1 Universities Space Research Association SSC Meeting 11-12 January, 2007 User Tools for Cycle 1 Phase I: Proposal Preparation and Submission R. Y. Shuping.

Slides:



Advertisements
Similar presentations
1 Universities Space Research Association User Tools for Cycle 1 Phase II: SOFIA Spot R. Y. Shuping DCS Development Lead L. Lin DCS Engineer J. Rho Associate.
Advertisements

Automated Software Testing: Test Execution and Review Amritha Muralidharan (axm16u)
Network Design and Implementation
Software Quality Assurance Inspection by Ross Simmerman Software developers follow a method of software quality assurance and try to eliminate bugs prior.
SOFIA Stratospheric Observatory for Infrared Astronomy DCS PDR at RIT3/7/2000 DCS Preliminary Design Review Sean C. Casey USRA Senior Scientist Lead Scientist.
Systems Development. Systems Development Life Cycle (SDLC) A “baseline” process for the development of application systems Contains a comprehensive set.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Systems Analysis and Design in a Changing World, 6th Edition
Implementation/Acceptance Testing / 1 Implementation and Acceptance Testing Physical Implementation Criteria: 1. Data availability 2. Data reliability.
U-Mail System Design Specification Joseph Woo, Chris Hacking, Alex Benson, Elliott Conant, Alex Meng, Michael Ratanapintha April 28,
Planning. SDLC Planning Analysis Design Implementation.
Software Testing Test Design and Implementation. Agenda Test Design Test Implementation Test Design Sources Automated Testing 2.
Glenn Research Center at Lewis Field Software Assurance of Web-based Applications SAWbA Tim Kurtz SAIC/GRC Software Assurance Symposium 2004.
Acquiring Information Systems and Applications
THE SYSTEMS LIFE CYCLE ANALYSE DESIGN IMPLEMENT MAINTENANCE IDENTIFY/INVESTIGATE.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
Callis ApS, Copyright © Reviewer Training Material Callis Reviewer version 1.1.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 4.1.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
STIS Closeout Plan Paul Goudfrooij 2005 HST Calibration Workshop, 10/26/2005.
SI team data access Scott Horner 28 September 2009.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
IVC : a simulation and model-fitting tool for optical-IR interferometry Abstract I present a new software tool, called “Interferometry Visibility Computations”
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
Cycle 1 Planning Process B-G Andersson (SOFIA Science Operations Manager) & Ravi Sankrit (User Support Scientist) SSSC, May 11, 2011 Mountain View.
Integrated Data Cycle Systems Harvey E. Rhody Chester F. Carlson Center for Imaging Science.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
08/30/05GDM Project Presentation Lower Storage Summary of activity on 8/30/2005.
1 R. D. Gehrz 67th International Symposium on Molecular Spectroscopy, Columbus, OH, June 21, 2012 The Stratospheric Observatory for Infrared Astronomy.
Construction, Testing, Documentation, and Installation Chapters 15 and 16 Info 361: Systems Analysis and Design.
TESTING LEVELS Unit Testing Integration Testing System Testing Acceptance Testing.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
NASA Herschel Science Center - page 1 NHSC Cycle 1 Open Time Proposal Planning Workshop 3-4 June 2010 PACS Accepted Programs & Observations to Date B.
Obs. Planning Workshop 22 July 2011 NASA Herschel Science Center - page 1 PACS David R. Ardila NHSC-HSC liaison The OT2 Call.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Content Management System/ Web Quality Initiative Administrative Departments.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
JWST PRDS Project Mangement Case Study Jesse Doggett Project Engineer, ITEB/OED.
HDF-EOS Workshop IV September 19-21, 2000 Richard E. Ullman ESDIS Information Architect NASA/ GSFC, Code 423.
Chapter 12 The Network Development Life Cycle
1 FLITECAM April 28, 2009 Ian McLean (Principal Investigator) UCLA Infrared Laboratory University of California, Los Angeles.
1 HIPO Trimester Review Status Report Ted Dunham Lowell Observatory 28 April, 2009.
1 Object-Oriented Analysis and Design with the Unified Process Figure 13-1 Implementation discipline activities.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
EDS 1 Early Delivery Systems EDS 1 Update Jonathan Pulcini - Project Manager August 13, 2007.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Georgia Fujikawa and Bob McQuillan Electronic Resource Management: Getting a Running Start on Your Implementation May , 2009.
1 Universities Space Research Association Science Instrument Pipeline Requirements SSSC 2009 September 29 Erick Young Director SOFIA Science Mission Operat.
Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.
Introducing the INS Master Schedule Wayne Baggett.
EDS 1 Early Delivery Systems EDS 1 Update for Workshop Jonathan Pulcini - Project Manager August 17, 2007.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Software Test Plan Why do you need a test plan? –Provides a road map –Provides a feasibility check of: Resources/Cost Schedule Goal What is a test plan?
GLAST Science Support Center November 8, 2005 GUC Action Item #15 AI#15: Pre-Launch GI Proposal Tools David Band (GSSC/JCA-UMBC)
Software Project Configuration Management
Managing the Project Lifecycle
Applied Software Implementation & Testing
Chapter 1 (pages 4-9); Overview of SDLC
Welcome Traceability Software Integrators
5 POINT PLAN THE SYSTEMS LIFE CYCLE ANALYSE DESIGN
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
An introduction into technical and functional testing
Presentation transcript:

