More questions than you can shake a stick at The Maze of Building or Buying an ERA System.

Slides:



Advertisements
Similar presentations
Integrated Healthcare Management system. Standards based design. [ Supports HXP (Health Exchange Protocol) a standard in exchanging health care data ]
Advertisements

COMPUTER NETWORK TOPOLOGIES
The Lucernex Cloud: A software-as-a-service solution delivered via the Cloud What is the Cloud? Cloud Computing is the future of all software applications,
IT Issues and Support Structures Simulation Education and Complex Technology Based Practice.
Take your CMS to the cloud to lighten the load Brett Pollak Campus Web Office UC San Diego.
Group members: Nicola McLeod Natalia Mullings
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall 1 Managing Information Technology 6 th Edition CHAPTER 11 METHODOLOGIES FOR PURCHASED.
Client/Server Computing Ajay Kumar Shrivastava. Network Operating System (NOS) It manages the services of the server It exists at the session and presentation.
Bringing Technology to the Rural Hospital Rural Telecon ‘07 October 17, 2007.
© Prentice Hall CHAPTER 1 Managing IT in an E-World.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Health Informatics Series
7.2 System Development Life Cycle (SDLC)
8 Systems Analysis and Design in a Changing World, Fifth Edition.
VENDORS, CONSULTANTS AND USERS
ZHRC/HTI Financial Management Training
Be able to plan e-commerce strategies. Hosting When setting up an e-commerce site, there are two issues of hosting which need to be decided - who will.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
Grants.gov – What to Expect Presented by the Office for Research Cindy Hope, Director Office for Sponsored Programs.
NANCY ABBOTT CANR GRANTS DEVELOPMENT OFFICER [GDO] CANR Sponsored Project Proposal Process.
User Services. Services Desktop Support Technical Support Help Desk User Services Customer Relationship Management.
1 Virtual Assistance The Future of Business. 2 What is a VA? Virtual Assistants are entrepreneurs who are skilled and dedicated administrative professionals.
Chapter 2: Introduction to Computer User Support
Chapter 9 Database Planning, Design, and Administration Sungchul Hong.
Organizing Information Technology Resources
1 Management of IS How do business organize themselves to manage IS and IT activities? –Depends upon the type of technology –Depends upon the size of the.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
“ Technology Working For People” Intro to HIPAA and Small Practice Implementation.
Information Technology
Server is ‘host’ Clients do not communicate with each other.
CLIENT SERVER VS PEER TO PEER Networks. Lesson objectives Candidates should understand the advantages and disadvantages of: client server networks peer.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
SCSC 311 Information Systems: hardware and software.
Advantages Cloud Computing. customers only pay for the access and interfaces that they need. The customer buys only the services they need Cost Advantages.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
ERP. What is ERP?  ERP stands for: Enterprise Resource Planning systems  This is what it does: attempts to integrate all data and processes of an organization.
Chapter 2: Introduction to Computer User Support.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
(c) 2005 Donald R. Frey & Company Inc. InternetInquiryandPaymentProcessingModule Presented By: Matt Frey.
Top Issues Facing Information Technology at UAB Sheila M. Sanders UAB Vice President Information Technology February 8, 2007.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Accounting Information System By Rizwan Waheed M.Com 710.
Going Paperless Research Administration Office, Los Angeles Biomedical Research Institute (LABioMed), California Ludmila B. Budilo Sr. Grants & Contracts.
VENDORS, CONSULTANTS AND USERS. WHY CAN’T COMPANIES DEVELOP THEIR OWN ERP PACKAGES? To develop an ERP package is a complex & time consuming activity which.
Office of Sponsored Projects & Industry Partnerships eSRA Electronic Sponsored Research Administration Jeff Weiner Office of Sponsored Projects & Industry.
Unit 22 People in Computing
ORGANIZING IT SERVICES AND PERSONNEL (PART 1) Lecture 7.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Chapter 11: Alternative Approach - Purchasing Systems.
Starting a Waste Reduction Technical Assistance Center John Calcagni Waste Reduction Resource Center Cleaner Production Seminar Huangshan, Anhui Province.
Creating and Delivering Web-based Courses WebNet World Conference 2000 Technology support for the development and maintenance of on-line web based courses.
The UW-Madison IAM Experience Building our Dream Home Presented by Steve Devoti, Senior IT Architect © 2007 Board of Regents of the University of Wisconsin.
+ Publishing Your First Post USING WORDPRESS. + A CMS (content management system) is an application that allows you to publish, edit, modify, organize,
+ Lec#1: Planning, Designing, and Operating Local Area Networks 1 st semester CT.
What Project Managers Need to Know About Cloud Computing Stacy Taylor President, Red Mountain Services
Are you looking for an opportunity to join a company that has a long history and an exciting future? A place where you can grow within an international.
An Introduction to Local Area Networks An Overview of Peer-to-Peer and Server-Based Models.
Computer Technology: Your Need to Know Chapter 1 Slide 1.
Setting Up a Project for Success:
Presenter: Igna Visser Date: Wednesday, 18 March 2015
Chapter 1 Computer Technology: Your Need to Know
The Marshall University Experience with Implementing Project Server 2003 August 9, 2005 Presented by: Chuck Elliott, M.S. Associate Director, Customer.
Systems Analysis – ITEC 3155 Evaluating Alternatives for Requirements, Environment, and Implementation.
Enterprise Content Management Owners Representative Contract Approval
2 Selecting a Healthcare Information System.
TRD IVR\ Voice Portal Phase 1 PROJECT CLOSE 12/21/ /17/2018.
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
PLANNING A SECURE BASELINE INSTALLATION
Preparing for the Windows 8.1 MCSA
Presentation transcript:

More questions than you can shake a stick at The Maze of Building or Buying an ERA System

Defining the problem Computers and networks are now used to store, transmit and manage proposals and grants (duh!). The total number of problems involved in using computers for the above purpose has increased, not decreased. Computer applications and hardware require increasingly educated specialists to create, install and maintain them.

