ABSTRACT Sequential bidding by suppliers on complex engineering/manufacturing contracts has become pervasive in many manufacturing industries. In maturing.

Slides:



Advertisements
Similar presentations
Chapter 15. Managing the Industrial Pricing Function BA B2B Marketing Lindell Phillip Chew.
Advertisements

Capacity Planning For Products and Services
Design of Goods and Services
Market-Based Management, 4th edition
Dr. A. K. Dey1 Inventory Management, Supply Contracts and Risk Pooling Dr. A. K. Dey.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
CAPACITY LOAD OUTPUT.
By: Bloomfield and Luft Presenter: Sara Aliabadi October,9,
Investment Decision-making. Content Investment Issues with investment appraisal Investment appraisal techniques: –Payback –Average Rate of Return (ARR)
ECON107 Principles of Microeconomics Week 11 NOVEMBER w/11/2013 Dr. Mazharul Islam Chapter-11.
MANAGEMENT ACCOUNTING
Strategic Profitability Analysis
Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 10 The Role of Costs in Pricing Decisions.
Pricing Decisions and Cost Management
OPTIMUM SEQUENTIAL BIDDING IN MATURING INDUSTRIES: IMPLICATIONS FOR GENERATING COMPETITIVE ADVANTAGE Yavuz Burak Canbolat, Ph.D. and Kenneth Chelst, Ph.D.
Reynolds Metals Company Distribution Channel Strategy Managing Incentives under Intensive Distribution March 2000.
Operations Management
1. Cost Concepts & Design Economics
Ch. 21: Production and Costs Del Mar College John Daly ©2003 South-Western Publishing, A Division of Thomson Learning.
Perfect Competition Chapter Profit Maximizing and Shutting Down.
Example: Rate of Return Suppose you invested $50,000 to get your new start-up company up and running. After one year your company produces a profit of.
MR2100 (c) Paul Tilley Pricing: Building a Price Foundation Chapter 13 Marketing 2 MR2100.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 4 How Businesses Work.
Purchasing.
Topic on Production and Cost Functions and Their Estimation.
Pricing and Strategies
Spreadsheet Demonstration
Integrating Business Strategy and R&D Strategy Frameworks for R&D Strategy Formulation.
Macroeconomic and Industry Analysis Chapter 12 Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin.
PRICE PLANNING AND STRATEGY
Chapter 18 Price Setting in the Business World. How are prices set by business people? Costs provide a price floor. See what substitute products are priced.
Ch2-1 Chapter 4: Competitor Analysis “What are they going to do?”
7-1 CHAPTER 7 Bonds and Their Valuation Key features of bonds Bond valuation Measuring yield Assessing risk.
9 Differential Analysis and Product Pricing Managerial Accounting 13e
Economic Optimization Chapter 2. Chapter 2 OVERVIEW   Economic Optimization Process   Revenue Relations   Cost Relations   Profit Relations 
Inventory Management and Risk Pooling (1)
6 © 2004 Prentice Hall Business PublishingPrinciples of Economics, 7/eKarl Case, Ray Fair The Production Process: The Behavior of Profit-Maximizing Firms.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Pricing and Strategies
New Keynesian School Nominal Rigidities. Some Keynesian models rely on the failure of nominal wages and prices to adjust to their new market clearing.
Capacity Planning. Capacity Capacity (I): is the upper limit on the load that an operating unit can handle. Capacity (I): is the upper limit on the load.
CH’NG CHIA YEE CHUA YI MEI NEW SZE YEE ONG WEI LING KOK KHAR HOW
PRICING AND PRODUCT MANAGEMENT: UNDERSTANDING COST
Chapter 7 Supply Management. Chapter Objectives Be able to:  Discuss the rise of global sourcing and the important financial and operational performance.
Business Strategy: Differentiation, Cost Leadership, and Integration Joe Mahoney.
NewShoes Introduction NewShoes Overview 3 A computer based, competitive simulation of the athletic shoe industry focusing on the 4 Ps of marketing. Students.
Pricing of Competing Products BI Solutions December
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 8 1.
If the primary determinant of a firm's profitability is the attractiveness of the industry in which it operates, an important secondary determinant.
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 9 1.
The Costs of Production Please listen to the audio as you work through the slides.
5-1Capacity Planning William J. Stevenson Operations Management 8 th edition.
The Value Chain Every firm is a collection of activities that are performed to design, produce, market, deliver, and support its product. All these activities.
Operations Management
Auctions and Competitive Bidding
For Products and Services
UNIT 6 COSTS AND PRODUCTION: LONG AND SHORT-RUN, TOTAL, FIXED AND VARIABLE COSTS, LAW OF DIMINISHING RETURNS, INCREASING, CONSTANT AND DIMINISHING RETURNS.
Markets for Factors of Production
Chapter 2: Cost Concepts and Design Economics
Insert Your Title Here Insert Authors Here
Insert Your Title Here Insert Authors Here
Capacity Planning For Products and Services
Capacity Planning For Products and Services
Operating in a Global Business Environment
Profit-Maximizing Level for Mini-Z
Profit-Maximizing Level for Mini-Z
Production and Operations Management
Capacity Planning For Products and Services
Presentation transcript:

