Dr. Ron Lembke SCM 462. 1/16” How accurately can you measure? 1 mm = 1/25” 1/32”

Slides:



Advertisements
Similar presentations
Lean Manufacturing.
Advertisements

LEAN PRODUCTION Ron Lembke Operations Management.
LEAN PRODUCTION Ron Lembke Operations Management.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
JIT, TPS, and Lean Operations
Lean Operations (JIT) Module
Just-In-Time and Lean Systems
IENG 451 JIT. Production Physics Little’s Law Throughput = WIP/Cycle time For fixed capacity, cycle time and WIP or proportional – thus you can increase.
Continuous Improvement: The Lessons of History (or, There is nothing new under the sun) SCM 352 Dr. Ron Lembke.
Just-in-Time and Lean Systems
Lean Operations (JIT) Module
Operations Management Just-in-Time Systems Supplement 12
Just-In-Time Philosophy
Operations Management
Just-In-Time “Eliminate Waste”.
Operations Management
Customer Service in Pull Production Systems Mark L. SPEARMAN Presented By: Ahu SOYLU.
Kaizen: continuing improvement Dr. Ron Tibben-Lembke SCM 462.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Summary: Review of Lean Principles
Continuous Process Improvement: The Lessons of History SCM 494 Dr. Ron Tibben-Lembke.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Lean operations and JIT
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Just-in-Time (JIT) Manufacturing Slide Set #14.
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 8 Lean Systems McGraw-Hill/Irwin.
Chapter 7, Lean Thinking and Lean Systems
Just-In-Time Philosophy
Quick Changeovers & SMED
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Manufacturing.  Manufacturing is all about converting raw material into consumer or industrial products.  A firms manufacturing competency is based.
Just-In-Time & Lean Systems
Lean Basics Dewey Warden.
JIT – Just-In-Time Production
JIT and Lean Operations
Just-in-Time and Lean Systems
Continuous Process Improvement: The Lessons of History BADM 701 Dr. Ron Lembke.
Continuous Process Improvement: The Lessons of History BADM 701 Dr. Ron Lembke.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
Manufacturing Systems
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Lean Six Sigma: Process Improvement Tools and Techniques Donna C. Summers © 2011 Pearson Higher Education, Upper Saddle River, NJ All Rights Reserved.
Lean Production.
Operations Fall 2015 Bruce Duggan Providence University College.
Production and Operations Management: Manufacturing and Services
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
Teamwork Presentation on JUST IN TIME” METHOD World Wide Science, Online MBA Program 25 June 2011 Head of Group: Head of Group: Ahmad Shikeb Farazi Ahmad.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
“Japanese Manufacturing Techniques” & “Uprooting the Toyota Production System” PRESENTED BY: SLAVIK DEMIN & ALON SIMCHONI Based on the articles by xxxxxx.
A SEMINAR ON “LEAN MANUFACTURING”. What is Lean Manufacturing? Lean manufacturing is a comprehensive term referring to manufacturing methodologies based.
CHAPTER 9 Lean Manufacturing.
Chapter 12 Lean Production. Chapter 12 Lean Production.
Lean operations and JIT
IENG 451 / 452 Just In Time Processes: Cells, Stores, Kanban, Demand
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Operations Management
Just-In-Time and Lean Production
MENG 447 Manufacturing Systems Automation Chapter 1*
Industrial Engineering Department, Dokuz Eylul University, Turkey
Just-In-Time and Lean Production
Just In Time.
Visual Factory Three reasons for using visual management tools:
PRODUCTION AND OPERATIONS MANAGEMENT
LEAN PRODUCTION BY Alfredo Moran Johnny Rojas January, 2006.
Presentation transcript:

Dr. Ron Lembke SCM 462

1/16” How accurately can you measure? 1 mm = 1/25” 1/32”

Calipers 1/64” 0.05mm

Micrometer = 0.01mm Calipers

“Lord Chancellor” Micrometer Accurate to 1/10,000” Created when? 1805

Henry Maudslay “Powder monkey” at age 12, cabinet shop Joseph Brama’s (hydraulic press) lock shop Invented (or pioneered) slide rest lathe Standardized screws

Block making Machines for Marc Brunel, Used for 100 years Waited for “American System”

Beginning of Standards Before standardized parts, need Screws 1860s Machine Tool industry: Silicon Valley of its day All screws custom made by tool & die shops according to what they thought best William Sellers: 1864 “On a Uniform System of Screw Threads”

Sellers vs. Whitworth 3 cutters & 2 lathes vs. 1 cutter & 1 lathe Simple geometry vs. difficult Rounded top vs. straight: ease of manufacturing, ease of assembly