1 Universities Space Research Association SSC Meeting January, 2007 User Tools for Cycle 1 Phase I: Proposal Preparation and Submission R. Y. Shuping DCS Development Lead W. Vacca DCS Senior Scientist

2 Universities Space Research Association SSC Meeting January, 2007 Phase I: Proposal Preparation and Submission During Phase I, GI prepares proposal and submits electronically to SSMOC for review. Proposal Contents: –Cover Info: Investigators, abstract, timing constraints –List of Proposed Observations: Position, instrument/config, filters/gratings, total integration time, etc… –Scientific/Technical Justification: attached PDF file

3 Universities Space Research Association SSC Meeting January, 2007 Phase I Tools SOFIA Instruments Time Estimator (SITE): web-based tool that provides sensitivity estimates (S/N, integration times for given source flux). – SOFIA Proposal Tool (SPT): stand-alone JAVA application for preparing and submitting all proposal materials. – Visibility Tool (VT): web-based tool that plots visibility/heading plots given source position, aircraft location, and date/time. –Informational only – output from VT not required as part of proposal submission. But useful in determining schedule constraints. –

4 Universities Space Research Association SSC Meeting January, 2007 Data Cycle System Planning Database All proposals submitted to the SSMOC are parsed and stored in the DCS Observation Planning database. Planning database can be accessed (by SMO staff) via web pages which provide: –Access controls –Duplicate checking (between planning DB and archive) –Review tracking (e.g. time awarded, TAC grade, notes, etc…)

5 Universities Space Research Association SSC Meeting January, 2007 Development Overview Development for SPT/SITE/VT and proposal submission system is basically complete (all requirements met). –Upgrades still required for new SIs/modes or updates to existing SIs/modes. –Exception: spectroscopy support for SITE (see below) Issues filed as Software Problem Reports (SPRs) and assigned to upcoming releases based on operational needs and resource constraints. Personnel (FTE): –Sean Colgan (NASA): SPT/VT/SITE (<1.0 on-going) –Lan Lin (USRA), R. Krzazcek (RIT): Proposal submission system (~0.5 each, as needed) –Li Sun (USRA): Planning database infrastructure/applications: (~1.0, as needed)

9 Universities Space Research Association SSC Meeting January, 2007 Basic Science Proposal Submission First real-world use of SPT/SITE and proposal submission system: –Overall, system worked as designed –165 submission/resubmission transactions with 9 errors. Total Proposals Received: 60 Submission loads were modest and well within our system stress test benchmarks: –Last 24 hours: 90 proposals submitted. 24 hour system stress test: >1000 proposals submitted. –Peak submission rate: 1 proposal/min (not sustained) System stress test: 120 proposals in 2 minutes. Issues and Lessons Learned: –One lost proposal – situation understood, documented. –22 Software Problem Reports (bugs) filed (SPT/SITE/VT). –2 procedural issues identified.

