ESTB Test Beam Procedures User Support Operations Schedules Carsten Hast March 17 th 2011.

Slides:



Advertisements
Similar presentations
Substantive Change Requesting Commission Approval of Substantive Changes at Institutions MSCHE Annual Meeting December 2009.
Advertisements

L-Band Test Stands in ESB Carsten Hast Test Facilities Department Helps to develop and test near-term solutions for accelerator systems including RF structures.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
Test Beams Around the World (well, a very small world…) CERN (transparencies from Horst Breuker from CERN AIDA meeting) DESY (transparencies from Norbert.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 17, 2011.
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
FACET Safety and Procedures Christine Clarke August 29 th 2011.
LCLS Beam Parameters, Status and Run Schedule Rick Iverson for the LCLS team 1 R. Iverson ESTB Workshop SLAC, March 2011.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Safety Oversight for SLAC Accelerator Department Operations
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
The CU Beam Test at CERN Status Report and highlights from workshop II Luca Latronico LAT C&A Meeting May
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
© 2008 Brigham Young University–Idaho 1 Controllers Group Meeting October 31, 2013.
LCLS NEH Operational and User Safety Programs
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
© 2008 Brigham Young University–Idaho 1 Controllers Group Meeting November 11, 2010.
LST Storage and Testing at SLAC in the SLD Hall Available space Available Infrastructure Needed Infrastructure Time Line People Money Carsten Hast (SLAC)
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
Recommissioning SLAC’s LINAC West for FACET Peter Schuh, August 9, 2012 Workshop on Accelerator Operations 2012.
ATF2 Accelerator Status and Plans for JFY 2014 runs N. Terunuma, KEK.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
SLAC End Station A Test Beam ESTB Carsten Hast SLAC National Accelerator Laboratory ALCPG11 Eugene, Oregon March 22 nd, 2011.
F ERMILAB T EST B EAM F ACILITY Aria Soha March 22, 2011.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
AboutFACET What is FACET Current Research PUBLICATIONS NAVIGATE UP Dielectric Wakefields.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
End Station A Test Beam Facility ESTB Carsten Hast SiD Workshop SLAC, January 16-18, 2013,
Proton Driver – Target Station Interfaces Keith Gollwitzer Fermilab Wednesday May 28, 2014 MAP 2014 Spring Meeting.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
USA applications. Different types of application Regular decision This is the most common Rolling admissions – on-going submissions and decisions (usually.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Complementary ISTC Projects #3888, 3889p
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Kenneth Wraight, Andrew Blue, Kate Doonan & Sam Crawley
Magdalena Kowalska, CERN PH-SME-IS
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
End Station Test Beam (ESTB) at SLAC
J. Seeman Assistant Director for PPA/LCLS
SLAC Beam Test Facilities Overview (emphasis ESTB) Carsten Hast, SLAC
Electron Beam Systems ETC and Methodology
Status Report and highlights from workshop II
Polarized 3He target installation
Presentation transcript:

ESTB Test Beam Procedures User Support Operations Schedules Carsten Hast March 17 th 2011

2 Test Beam Request Approval We have not yet worked out how the approval process for test beam requests will work In the past that was done rather informally for short beam time requests (1 to 2 weeks) –Write a short but comprehensive proposal (2-5 pages or so) –Ad hoc SLAC internal review –Organization was left largely in the hand of the Experimental Facilities Department (EFD)  This workshop is supposed to show how much demand for what type of beams there is and how formal we have to organize ESTB operations –My guess is that the future procedure will be similar to the old one C.Hast, ESTB Workshop SLAC, March 2011

ARD Test Facilities Department 3 C.Hast, ESTB Workshop SLAC, March 2011

After Your Proposal is Accepted Any experimental setup needs review and approval to be installed and operated at SLAC –Safety Oversight Committee (SOC) Looks at experimental equipment and will request Safety Officers and others to review your setup –TF will be instrumental in getting the necessary approvals for you We know how the system works We are part of the system We can do many things for you – If you tell us what you want to do This process can be quite fast for “normal” setups But if you need “more exotic” components (e.g. hazardous gases) will take more time –Electrical components need to be UL listed (or equivalent) That’s a tough one, because many devices you are using in your home institutes are not! A European “CE” is not good enough at SLAC SLAC has an inspection process to approve non listed devices –TF can do that –We will only allow the operation of approved devices –Radioactive sources need to be registered with RP prior their arrival 4 C.Hast, ESTB Workshop SLAC, March 2011

Becoming a User Users will register with the SLAC Users Organization –SLUO –SLUO will work with the PI on a generic MoU between Stanford University and your home institution (mainly about intellectual property rights…) –Each individual user needs to agree to that MoU –SLUO will get users a SLAC systems ID and a computer account A SLAC Contact will be assigned to each experiment and user –This SLAC Contact functions as your supervisor here at SLAC –Mauro Pivi is the man of the hour for ESTB SLAC Contact defines the training requirements –Most training can be done remotely via web training (after you have a SLAC system ID) –Couple of things on first day of arrival We will setup a web page which will lay out what you need to do and when 5 C.Hast, ESTB Workshop SLAC, March 2011