Not Just What you Know Machine tool makers didn’t want to be commoditized like gun makers The standard people expect to win usually does. Navy Board found it superior, asked Singer Sewing Machine, Baldwin Locomotive which would win (already adopted). Pennsylvania RR adopted (Sellers on the Board) British tanks & trucks couldn’t be repaired in WWII because Britain adopted Whitworth

Eiji Toyoda’s Ambitious Plans Post-WWII Japanese industry in ruins Early 1950s – toured Rouge plant 2,500 cars in 13 years. Ford: 8,000 per day “Catch up to Americans in 4 years!” Toyoda made delivery trucks and motorcycles, and not many of either

, the early years First two Toyotas imported to U.S. 1957

Elimination of Waste Knew they wouldn’t beat U.S. with product innovation, concentrated on licensing patents, and producing more efficiently Costs prevented mass-production, volume strategy of American firms. Find ways to reduce waste, cost Shigeo Shingo & Taiichi Ohno, pioneers

Ohno & Shingo

Couldn’t Emulate GM GM huge batches in huge factories Japan’s area is 10% less than California and 70% agricultural. Put entire population of CA into 30% of state, then add 6 times as many people. (and you thought LA was crowded). Land extremely expensive Sprawling factories not an option

Small Batches GM’s large batches require large amounts of storage space. GM produces in large batches because of significant setup costs. If Toyota had the same large setup costs, it could never afford small batches. Reduce setup cost to reduce batch size. GM didn’t think of doing this.

Two Pillars of Toyota System Just-in-Time: produce the right parts, at the right time, in the right quantity Autonomation: ‘Automation with a human touch’ (make machine mistake-proof)

Just-in-Time Downstream processes take parts from upstream as they need. Like an American Supermarket: Get what you want when you want it in the quantity you want.

Kanban Japanese for ‘signboard’ Method for implementing JIT In order to produce, you need both material to work on, and an available kanban. Each work station has a fixed # kanbans.

Kanban Worker 2 finishes a part, outbound moves over 2 has a blue tag avaliable, so 2 gets another part to work on: 2 takes off 1’s green tag giving it back to 1, and puts on her blue tag and moves it into position. Flow of work 3 2

Kanban When 3 finishes a part, Finished parts move over one spot He has to have a red tag available to put on, He gets a part from 2’s outbound pile, And gives the blue back to 2 Flow of work 3 2

Kanban When 3 finishes a part, Finished parts move over one spot He has to have a red tag available to put on, He gets a part from 2’s outbound pile, And gives the blue back to 2 3’s production will be taken by 4, offstage right. Tag goes back into 3’s bin Flow of work 3 2

Kanban Red finishes his part next. But 4 hasn’t freed up any of the red kanbans, so there is nothing for 3 to work on now. 3 could maintain his machine, or see if 4 needs help

How is this Different? Processes can become idled (blocked) or starved This makes you painfully aware of problems in your system. Material moves through the system so quickly no in- process recordkeeping is needed.

Total Quality Management Not a lot of parts to sift through to find a good one Can’t afford high defect rates Since low WIP, get quick feedback on errors

WIP Level Less WIP means products go through system faster reducing the WIP makes you more sensitive to problems, helps you find problems faster Stream and Rocks analogy: Inventory (WIP) is like water in a stream It hides the rocks Rocks force you to keep a lot of water (WIP) in the stream

Lowering Inventory Reduces Waste WIP hides problems

Lowering Inventory Reduces Waste WIP hides problems

Lowering Inventory Reduces Waste Reducing WIP makes problem very visible STOP

Lowering Inventory Reduces Waste Remove problem, run With less WIP

Lowering Inventory Reduces Waste Reduce WIP again to find new problems

Importance of Flow Ohno was very clear about this: “Kanban is a tool for realizing just-in-time. For this tool to work fairly well, the process must be managed to flow as much as possible. This is really the basic condition. Other important conditions are leveling the product as much as possible, and always working in accordance with standard work methods. -- Ohno, 1988, p. 3

Setup Reduction Can’t afford to do huge runs Have to produce in small batches Toyota Die Change: 3 hours down to 3 SMED: under ten minutes Techniques Make internal setups into External Eliminate Adjustments Eliminate the Setup Continuous Process Improvement, anyone?

Lot Sizing

Takt time = available time (day) / Customer demand rate per day

Uniform Plant Loading (heijunka) Any changes to final assembly are magnified throughout production process Smoothing Master production schedule: 10,000 /mo. 500 day, 250 a shift 480 minutes means 1 every 1.92 minutes Sequencing: If mix is 50% A, 25% B, 25% C, produce A-B-A-C-A-B-A-C…