Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.

Slides:



Advertisements
Similar presentations
Lean Six Sigma Green Belt Training
Advertisements

Lean Six Sigma Project Presentation Template
Project leaders will keep track of team progress using an A3 Report.
Is Feature Critical to Product Performance OR Responsive to Variation? Develop Complete List Screening Study Varying Machine / Material Designate as Key.
Six Sigma Quality Engineering
Overview: Plan-Do-Check-Act Cycle.
Dr. Ron Lembke SCM 462.  “It is the relentless and rigorous pursuit of the reduction of variation in all critical processes to achieve continuous and.
Project Storyboard Template
Principles of Six Sigma
Roberto lopez LSSMBB DMAIC project template.
1 Chapter 3 Project Organization, Selection, and Definition.
Six Sigma Dr. Ron Tibben-Lembke SCM 462 Dr. Ron Tibben-Lembke SCM 462.
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
1 Chapter 10 Principles of Six Sigma. Key Idea Although we view quality improvement tools and techniques from the perspective of Six Sigma, it is important.
Tech 50800: Champion/Define Presentation Summary of project  Sycamore companies are collecting information on cars from three different locations to.
Overview of Lean Six Sigma
6  Methodology: DMAIC Robert Setaputra. PDCA / PDSA PDCA / PDSA is a continuous quality improvement tool. PDCA is introduced by Shewhart. PDSA is Deming’s.
Barry Murash MBBit Nortel 2007
Define Measure Analyze Improve Control 1 Project Title BB Candidate Name Define.
Overview of DMAIC A Systematic Framework for Problem Solving
MOHAMAD SHARIF B ISHAK B
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 10 Principles of Six Sigma.
METODOLOGI SIX SIGMA PERTEMUAN 12 IMPROVE PHASE OLEH: EMELIA SARI.
“Safety is a Measure of Success”
Process Management Process improvement (for Chronic problems) Process control (for Sporadic problems)
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
CS532 Term Paper Applying Six Sigma Methodology In Software Engineering Sourabh Bandyopadhyay.
 Name  Work experience  Background in continuous improvement activities  Expectations 1.
Designing, Controlling, and Improving Organizational Processes
Define Tollgate Checklist
Problem Solving.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Quality and Productivity Management Deming, TQM, and 6 Sigma.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
Project Storyboard (Page 1 of 2)
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
Confidential, , MBX Template Book Confidential, ,
Problem Solving Skills
Traditional Economic Model of Quality of Conformance
Root Cause Analysis Analyze Kaizen Facilitation. Objectives Learn and be able to apply a fishbone diagram Utilize “Why” analysis technique to uncover.
Green Belt – SIX SIGMA OPERATIONAL Intro to Analyze Phase.
THE MANAGEMENT & CONTROL OF QUALITY, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 10 Principles of Six Sigma The Management & Control of Quality,
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
8.1 Plan Quality Management
Product Lifecycle Management
TM 720: Statistical Process Control DMAIC Problem Solving

The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
Six-Sigma : DMAIC Cycle & Application
DMAIC Project Template
OPS/571 Operations Management
Quality Management Six Sigma
Framework for Success: DMAIC
DMAIC Analyze, Improve, Control
Version: Date: Project title Give your project a title that makes it easy to understand what the purpose is with the project Sponsor/Champion: Black Belt:
Project Champion: Process Owner: Organization: Project Location:
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
The 7 Basic Quality Tools ~ The DMAIC Process
DMAIC STANDARD WORK TEMPLATE
Measure Phase Wrap Up and Action Items
Lean-Green belt six sigma program
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Dr. Ron Lembke SCM 462

 Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit to strategy and competitive advantage

 Conformance Projects  Unstructured Performance Projects  Problems because system poorly specified  Efficiency Projects  Acceptable products, not meeting internal goals  Product Design  Not meeting customer CTQ  Process design

 Define  Measure  Analyze  Improve  Control  (Alternate meaning: Dumb Managers Always Ignore Customers)

 Charter / rationale for the project  Why this, not others, need for project, costs, benefits  Developing a project charter (statement of the project)  Scoping:  Improve motor reliability  Most problems from brush wear  Problem with brush hardness  Reduce variability of brush hardness

 Gather voice of the customer data to identify critical-to-quality (CTQ) characteristics important to customers  Select performance metrics  What are current levels  Expected improvements  What will need to be done, by whom

 SIPOC Understand the relationships between  Suppliers  Inputs  Process  Outputs  Customers

 Develop operational definitions for each CTQ characteristic  Figure out how to measure internal processes affecting each CTQ, KPOV (Key process output variables), KPIV (Input Vars)  Y = F(x)  Figure out what data we need to collect  Easy to collect correctly  Interrupt process as little as possible  Collectors understand why collecting  “gage study” to determine the validity (repeatability and reproducibility) of the measurement procedure for each CTQ  Baseline data  Collect baseline capabilities for each CTQ  Determine the process capability for each CTQ

 Consider all possibilities  Be clear – no guessing, training?  You might have forgotten some  Might need to revise – some cover too many things  Learn about different cases

 3. Collect the data  5. Tabulate the data – Do as %, if you want to  (6. Put each problem into dollars of cost, most complaints, lost employee minutes, etc.)  8. Sort biggest to smallest, graph.  Analyze – p. 87 – what would you fix?

 Further study of major categories  Grouping together smaller ones  Look for common causes

 Understand why defects and variation occur  Find the root causes  5W = 1H  Identify key causes  Experiments to verify impact  Formulate hypothesis, collect data

 Does the process work the way we think it does?  Identify upstream variables (x’s) for each CTQ  Process mapping  Operationally define each x  Collect baseline data for each x  Perform studies to determine the validity (repeatability and reproducibility) of the measurement process for each x  Establish baseline capabilities for each x  Understand the effect of each x on each CTQ

 Brainstorm ideas of potential root causes– everyone participates  Generate ideas about potential root causes  Understanding the process, not solving the problem yet

 Ishikawa, Fishbone  Puts things in an organized way  Separate things into manageable parts (like KJ in that way)  Methods, Materials, Machines, People, Environment, Information  Create the diagram  Analyze the diagram – look for cost effective solutions!

 Ask “why” 5 times, or as many as it takes  List of next steps, things to investigate

 Scatter plots - Look for trends  Run charts – same thing  DJIA = Financial Performance?

 Determine optimal levels of critical x’s to optimize the spread, shape and center of the CTQ’s  Action plans to implement the optimal level of the x’s  Conduct pilot test of the revised process

 Force Field!

 For and against  Action items for each  Strength of each

 Risk abatement planning and mistake-proofing to avoid potential problems with the revised settings of the x’s  Standardize successful process revisions in training manuals  Control revised settings of the critical x’s  Turn revised process over to the process owner for continuous improvement using the PDSA cycle

 Tell everyone what you did, so they can learn from it

 Questions 3, 4, 6, 7, 10, 16