AFC Schedule Review Tom BradshawWing Lau John CobbElwyn Baynham CM25 Collaboration Meeting November 2009 RAL.

Slides:



Advertisements
Similar presentations
FCMAT Response & Preparation: Process Outline October 25, 2006.
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
AFC Schedules and Status Tom Bradshaw John Cobb Wing Lau Matt Hills MICE MICO Meeting 12 th October 2011 Elwyn Baynham Mike Courthold Victoria Bayliss.
AFC Status Tom Bradshaw John Cobb Wing Lau Matt Hills MICE MICO Meeting 11 th January 2012 Elwyn Baynham Mike Courthold Victoria Bayliss 1.
AFC engineering group meeting on the 26 th of Jan 2004 MICE Absorber Focus Coil work schedule for the next 6 months By Wing Lau, Oxford.
Briefs submitted for the TB to approve Tesla’s long lead items: 1)Cold Mass Forging 2)Super conductor wire.
K. Long, 12 June 2015 Project manager report WBS revision Technical Board Membership Meetings.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Cooling Channel Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICE Collaboration.
1 MICE Video Conference Reception of FC magnets Andy Nichols, STFC,
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Financial Upgrade 8.8 Update. Status Fit Gap Complete Fit Gap Complete Design in Progress Design in Progress Development in Progress Development in Progress.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
1 MICE Mtg June Elwyn Baynham RAL Focussing Absorber Magnet Brief comments on design status Focus Absorber WG meeting 13 June 2003.
RFCC Module Tech Board Schedule Discussion Steve Virostek Lawrence Berkeley National Lab MICE CM25 at RAL November 4, 2009.
1 SWE Introduction to Software Engineering Lecture 6 - Software Project Management.
Funding engineBilling engine Funding engine.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Progress on AFC since the PRR By Wing Lau, Oxford University.
Confidential Not for Distribution AFC Module Tender Action Scope The tender called for 2 AFC modules to be ordered immediately with the option for the.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
Project Highlights. New Process Project Report videos available at
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
Project manager report paul drumm CM16 October 2006.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
MICE Preparations for CM18 Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Video Conference April 12,
Goals & Status MICE CM 33 Thanks go out to the organizers: Paul Soler, Ryan Bayes and Valerie Flood.
MICE Collaboration meeting (CM20) At RAL 10 – 13 Feb 2008 AFC Magnet – Status and Progress W. Lau, Oxford University.
For internal use only 1© Nokia Siemens Networks R 255 G 211 B 8 R 255 G 175 B 0 R 127 G 16 B 162 R 163 G 166 B 173 R 137 G 146 B 155 R 175 G 0 B 51 R 52.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
[Date] Next Review [Date] [Agency] Project Review 1.
2 Oct 2008PC We have only 1 hour today May need to be brief.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
Task 5: High-Tc Superconducting Link Status Update Meeting Eucard - WP7 Collaboration Meeting (video) A. Ballarino, G. Hurte, G. Willering (CERN) M. Tropeano,
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
Collaboration With DTTN 30 Aug Project Background Project Title An eLogistics Appliance with Data Exchange and Conversion Technologies for Infrastructure.
Progress on AFC Procurement T W Bradshaw Rutherford Appleton Laboratory Harwell Science and Innovation Campus Didcot, OX11 0QX, UK
1 MICE CM25 Engineering Session Summary Contents: Infrastructure Diffuser Coupling Coils Radiation Shutter AFC module EMR Andy Nichols, STFC, 4-7 th November.
SRG Gantt Chart Template
Feb March April May June July Spiral 1 Spiral 2
MICE CM31 Schedule summary
Initiative Name Initiative Leader Target Go Live Date: Reporting Date
MICE NEWS MICE VC 155 Next Collaboration meeting will be
MICE PM Report Progress with the Infrastructure A few problems
Spectrometer Solenoid Fabrication Status and Schedule
Hire Toyota Innova in Delhi for Outstation Tour
13-block rotation schedule
XRN4361 – UK Link Release 2 - Delivery
XRN November 2019 Release - Status Update
Modified at -
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Presentation transcript:

AFC Schedule Review Tom BradshawWing Lau John CobbElwyn Baynham CM25 Collaboration Meeting November 2009 RAL

AFC Status Current schedule confirmed at meeting 8 th October Design to accommodate absorber fittings and fix related issues progressing Superconductor in hand Bobbin material in hand Cryocoolers due soon

Schedule Milestones ModuleItemDate 1End Delivery and commissioningEarly Aug 2010 Field map & absorber integrationEnd Dec End Delivery and commissioningMid Dec 2010 Field map & absorber integrationEarly June 2011 Milestones and cost profile integrated into main project plan Tesla Engineering schedule modified to correct where they think they have been optimistic e.g. winding, delivery