spreading cost evenly across all products when in fact some products create greater or lesser amounts of overhead.

Product Cross-Subsidization Undercosting – product consumes a lot of resources but has little MOH allocated to it.  Set price too low – may actually lose money on these. Overcosting – consumes fewer resources than the allocation of MOH would suggest.  Set price too high – you may lose market share as competitors enter the market with a lower selling price.

Refinements in Overhead Costing Want to tie costs incurred to cost objects more accurately 3 Improvements  Increase direct cost tracing - pull costs out of overhead and trace to products  Increase number of indirect cost pools - so that all costs in a pool have the same relationship with the cost allocation base  Identify appropriate cost-allocation bases for each indirect cost pool (cause and effect)

Why is this so important? Refinements in our cost systems are needed more now than ever.  Increases in diversity of product lines and mass customization  Increase in indirect costs as a % of the total product cost  Price competition Advances in computer technology allow us to create better cost systems.

Activity-Based Costing A system that deals more effectively with allocation of overhead Utilizes more cost pools/ allocation bases Cost pools reflect activities taking place  Purchasing all raw materials, set-up costs, design costs Allocation bases are units of the activity  # of parts purchases, # of different parts  # of setups

Cost Hierarchy We gather costs into pools based on the following hierarchy of costs.  Unit-level costs  Batch-level costs  Product or Service sustaining costs  Facility sustaining costs

Unit Level Costs Some costs vary as the # of units completed vary.  Direct costs are examples of unit-level costs  Machine operating costs increase as the number of products worked on increases  machine hours might the appropriate driver to use.

Batch-level Costs Some costs are increased not by the # of units but by the # of batches.  Machine set-up, recalibration, tool and dies, reprogramming CAD/CAM computers for each custom order, etc. These costs don’t vary by direct labor hour, but they vary as the # of batches vary. We want a cost allocation base that reflects the batches.

Product Sustaining Costs We incur costs to sustain a particular product or service.  Manufacturing: design costs of new product  College: costs incurred to bring a new program on line  Accounting: costs incurred to provide a new service (Web Trust) Allocation base must reflect the # or complexity of products or services

Facility Sustaining Costs These represent broad-based costs of running a particular facility  utilities, rent of space, depreciation of the building It doesn’t make sense to allocate these costs on the basis of a unit-level driver, so we might use floor space per department as the initial allocation method.

Activity-Based Costing What kinds of companies would benefit from ABC?  Those with multiple products consuming different amounts of indirect costs  Those with complex, varied operations  Those in highly competitive environments where cost control is critical  Those with access to accounting and information systems expertise

How to Implement ABC Understand the activities in your facility Categorize the activities into different cost hierarchy Select the allocation base which explains the cost of the various activities identified Compute allocation rates Allocate costs to products Used revised data in the decision process

Activity-Based Costing Disadvantages  Availability of reliable data - we may need to redesign the information system to get what we need  Cost to design and implement are higher  Some costs may feed into multiple activities. Shared costs must be allocated to activities first then to products

ABC and ABM ABC improves product costing.  ABM uses ABC data to improve customer satisfaction and profitability. ABM allows us to  make better pricing and product mix decisions  reduce costs and improve processes now that we understand our costs design changes that might lower costs without affecting product quality and performance  more effectively plan and manage activities more effective evaluation of performance

Keep on rollin’…