Where are we headed? Pre Award  Proposal Clearance – Electronic Routing  Grants.gov System – to – System Adobe Acrobat  Other funding sources Post Award  Increased frequency and severity of audits Both Sides  Management and reporting

Let’s build a system! Let’s buy a system! Do we build or do we buy? Do we buy or do we build?

You will appear to be a visionary if you build in one era and buy in the next We have to buy Five Years Later We have to build

Where is the mandate coming from? From above ?  Concern with institutional performance  Directly linked to funding and FTE changes From your SRO staff?  Are you churning thru staff?  Overworked & concerned about web based systems? From your PI’s  Do they perceive problems with your Pre or Post Award activities? From your Grant Administrators?  Do your departments have sufficient staff with access to the information they need to manage proposals and awards? From your Business Office?  Are there problems getting contracts signed? Purchases made? Payments executed?

1 st : Analysis What do we do? Roles we play Proposal Preparation? Reporting? Auditing? How do we currently get technical support? How are we handling things now? What is our institutional culture? Pre-Award, Post-Award, Both?

2 nd: Options & Constraints Build or Buy BuildBothBuy How am I handling it now? What’s my volume?  How many proposals, how many awards, what else? Start over or enhance an existing system  Who should help me answer this question?

3 rd: Technical Support Support Home Grown External IT Professional Dept IT Professional End User Computer Support Network Support Application Support Computing Dept Vendor Contractor Training

4 th: Something to move the electrons about Hardware WorkstationsComputing Center Servers Dept Based Servers Vender Based Servers Where will the information be hosted? How will it be accessed? Who is responsible for it’s integrity?

Support Home Grown External IT Professional Department IT Professional Our Decision Trees Hardware Workstations Computing Center Servers Dept Based Servers Vender Based Servers Product PurchasedDevelopedBoth 2 3 4

Support (1/3) Home Grown  Advantages Person knows your business Personal familiarity  Disadvantages Person may not have skills to develop complex system Multi-tasking will dilute effort

Support (2/3) Department IT Professional  Wildcard The candidate you hire may not be the person who winds up working for you  Advantages Depending on the skill level requested, person may have sufficient skills to plan, design and implement systems New thoughts, new perspective  Disadvantages Does not know your business or language Break in period May want an occasional holiday, vacation or sick leave; requires occasional care and feeding

Support (3/3) Institutional Support  Dedicated or shared  Staff or students Independent Contract  Network Management  Application Design Vendor Support  Hardware and network support for their applications

Support – What should you expect? Phase One: Design a web based proposal preparation, submission and award management system. Time: 6 minutes

Support – Questions to look at What do you need done?  Network Management Server (web/ /database) administrator Workstation setup and maintenance, user assistance  Application Development Start fresh Integrate or expand existing systems Maintain a purchased vendor system  Both Evaluate the communication skills of the people you are considering. Can you understand them? Can they understand you?

Support – Questions to look at Based on the duties you expect to be performed, what level of education, expertise and skills do you require? How much should you pay? How many positions do we need? Resources for assistance:  Your institution’s computing department  Other local businesses that employ IT professionals

Hardware - Where will your information be hosted? What methods of access to your information are required?  Web  Desktop  Paper Reports  Do you need secure access? Who will be responsible for the integrity of the data?  And yes, you do have to anticipate having computer problems

Hardware Options Low cost ($$$ - $1,$$$) Low volume access LAN access at best, Uploading to sponsor web servers easily Easy access to raw data in different formats Moderate Cost ($3-4,$$$) IT Personnel STRONGLY recommended Moderate traffic, web is a reality Moderately easy access to (read only) raw data High cost, but it may be ‘funny money’ ($$,$$$) Lack of control, service issues High volume access Difficult to modify Can you get access to the raw data so you can run your own reports or use spreadsheets to analyze? Moderate to High Cost ($$,$$$ - $$$,$$$) High volume access Modifications may be worse than tooth extraction without anesthesia* Can you get access to the raw data so you can run your own reports or use spreadsheets to analyze? Workstations Computing Dept Servers Dept Based Servers Vender Based Solutions

Build, Buy or Both? NCURA has been presenting a build or buy experience session at conferences for more than the last decade  The sessions feature either an institution that built, or one that bought. Some featured vendors, others developers  Boxing gloves were optional

Build, Buy or Both? There is no one right answer  Neither is cheap Build – continuous expense Buy – high upfront, somewhat lower ongoing  If Buying Solicit advice from those who have purchased before Include Grants.gov S-2-S modifications in your contract How close is the vendors solution to the way you do business today or are you willing to change your way of doing business to accommodate the software? Gap Analysis – Can the system be modified to your method of business?  If Building Are you patient and prepared to make mistakes? Get a long term vision together before starting  Both? If you have a developer, consider buying the framework of a system with the source code, then modify it for your institution

Ever Changing Grants.gov Three Two Options  PureEdge (phased out)  Adobe Acrobat (now supports V10 & X)  System to System Vendor System  Requires $$$,$$$ up front and $$,$$$ maintenance  May requires IT support for maintenance and customizations Home Grown System  Requires Application Developers, SRO Time + $$$,$$$  Grants.gov publishes assistance on web site