Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009.

Slides:



Advertisements
Similar presentations
F AST T RACK REMOTE SWITCH WIRING SET UP FOR THE LIGHT BoardPlug Power strips relay Wiring Harness.
Advertisements

Utilizing IED Capability to Reduce Wiring Terrence Smith, GE Digital Energy Multilin Richard Hunt, GE Digital Energy Multilin Jakov Vico, GE Digital Energy.
MICE Target Report Video Conference 15/03/07 Chris Booth Sheffield 15 th March 2007.
MICE Target Electronics, DAQ and BPS MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
The MICE target and the ISIS BPS system By Edward Overton 1.
MICE TARGET HARDWARE C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 - The MICE Experiment.
MICE Electronics Upgrade P J Smith (University of Sheffield) J Leaver (Imperial College) 17 th June 2009.
MICE Target Electronics & DAQ Update P J Smith University of Sheffield 2 nd December 2009.
MICE Electronics & DAQ P J Smith University of Sheffield.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Extra Control Electronics? Chris Booth Sheffield 27 th November 2008.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
MICE Target Status Chris Booth Sheffield 10 th May 2006.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
 Target K. Long, 23 August 2009 Sunday 23Aug09 Water and power connections made Test water, check power Will plan soak test.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Electronic Component Functions What is this component doing my in electronic device?
12/09/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
1 MICE-Video Conference Status of MICE Hall Contents: General status Electrical Mechanical Preparing for Steps II & III Risks and worries Andy Nichols,
VOLTAGE AND READING A VOLTMETER. VOLTAGE AND READING A VOLTMETER VOLTAGE: (VOLTS) = V: A MEASURE OF THE FORCE OR PRESSURE THAT PUSHES ELECTRONS THROUGH.
Control and Monitoring System / EPICS Pete Owens Daresbury Laboratory.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
MICE Magnetic Field Mitigation Review Potential impact on ISIS of MICE Stray Magnetic Fields 24 th September 2013 Martin Hughes.
MOM Report Galina Vankova RAL, MICE Video Conference.
Welcome to the World of Programmable Logic Controllers
Copyright © 2002 Delmar Thomson Learning Chapter 1 Welcome to the World of Programmable Logic Controllers.
MICE MICE Target Mechanism Control Electronics Upgrade P J Smith – University of Sheffield James Leaver – Imperial College 2 nd March 2009.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
24/10/2015Sheffield University 1 Target Electronics Recap - Decision has been made to rebuild the target electronics control system so that it is upgraded.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
The 3 parts of an electronic system are :
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Target Installation Plan. Requirement Assemble and test two complete target systems in time for August shutdown How do we do this? What do we need to.
Target Status CM19 RAL October 2007 P J Smith – University of Sheffield.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
MICE Target Installation Chris Booth & Paul Smith Sheffield 26 th July 2007.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
MICE Power Supply System John Joseph LBNL Spectrometer Solenoid Controls & Monitoring Review Dec 11 th 2012.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
WP3 24 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Since 10 July th Re-installed blind on cabinet (JagM) 18 th Serviced Nitrogen.
Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 32 have been tested and calibrated. – 50 have been built so far. Small heat sinks for the.
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
INDUSTRIAL SENSORS Inductive Proximity Sensors. INDUSTRIAL SENSORS Inductive Sensors - Operating Principle Switching amplifier Signal evaluator LC oscillating.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
Linda Coney MICO June 6, 2011 MICE Online Report.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
S A Griffiths CM42 June 2015 Electrical & Control.
Buy Best Quality Candle Making Supplies
Chris Booth Sheffield 29th March 2006
Target Installation Plan
TOTEM Electronics Status
Electric Current.
MICE Target Report Video Conference 29/11/07
Process of Debugging a Circuit
Computer Parts Poster This is one of the first wall displays that I added to my room. I have refined it over the years into the version that you now.
Presentation transcript:

Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009

Control Electronics in R78 is being installed for the Demonstrator system. The control electronics in ISIS will be reinstalled over the forthcoming week. We will be using the same controller that ran the target mechanism last year. (We are still designing the upgraded replacement controller.) Given the slight changes to the mass of the target system and changes to the power supplies I’m expecting to have to make some ‘tweaking’ to the code to account for this – I don’t expect this to be a problem. Additionally we intend to give ISIS the following signals. Target Position and Target Frame Position: Target Position – We need to acquire an analogue buffer to send this up to the ISIS control room. Craig McWaters has offered to make the buffer circuit on his return from A/L Target Frame - The additional wiring has been run between the Power Supply Rack and the MICE LCR. These signals are just relay contacts so some additional voltage supply will be required. Do MICE need to provide voltage or are ISIS happy to provide this?