SLAC Your experimental setup should arrive as “ready to go” as possible Test Facilities Department will help you installing your experiment –Vacuum work –Crane operation –Small modifications –Hook up of gases, water cooling, electricity, etc. Alignment group is available on short notice  All above covered in ESTB operations budget Basic DAQ will provide beam parameters on a per shot basis You provide the DAQ for your setup If you need things which don’t exist yet (special gases, cables, lasers, DAQ, etc.) we need time (and money) to provide these Contact us early and we will talk 6 C.Hast, ESTB Workshop SLAC, March 2011

Preparation of Your Setup ESA Counting House and other locations in the Research Yard have some space for experimental setup –You can assemble your experiment and test DAQ –Limited hardware modifications possible –hand tools, drill press, soldering iron, etc. are available  ESA is meant for beam operation so we will try to minimize the idle time during allocated beam time Access to ESA is time consuming In-and-out >30 minutes Securing the beam for access needs 10+ minutes (each way) 73 stairs from Counting House to ESA  free “fitness program”  Good preparation is key for efficient operation 7 C.Hast, ESTB Workshop SLAC, March 2011

Operations of ESTB ESTB is mainly operated from ESA-Counting House, with visits to MCC and in some cases operated from MCC Basic operation –Beam energy and bunch charge is defined by LCLS –LCLS experiments runs for 5 days from Thursday morning to Tuesday morning Time might be split between a day and night time LCLS experiment (change of beam parameters likely) –Linac maintenance on Wednesday day (ROD)  no beam to ESA –5Hz of LCLS beam to ESA 24/7 (see caveats above) –Automatic rate increase if LCLS experiments don’t need full rate or have short access We will try to stage multiple experiments in ESA to run simultaneously For example: Silicon first followed by some calorimeter  DAQ should be flexible to cope with changes Our DAQ will give you a trigger signal Automatically take advantage of higher beam rates Beam energies might change If parameters become unacceptable for your experiment  turn BSY kickers off 8 C.Hast, ESTB Workshop SLAC, March 2011

Operations of ESTB II Example 1 –Your program asks for single electrons between 4 and 14GeV –LCLS experiment is scheduled to run at 14GeV –BSY kickers will kick beam onto target  electrons max energy 14GeV –Now you work with MCC to set the A-line as spectrometer to desired particle energy –LCLS changes to 10GeV unexpectedly –Either you monitor in person and work with MCC to reset the A-line to a new lower energy and as soon as LCLS goes up again resets the A-line to a higher energy again –Or we manage to do that (semi) automatically –Or we stop running and turn BSY kickers off Example 2 –Your program asks for full beam at 14GeV –LCLS is scheduled to run at 14GeV –Set BSY kickers and A-line to 14GeV –Beam becomes unstable: Work with MCC operators –LCLS changes to 10GeV unexpectedly  turn BSY kickers off 9 C.Hast, ESTB Workshop SLAC, March 2011

Schedule This Down Time (now to mid May) –We install one BSY kicker with a stainless steel vacuum chamber End of May LCLS starts up and runs until Christmas (one week off in October) Mid of June FACET runs until August Mid of July ESTB can do first test of kicking a 4GeV beam into A-line ESA PPS becomes available this summer –4GeV primary beam to ESA –4-14GeV secondary electron beam to ESA Commissioning of ESA infrastructure September/October Oct 25 th – Nov 1 st install 4 BSY kicker magnets with ceramic chambers First ESTB run in November and December (need commissioning time) Linac off from Christmas to end of January ESTB running resumes February 2012 SLAC downtimes are in Aug/Sept and over Christmas for the next years 10 C.Hast, ESTB Workshop SLAC, March 2011

Summary After this workshop we will develop formal procedures of how to apply for and to distribute beam time Test Facilities is your one stop shopping for support at SLAC –TF will assist with equipment installation and the coordination with other services needed (rigging, vacuum, alignment, etc.) –Special requests (DAQ, hardware, gas, laser) will need time to be implemented –Careful planning ahead will be a key ingredient to make you experiment a success Users will have a SLAC Contact who will be responsible for their training assessment and work authorization and work release Users will be responsible to only do what they have been trained, authorized and released to do LCLS defines the beam parameters! –Your measurement program, and yours and our infrastructure need to be flexible to make the maximal use of the available beams We are excited to get ESA back up again for beam operation though there is still quite a bit of work to do and Test Facilities Department is stretched thin this summer working on FACET, NLCTA and ESTB at the same time 11 C.Hast, ESTB Workshop SLAC, March 2011