ABSTRACT Sequential bidding by suppliers on complex engineering/manufacturing contracts has become pervasive in many manufacturing industries. In maturing industries, such as autos, relational ties between suppliers and the OEMs they serve have become key ingredients in profit performance, initial and subsequent pricing, and the probabilities of winning sequential contracts. Yet, the literature is relatively barren in studies that explore this phenomenon. In this paper, we attempt to fill this void. We develop alternative models of sequential bidding by a tier one supplier in the automotive industry. We show how optimum bid prices for each bidding cycle over a fixed time period can be derived through the use of backward dynamic programming. This unique approach takes into account the supplier’s ability to learn from its experiences with a particular OEM and explores the value of relational ties with that OEM and the use of loss-leader pricing when developing a long-term, sequential bidding strategy. What is NEW? & Contributions  First attempt to model complex engineering bidding environment  Consider future bidding opportunities  Introduce two new bidding parameters - NOT just price  Cost reduction  Competitive advantage parameter – reflect relationship between supplier and OEM  Supplier must consider subsequent bids if there is linkage between contracts  Supplier may use LOSS LEADER strategy if  Significant cost reduction in subsequent years  OEM considers the prior relationship Critical Modeling Parameters  Competitive advantage  δ: Amount new supplier will have to underbid an existing supplier in order to win first contract. Percentage savings to the OEM  Factored into calculation of probability of winning the bid  Cost reduction  Cost reduce by  % through a) Learning, b) Start-up cost  Two supplier compete to win bid from OEM  SX: Supplier X - New  CY: Current Supplier Y (SX’s competitor)  The probability of winning bid is function of two factors  Bid prices of SX and CY  Prior Relationships between supplier and OEM (competitive advantage)  Costs will decrease by a  % in second bidding cycle due to reduction in fixed cost and learning if SX won first bid  OEM willing to pay δ% more to supplier with which it has satisfactory relationship when compared to lowest other bid  Optimize the bid of SX Assumptions  Objective: Maximize expected total profit over two stages using conditional expected values Model I - Bid Price CAN Increase in Year 2 Backward dynamic programming finds optimum bid Optimum Bid in Year 2 if SX Wins First Bid  Optimum bid in this state depends on upper limit of CY’s bid (φ U ), competitive advantage (δ) and SX’s cost (μ 1 )  As δ increases, the optimum bid declines  Cost reduction has NO impact on optimum bid  Observation: As δ increases, optimum bid price in this state declines Optimum Bid in Year 2 if SX Did NOT Win First Bid  B 1 * depends on  Upper limit of CY’s bid,  SX’s cost,  Cost reduction percentage,  Competitive advantage,  Optimum bid prices in the second period (therefore profits)  Observation: SX must consider future opportunities when bidding on first contract  Observation: As competitive advantage (δ), or cost reduction (  ) increases, the optimum bidding price in the first cycle declines Optimum Bid in the First Cycle Example Detailed Analysis Risk of NOT Making Profit Input  Cost  Learning effect  Relationship  Competitor’s estimated bid Output & Analysis  Optimum bid prices  Detailed analysis Process & Objective  Backward DP  Maximize total profit over number of years Model 2: Price CANNOT Increase in Year 2  Bid price in year 2 must be less than or equal to the first bid  Kuhn-Tucker (K-T) conditions are necessary and sufficient to find optimum bid prices Constrained Model vs. Unconstrained Model Strategy Table: Profit or Loss Region for the First Bidding Cycle Under the Pairs of Values for δ and   Supplier must consider subsequent bids when it bids, if there is linkage between contracts  Cost reduction and competitive advantage have impact on optimum bid  When cost reduces significantly, supplier may be willing to forego profit or lose money in first year to begin longer term relationship  As supplier considers the bidding problem over a longer time period, it can make more efficient decisions by increasing the probability of winning the bid increasing its annual average expected profit Conclusions YOUR TITLE Author 1, Author 2 Department of Industrial and System Engineering Wayne State University