AIRFRAME MEASUREMENTS P09233 – Managerial Design Review.

Slides:



Advertisements
Similar presentations
Daniel Graves –Project Lead James Reepmeyer – Lead Engineer Brian Smaszcz– Airframe Design Alex Funiciello – Airfoil Design Michael Hardbarger – Control.
Advertisements

Cory Fulkerson (Project Manager) - Mechanical Engineer John Graham - Computer Engineer Clayton Hooks - Electrical Engineer O’Raphael Okoro - Electrical.
RIT Senior Design Project D3 Engineering Camera Platform Friday November 6, :00am to 11:00am.
P11462: Thermoelectric and Fan System for Cook Stove Jared RuggProject Manager (ME) Brad SawyerLead Engineer (ME) Jeff BirdMechanical Engineer Tom GorevskiElectrical.
FRIDAY, JANUARY 8, 2010 RYAN MILLER – ME, PROJECT MANAGER CHRIS OXLEY – EE, LEAD ENGINEER RYAN ENYEART – ME, SYSTEM ENGINEER ALEX MANLEY – EE, SYSTEM ENGINEER.
Inertial Measurement Unit “IMU” (Analog Devices ADIS16350) - Tri-axis gyroscope ± 75°/s, ± 150°/s, ± 300°/s settings - Tri-axis accelerometer ± 10 g measurement.
AIRFRAME MEASUREMENTS P09233 – Managerial Design Review SDII.
P09233 Flight Parameter Measurements Michael Skube & James Hunt P09233
MSD-I Project Review Modular Motion Tracking Sensors 1.
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
EDGE™ MAV Control System - P Management Review (MSD I) Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
Flatiron Mobile Device Security Monitor Thomas Horacek Lucas Greve.
MSD Project P10236: Versatile Adaptive Controller Project Introduction P10236 Introduction.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Knowledge to Shape Your Future Electric / Gas / Water Information collection, analysis and application MekElekItroniks Design Review Battery Charger Project.
Design Review Three Micro Air Vehicle Project: P Sponsored by Impact Technologies The Boeing Company Mark Baybutt Electrical Engineering.
Team Chopper Subterranean Mapping performed by co-operative helicopters Shirley Choi Bejan Hafezzadeh Joseph Kaiser Sean Norwood Itay Tenne.
EDGE™ Project Status Update P09121 – MAV Airframe P09122 – MAV Control System P09123 – MAV Platform Structure Aaron Nash (Mechanical Engineering) Erik.
Vehicle Tracking/Payload Release System For Small UAV Project Team
EDGE™ MAV Control System - P09122 Final Project Review Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
P13625 – Indoor AIR Quality Monitor
Illinois Space Society Tech Team USLI FRR Presentation.
Digital Microfluidics Control System II P15610 Complete Detailed Design.
Phase II Review MSD II P Size is too big and not comparable with original testing Hinge is not possible with rapid prototyping, metal hinge would.
Expansion Joint Active Monitoring. Team Members Joe Savino Mechanical Engineer Adam Remick Electrical Engineer Andrew Hintermeier Mechanical Engineer.
Minnesota BEST Kits Elliot Eid Minnesota BEST Robotics Copyright © 2010 BEST Robotics, Inc. All rights reserved. 1.
Status Report #8 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 04/06/2011.
Michael Bova- Project Lead Kevin Alderfer- Lead Engineer Ryan Selig- Hardware Engineer P Navigation Aid for Visually-Impaired.
Tim Southerton Brian Grosso Matthew Morris Lalit Tanwar Kevin Meehan Alex Reid Advisor: Dr. Becker-Gomez 1RC Camera Car SDR.
DemoSat IV Critical Design Review Metropolitan State College of Denver April 21, 2006.
1.  The Autonomous Helicopter Navigation System 2010 is focused on developing a helicopter system capable of autonomous control, navigation and localising.
Flatiron Mobile Device Security Monitor Thomas Horacek Lucas Greve.
4/18/2009ASGC Symposium Project Members: Bryce Fox Jessica Avitia Sara Daniella Eriksson Mary Begay ASGC Symposium April 18, 2009 at Arizona State University.
Critical Design Review Presentation Jan. 20, 2011.
M E T ROVER MSCD Engineering Technology Critical Design Review Metropolitan State College of Denver April 2004.
Opto-Electric Guitar Pickup Multidisciplinary Senior Design I RIT Spring/Fall
Team Muon Critical Design Review Jennifer Nill Chelsea Donaldson Graham Risch Jonathan Lumpkin Henry Shennan October 5, 2010 Fall 2010 Rev A/B
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
+ P14043 – Smart Cane Phase 4 Lauren Bell Jessica Davila Jake Luckman William McIntyre Aaron Vogel.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
Ian Frank Matt Walter Jesse Steiner Luke Spencer Mike Celentano Nick Balducci Team Lead Chief Engineer Electrical Engineer Industrial Engineer Electrical.
Team Magnaritaville Conceptual Design Review Zachary Cuseo, Andrew Fruge, Shweta Maurya, Sydni Smith, Christopher Nie, Tyler Knappe 9/22/09 Fall 2009 Rev.
Minnesota BEST Kits Elliot Eid Minnesota BEST Robotics Copyright © 2010 BEST Robotics, Inc. All rights reserved. 1.
ECE 477 Design Review Team 5  Spring Project Overview Inertial based character recognition deviceInertial based character recognition device Battery.
The Design of an Electronic Bicycle Monitor (EBM) Team P118: Gary Berglund Andrew Gardner Emrys Maier Ammar Mohammad.
Aerospace Digital Communication Instrument Senior Design Presentation.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Spring CS-EE 481 University of Portland School of Engineering Project Eagle 01/28/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser.
RequirementMethodStatus The payload must not exceed a weight of 1.45 Kgm.Design, Test The payload must conform to the WFF “no volt requirement”
RIT MAV System Review (P08121) Dr. Jeffrey Kozak – Faculty Guide Michael Reeder – Team Leader Kevin Hand – Lead Engineer Todd Fernandez – ME.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
Airframe Measurements
LSU v09/08/05SBC Overview1 Introduction to the LA ACES Student Ballooning Course A summary of the motivation, contents and status of the materials available.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
P07122 – Autonomous Quadcopter Jason Enslin (EE – Team Leader) Courtney Walsh (ME – Aero) Richard Nichols (EE) Glenn Kitchell (CE) Jeff Welch (ME) Dr.
Joseph Ferrara Team Lead (ME) Joseph ChurchDesign Engineer (ME) Joshua Van Hook LabView Engineer (EE) Jamie Jackson Electronics (EE) Joelle Kirsch Project.
Planetary Lander PDR Team Name
P13015: Navigation Aid for the Blind and Deaf
P16081: Systemic Circulation Detailed Design Review
P17082 Biomechanical Elbow Model Final Presentation
P16462: Wind Energy Base Station MSD II Phase 5 Review 5/6/2016
P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016
Sounding Rocket PDR Team Name
Sounding Rocket CDR Team Name
Mars Rover CDR Team Name
P11017 Tactile Navigation Interface
Managerial REVIEW UAV AIRFRAME B
Team P16228: Magnetically Levitated Propeller
Detailed Design Review: P18001
Presentation transcript:

