MSSC 2011 Annual Salinity Summit Charles Ahrens Vice President / Water Resources and Conservation Challenges in Brackish Groundwater Desalination Project.

Slides:



Advertisements
Similar presentations
The State of Brackish Groundwater Desalination in Texas Jorge A. Arroyo P.E. Innovative Water Technologies.
Advertisements

US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
ppt Tularosa Basin National Desalination Research Center Feasibility Study Presented by Mike Hightower, Sandia National Laboratories Tom Jennings,
Treatment of Waste Brine from a Brackish Reverse Osmosis Plant
The Energy – Water Nexus : UT School of Law. Brackish vs Seawater.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Brackish Groundwater Desalination in Texas J. Kevin Ward.
Water for Texas 2012 State Water Plan. Water Planning: Legislative Response to Drought  Late 1950s Drought of Record – 1957: Creation of TWDB – $200.
Mike Hightower, Sandia National Laboratories Tom Jennings, Bureau of Reclamation New Mexico Water Research Symposium August 13, 2002 Feasibility Study.
DESALINATION How Critical Is It for the State to Develop Seawater Desalination Supplies? BILL WEST GBRA, General Manager 1.
Exploring Regional Desalination as a Water Supply Option in the Bay Area The Who, What, When, Where, Why and How of Regional Water Supply Planning May.
The Implementation of Desalination Projects in Arizona: Policies, Institutions & Regulations Multi-State Salinity Coalition February 17, 2011 Chuck Cullom.
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
Jorge A Arroyo P.E. (For Robert Mace) Texas Water Development Board Presenting to Texas Water Conservation Association 66 th Annual Convention Dallas
Presented by: Kevin J. Spencer, P.G. R.W. Harden and Associates, Inc. Benefits and Challenges of Developing Brackish Groundwater Supplies WATER Supply.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
M. Karl Wood Mike Hightower New Mexico Water Sandia National Resources Research Laboratory Institute The New Tularosa National Desalination Research Facility:
2 1)Familiarize State agency staff with Water Plan Update 2013 information, tools and resources 2)Identify opportunities for State agencies to derive.
Water Planning in the Western U.S. Impacts and Opportunities for Investor-Owned Water Utilities Jeffrey Stuck, Environmental Management Director American.
American Society of Farm Managers & Rural Appraisers Kevin Morrison, P.G. Project Coordinator – Desalination Engineering Brackish Groundwater Desalination.
1 South Orange Coastal Ocean Desalination (SOCOD) Project, Ocean Desalination Costs and Recent Public Opinions November 2011 Status Update Karl Seckel,
Seawater Desalination and Water Supply Reliability in Marin County Louis Armstrong, URS Corporation.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Newark Desalination Facility
Val S. Frenkel, Ph.D., P.E., D.WRE.
Water for Monterey County Regional Project Capital and O&M Cost Description 1 Lyndel Melton, P.E. RMC Water and Environment.
Using ASR as a Component of Managing Water Supply & Growth, City of Dallas, OR Using ASR as a Component of Managing Water Supply & Growth, City of Dallas,
Brackish Groundwater Desalination March 21, 2014 Robert Puente President/Chief Executive Officer 2014 Texas Environmental Law Journal Symposium on The.
The State of Seawater Desalination in Texas Jorge A. Arroyo P.E. Innovative Water Technologies.
What are the data gaps for developing brackish groundwater desalination resources in Texas? Bill Hutchison, Ph.D., P.E., P.G. Director, Groundwater Resources.
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
TWCA 2009 Mid-Year Conference Groundwater Regulation Panel.
Edwards Aquifer Recovery Implementation Program – Impact to San Antonio October 3, 2011 Green Industry Alliance.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
Copyright 2010 STWR L.P. by Rodney T. Smith President, Southwest Texas Water Resources, L.P. Edwards Aquifer Recovery Implementation Program Stakeholders.
Texas Water Development Board Financing Programs Presentation by Ignacio Madera, Jr. Office of Project Finance & Construction Assistance December 2, 2003.
Texas Innovative Water 2010 Kevin Morrison, P.G. Project Coordinator / Water Resources What has SAWS Learned about Concentrate Disposal Options for Inland.
Los Angeles Department of Water and Power Seawater Desalination Update by: Alvin Bautista, P.E. October 2007.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Considerations for Brackish Groundwater Use as a Water Supply for Small Water Systems and Municipalities Eddie C. Livingston, MSCE, P.E. Livingston Associates,
Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?
Potable Reuse: A New Water Resource for the Central Coast Water Breakout Session – 2015 Central Coast Sustainability Summit James Hawkins, Heal the Ocean.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
MSSC 2011 Annual Salinity Summit February 17 – 18, 2011 Thirty Years of Success in Implementing Desalination By Roger K. Noack, P.E. HDR Engineering, Inc.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Water Advisory Board March 29, Annual rainfall
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Please, Pass the Salt: Can the Oil Industry Benefit from Desalination Wastes? TIPRO Mid-Winter Policy Meeting Fort Worth, Texas January 13, 2004 Jean-Philippe.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
AquaSel Brine Concentration Pilot Project Update
THINGS TO KEEP IN MIND WHILE SELECTING A SITE FOR DESALINATION.
San Antonio Water System - SAWS
Regulation and Development in the Edwards Aquifer Zone
Recycled Water Project – Sharon Heights GCC
WATER for TEXAS Water for the Future
Sam Aminfard CATEE 2017 – Texas Energy Summit November 15, 2017
Importance of Flood-irrigation to Continental Bird Populations
Managing Groundwater in Far West Texas with Local Control
San Diego Water Resources
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
California Water Commission
Claude “Bud” Lewis Desalination Plant
Presentation transcript:

