AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Analysis Cold Xe Gas Thrusters [Brian Erson] [Attitude] 1.

Slides:



Advertisements
Similar presentations
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase [Brian Erson] [Attitude] 1.
Advertisements

AAE450 Spring 2009 Propellant Choice and Mass Estimates for the Translunar OTV Week 2 Presentation Thursday, Jan 22, 2009 Brad Appel Propulsion Group.
AAE450 Spring 2009 Final Presentation Draft Slides Description: Some draft slides and ideas 3/26/09 Kris Ezra Attitude 1.
AAE450 Spring 2009 Time to Complete 50m/s ΔV & 100g Payload System Overview Brittany Waletzko 100g Payload Integration Manager Translunar/OTV Phase Week.
AAE450 Spring 2009 Hopper Trajectory February 26, 2009 [Alex Whiteman] [Mission Ops] [Lunar Descent] Page 1.
AAE450 Spring 2009 Arbitrary Payload Cost Optimization to LLO Tasks: Payload Cost / Mass Optimization (Launch to LLO) Disprove Momentum Transfer Alternative.
The Lander is at a 25 km Lunar altitude and an orbital period of approximately 110 minutes. After separation occurs the Lander is completely self sufficient.
AAE450 Spring 2009 Slide 1 of 8 Orbital Transfer Vehicle (OTV) Masses and Costs Ian Meginnis March 12, 2009 Group Leader - Power Systems Phase Leader -
AAE450 Spring 2009 Kelly Leffel 3/26/09 Structures and Thermal Lunar Descent Phase Lander Integration Lander Thermal Control (Day) Kelly Leffel Structures.
AAE450 Spring 2009 Lander Phase: Hybrid Propulsion System Propulsion System Sizing and Inert Mass Analysis Hopper and Rover Designs for 10kg Payload Hopper.
AAE450 Spring 2009 More Attitude Control Thruster Options Brittany Waletzko Translunar/OTV Phase Week 7 Brittany Waletzko - ATT.
AAE450 Spring 2009 Analysis of Trans-Lunar Spiral Trajectory [Levi Brown] [Mission Ops] February 12,
AAE450 Spring 2009 Preliminary Lunar Descent Attitude Control Analysis Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control.
AAE450 Spring Attitude Control – Arbitrary Payload Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis Design.
AAE450 Spring Spinning Descent and Compressed Gas Hopper Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis.
AAE450 Spring 2009 Final Sizing and Trajectory Design for 100 g/10kg Payloads [Levi Brown] [Mission Ops] March 12,
AAE450 Spring 2009 Project X pedition Final slides outline for Orbital Transfer Vehicle Propulsion Week 11 Presentation Thursday, March 26, 2009 Brad Appel.
AAE450 Spring 2009 Tony Cofer Power Group TLI Phase 03/05/09 Power Limitations for Arbitrary Payload Tony Cofer] [Power] page 1.
AAE450 Spring 2009 Propellant Requirements Attitude Control Thrusters with Low Thrust Orbit Trajectories [Josh Lukasak] [Attitude Group Lead]
AAE450 Spring 2009 LEO Atmospheric Drag Analysis and Lunar Orbit Circularization [Andrew Damon] [Mission Ops] February 19,
AAE450 Spring 2009 Lunar Descent Final Numbers Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 03/12/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Translunar Orbit Transfer Vehicle (OTV): Propulsion System Setup for 100g & 10 kg Case Launch Vehicle Selection for Arbitrary Case Thermal.
AAE450 Spring 2009 Descent Trajectory Hover Trajectory LD Code Integration John Aitchison March 5 th, 2009 [John Aitchison] [Mission Ops]
AAE450 Spring Gram Mission Integration and Model Korey LeMond STRC/THM/INTEG GL [Korey LeMond] [STRC/THM/INTEG/CAD GL, OTV Phase] 1.
AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3.
AAE450 Spring 2009 OTV Attitude Propulsion Thursday, January 22, 2009 Ryan Lehto, Propulsion.
AAE450 Spring 2009 Lunar Lander Preliminary propulsion system selection and design analysis Thursday, January 22, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Translunar OTV (Orbital Transfer Vehicle) : Chemical Propulsion System Refined estimates: OTV WET Mass, Propellant Volume & Propellant.
AAE450 Spring 2009 Lunar Capture Altitude Mass to LLO for Arbitrary Time to Rotate Lander During Descent Camera/Dust Removal [Kara Akgulian] [Mission Ops]
AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Thruster Analysis [Brian Erson] [Attitude] 1.
AAE450 Spring Lunar Descent Attitude Control Analysis Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis.
AAE450 Spring 2009 Launch Vehicle Performance Payload Cannon Zarinah Blockton Mission Ops~Group Earth to LEO~Phase Rover ~Phase February 19, 2009.
Week 13 Presentation Thursday, April 9 th, 2009 Saad Tanvir Propulsion Group 1 Lunar Descent – Hybrid Propulsion System Propulsion System Inert Mass Finals.
AAE450 Senior Spacecraft Design Poliskie - 1 T.J. Poliskie Week 7: March 1, 2007 Propulsion Earth Taxi, Mars Taxi Group Updated Propulsion System Analysis.
A Comparison of Nuclear Thermal to Nuclear Electric Propulsion for Interplanetary Missions Mike Osenar Mentor: LtCol Lawrence.
By Will Parnell. * The system creates propulsion using an inert gas such as Nitrogen or Helium as the fuel. * The gas is stored under high pressure, then.
1 AAE 450 Spring 2008 Stephen Bluestone March 20, 2008 Propulsion Final Presentation Slides 1.
AAE450 Spring 2009 OTV 3-D GEOMETRY & INTEGRATION Korey LeMond STRC/THM/INTEG/CAD GL, Locomotion Phase OTV Phase [Korey LeMond] [STRC/THM/INTEG/CAD GL,
AAE450 Spring 2009 Kelly Leffel 3/0509 Structures and Thermal Lunar Descent Phase Lander Integration Lander Thermal Control Kelly Leffel Structures and.
Upper Stage Weekly Summary 3/3 – 3/9/2008 Talked to Joe about simulation Joe said that the Δv’s seemed high but reasonable Joe suggested running simulations.
AAE450 Spring 2009 Slide 1 of 7 Final Presentation Slides Ian Meginnis April 9, 2009 Group Leader - Power Systems Phase Leader - Translunar Injection OTV.
AAE450 Spring 2009 Slide 1 of 8 Final Presentation Back-up Slides Orbital Transfer Vehicle (OTV) Power and Thermal Control Ian Meginnis Ian Meginnis Power.
Force of Gravity Pre-Lab Are the forces of gravity acting on the two students different? What is another term that means the force of gravity? Weight –
AAE450 Spring 2009 Preliminary Trans-Lunar Analysis [Levi Brown] [Mission Ops] January 29,
AAE450 Spring 2009 Lunar Lander Main Engine Thaddaeus Halsmer Thursday, February 12, 2009 Thaddaeus Halsmer, Propulsion.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Comparison [Brian Erson] [Attitude] 1.
Final Slides By: Kara Akgulian Mission Ops Locomotion Phase 1.
AAE450 Spring 2009 Kelly Leffel 2/5/09 Structures and Thermal Lunar Descent Phase Kelly Leffel Structures and Thermal 1.
AAE450 Spring 2009 Lunar Night and Lander Power System Adham Fakhry February 26th, 2009 Power Group Lunar Descent Phase Passive Thermal Control for Lunar.
AAE450 Spring 2009 Hydrogen Peroxide vs. Hydrazine Attitude Control Thrusters Brittany Waletzko Translunar/OTV Phase Week 5 Brittany Waletzko - ATT.
AAE450 Spring 2009 Final Lander Volume and Mass 10kg, 100g, Arbitrary March 12, 2009 Lunar Descent Phase Group [Ryan Nelson] [STRC] 1.
AAE450 Spring 2009 Launch Vehicle Selection Zarinah Blockton Mission Ops~Group Earth to LEO~Phase March 5, 2009.
AAE450 Spring 2009 Power Systems for Lander Adham Fakhry [Adham Fakhry] [Power]
AAE450 Spring 2009 Lander Sizing and Launch Vibrations Feb. 12, 2009 Earth Launch/Lunar Descent Phase Group 1 [Ryan Nelson] [STRC]
Cost Comparison of Higher Parking Orbit Scale up for Arbitrary Payload
Week 6 Presentation Thursday, Feb 19, 2009
Attitude, Lunar Transfer Phase
Three-Body Trajectory Model and Spiral Transfer Matching
Fixed Main Engine versus Gimbal Mounted Alternative
Lunar Descent Slide Suggestions & Questions
Lunar Descent Trajectory
By: Josh Lukasak Attitude Group Lead Lunar Descent Phase Manager
[Kara Akgulian] [Mission Ops]
Lunar Descent Trajectory Optimization
Week 4 Presentation Thursday, Feb 5, 2009
Force of Gravity Pre-Lab
Final Slides Attitude Control System (ACS) – Lunar Transfer
Team A Propulsion 1/16/01.
Sarah Shoemaker 3/20/2008 Structures, Gondola Design, Tanks, CAD Final Slides AAE 450 Spring 2008 Structures.
Presentation transcript:

AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Analysis Cold Xe Gas Thrusters [Brian Erson] [Attitude] 1

AAE450 Spring 2009 [Brian Erson] [Attitude] 2 Current H2O2 system Advantages System is useful for an arbitrary payload mass No increased inert mass System has dual role in OTV and Lunar descent Disadvantages Current H202 system is too large (13N thrust) to use for in flight attitude control with 100g and 10kg payloads De-saturation (DS) maneuvers alone cost > 6kg Small attitude adjustments more complex with large system

AAE450 Spring 2009 [Brian Erson] [Attitude] 3 Cold Xe Gas Thruster Advantages Xe DS propellant use is negligible (< 400g) Easy to integrate Small thrust is suitable for OTV attitude control and DS maneuvers Thruster mass is very small 75g each) Total system mass is 5.4kg (at least 1 kg less than H2O2) Disadvantages Both systems would need to be used Dollar cost is significant $25K each) Power usage increases (1 Watt Peak ) System would not be as useful for arbitrary payload mass Recommendation Cost tradeoff favors H2O2 thrusters for Earth to LEO cost estimates Need to integrate smaller H2O2 thrusters within current system

AAE450 Spring 2009 [Brian Erson] [Attitude] 4 Backup Slide 1 Cost tradeoff: Xe thruster system cost:$100,000 Current Earth to LEO cost/kg:$4400 Economical mass savings 22.7 kg Xe system mass savings < 5.0 kg Xe system Earth to LEO cost:~$20,000/kg Note: Unless Xe system saves upward of 22.7 kg,or the cost decreases, it is not economically feasible to install the system. Further analysis will be done to improve mass and dollar cost numbers of both systems.

AAE450 Spring 2009 [Brian Erson] [Attitude] 5 Backup Slide 2 Xe DS propellant calculation Total DS force needed: Max torque of Rxn Wheel:0.03Nm DS per day:6 Mission length:365 days Moment arm1.0m Total:65.7 N Total number of N4380thrusts Marotta Cold Xe gas thruster Specs: Mass:0.075kg Isp:68sec Thrust:0.015N Time per thrust:0.04sec Mass Flow Calculation: Isp = Force/massflow * gravity Mass flow:0.0022kg/sec Total Mass: kg/sec * 0.04 sec/thrust * 4380 thrusts = kg