10 Universities Space Research Association SSC Meeting January, 2007 Issues with SPT/SITE/VT SITE Issues: –Clean up input flux handling (SPR 509) –Synchronize units in SITE and SPT (SPR 629) VT Issues: –Fix/update astronomical name resolution (SPRs 510, 721, 722) –User interface clean-up (SPRs 217, 442) SPT Issues: –Improve error/status messages (SPRs 536, 633) –Fix support for GREAT frequencies (SPR 549) –Issues with cover info data (SPRs 380, 533) –UI Issues (SPRs 520, 538, 551) –Improve PDF handling (SPR 543, 592) –Synchronize units with SITE (SPR 630)

11 Universities Space Research Association SSC Meeting January, 2007 SI Configurations to be offered for Cycle 1: FORCAST Imaging (SUP) FORCAST Grisms (Shared Risk) GREAT Low (SUP) GRAT Medium (Shared Risk) FLITECAM Imaging (SUP) FLITECAM Grisms (Shared Risk) HIPO (SSI)

12 Universities Space Research Association SSC Meeting January, 2007 SPT/SITE Support for Cycle 1 Do we support all Cycle 1 SIs in SPT? –Yes, not hard and streamlines proposal preparation/review. –Only issue would be accuracy of overheads for Shared Risk SIs and HIPO. Do we support all Cycle 1 SIs in SITE? –Yes for SUP SIs –Not clear that we will have good sensitivity numbers for Shared Risk SIs. Could provide expected sensitivities via static look-up- tables/plots on SOFIA website. –What about HIPO?

13 Universities Space Research Association SSC Meeting January, 2007 Updates to SPT and Proposal Submission System Need specification of SI configurations and modes to be offered (Documented in SI-DCS ICDs) from Cycle 1 SI teams ASAP: –Filters/grisms available –Overheads for each observing mode Need to update SPT and proposal submission system to support new configurations and modes.

14 Universities Space Research Association SSC Meeting January, 2007 Updates to SITE/VT SITE currently supports imaging modes only. Need to provide support for spectroscopic modes as well: –Sensitivity as function of wavelength –Update to atmospheric modeling (ATRAN) –Slit-losses and other throughput considerations Need current (best available) sensitivity estimates/algorithms for all SI configurations/modes (documented in SI-DCS ICDs) from Cycle 1 SI teams ASAP. Need maximum integration time calculator for VT, based on mean time between LOS resets.

15 Universities Space Research Association SSC Meeting January, 2007 Updates to VT. Should consider adding maximum integration time calculation to VT (or SITE?), based on mean time between LOS rewinds – very useful for GIs observing faint objects.

16 Universities Space Research Association SSC Meeting January, 2007 DCS v2.0 Development Schedule (SITE/SPT/VT) July: Delta Design Review July - Aug: Implementation and informal test Sept: Test Readiness Review Sept: Formal Testing Sept. 30: Release of SITE/SPT/VT Oct: Cycle 1 Call for Proposals

17 Universities Space Research Association SSC Meeting January, 2007 Proposed Prioritization 1.Updates to SPT and proposal submission system to support all instruments/configs/modes for Cycle 1. –Needed to ensure efficient/effective proposal handling. 2.Update SITE with current sensitivities for all Cycle 1 SIs. –Needed to ensure that GIs enter correct integration times into SPT. 3.High priority SPRs (SPT/SITE) –Issues that affect usability or clarity 4.Add spectroscopic functionality to SITE for Grisms and GREAT. –Spectroscopic sensitivities could be provided via static look-up- tables/plots on SOFIA website (Not Ideal). 5.Add maximum integration time calculator to VT. 6.Low priority SPRs (SPT/SITE/VT)

18 Universities Space Research Association SSC Meeting January, 2007 Schedule Issues Currently not enough resources to complete all bug fixes and updates required in time for CfP. –SPT/SITE development lead (Sean Colgan) is part-time and also working on KOSMA translator software. Mitigation: –Add resources: Not clear we can get someone up to speed fast enough to make these updates. –Reduce Scope: SPT changes *must* be done to ensure that we can handle submitted proposals effectively and efficiently SITE changes could be scaled back, e.g. provide sensitivities only for fiducial wavelengths. May not provide enough schedule relief. Note that SITE updates are not *strictly* required from data handling perspective; time estimates for Grism modes could be provided by some other method.