MSSC 2011 Annual Salinity Summit Charles Ahrens Vice President / Water Resources and Conservation Challenges in Brackish Groundwater Desalination Project Development February 17, 2011

Challenges in Brackish Groundwater Desalination Project Development Page 2 Presentation Outline Why Brackish Desalination? Project Location Project Components Project Challenges Next Steps Lessons Learned Summary

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 3 Why Brackish Desalination? Governor’s 2002 Desalination Initiative Resource close to San Antonio Un-utilized resource Diversification SAWS Brackish Test Site 1

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 4 Project Location Located on Aquifer Storage & Recovery property 11,800 acre-feet (Phase 1) Potential to expand to 25,000 acre-feet 45-mile Integration Pipeline will deliver water to south and west, may be built in phases

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 5 Project Components Production / Monitor Wells Reverse Osmosis Treatment Plant Pipeline System Brine Injection Wells Electrical System

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 6 Project Challenges Groundwater District Regulation State Water Management Concentrate Disposal Real Estate Public Perception Funding SAWS Membrane Pilot Test Unit

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 7 Project Challenges Groundwater District Regulation State Water Management Region L Plan Groundwater Management Areas

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 8 Project Challenges Concentrate Disposal SAWS Disposal Options –Surface Water –Deep Well Injection Permitting –General Permit

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 9 Project Challenges Public Perception Citizen’s Advisory Panel Project Opposition Response to Opposition –Science Committee –Project starts in Bexar County –Construct Monitor Wells –Continued information to political leadership in Bexar County and surrounding Counties

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 10 Project Challenges Funding – Water Resources CIP Budget

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 11 Project Challenges Other Funding Sources TWDB Water Infrastructure Funds –$35 Million – low interest deferred loans for Planning and Design –$24 Million – low interest loans for Construction Federal Funds – Bureau of Reclamation

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 12 Next Steps Additional Pilot Testing (2011) Drill Test Injection Well (2011) Engage Program Manager (early 2012) Engage Construction Manager at Risk (late 2012)

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 13 Lessons Learned Inform political leadership early (preferably before feasibility work) Never underestimate project opposition Start land acquisition early Determine water quality early Pilot membranes early Refine concentrate disposal options early

February 17, 2011 Challenges in Brackish Groundwater Desalination Project Development Page 14 Summary 279,000 AF 222,000 AF Project Benefits –Diversification - project relieves pressure on the Edwards Aquifer – Additional use of previously purchased System property –“State-of-the-Art” Treatment – Phase 1 supplies approximately 5% of SAWS water needs 2020 – Worst Year of DOR 253,000 AF 151,000 AF Edwards 102,000 AF Non-Edwards Note: Excludes Recycle Water

MSSC 2011 Annual Salinity Summit Charles Ahrens Vice President / Water Resources and Conservation Challenges in Brackish Groundwater Desalination Project Development February 17, 2011