AIRFRAME MEASUREMENTS P09233 – Managerial Design Review

Team Structure  Team Lead: Michael Skube – Mechanical Engineer  Co-Team Lead: James Hunt – Mechanical Engineer  Electrical Lead: Joseph Peters – Electrical Engineer  Kevin Li – Electrical Engineer  William Atkinson – Mechanical Engineer  Heidi Morgan – Electrical Engineer  John Isely – Mechanical Engineer

Project Concept Development GPS Velocity IMU Altitude Data Processing Provide Measurements for Controlled Flight Interchangeable Sensors Single Mounting Structure Low Impact on Airframe Provide Measurements Package Sensor Function Measurement System Usage/Implementation Measurement System Assembly Provide Documentation

Airframe Measurement System

Measurements Box Design Microcontroller Altimeter GPS Ultrasonic IMU

Expenses To Date # ItemModel ManufacturePart NumberQTYPriceShipped 1 AltimeterZLOG 3 Digital Products#ZLOG31 $ $ Data RecordereLogger V3 Eagle Tree SystemsMPRV3-LEADS-1001 $ $ AltimeterMicroSensor V3 Eagle Tree SystemsALTIMETER-V31 $ AirspeedMicroSensor V3 Eagle Tree SystemsAIRSPEED-V31 $ Pitot-Static TubePitot-Static Tube Kit Eagle Tree SystemsPITOT-KIT-V35 $ 9.99 $ MicroprocessorSAM7-256 Board Spark Fun ElectronicsDEV $ $ GPS32 Chan San Jose Nav. Spark Fun ElectronicsGPS $ AltimeterUltrasonic Range Finder Spark Fun ElectronicsSEN $ GPS Break Out Board Lassen iQ Eval Board - USB Spark Fun ElectronicsGPS $ $ /16" X 12" X 12" Foam w/ Adhesive Back, SOFT McMaster86375K1513 $ 8.17 $ /8" X 1/2" 39' Foam w/ Adhesive Back, SOFT McMaster93275K121 $ " Dia,.057" Thick Vibration Grommet McMaster9311K1382 $ $ /8" X 12" X 12" Foam w/ Adhesive Back, FIRM McMaster86375K1633 $ 6.94 $ /16" ID, 1/8" ODSilicone Tubing McMaster51135K1150 $ 0.41 $ , 1/8" HBarrel Thread Plate McMaster90975A0021 $ /16" Single BarbTee Fitting McMaster5116K111 $ mm OD, 3.2mm ID Fiber Washer McMaster95225A3151 $ , 1/2" LengthSocket Cap Screw McMaster92196A1101 $ 4.26 # ItemModel ManufacturePart NumberQTYPriceShipped , 3/4" LengthSocket Cap Screw McMaster92196A1131 $ , 1" LengthSocket Cap Screw McMaster92196A1151 $ /32" X 12" X 12"PTFE Sheet Gasket McMaster1063T212 $ 7.05 $ /16" X 12" X 12"PTFE Sheet Gasket McMaster1063T222 $ $ IMU Analog Devices 1 $ - 24 BOX - MOD01Initial Release of BOX P $ Pack of BateriesAA Radio Shack-2 $ 2.50 $ Pack of BateriesAAA Radio Shack-2 $ 2.50 $ Battery Holder4X AA Radio Shack-1 $ Battery Clips9V Radio Shack-1 $ Battery Holder2X AA Radio Shack-1 $ Battery Holder3X AAA Radio Shack-1 $ Adapter PlugM Radio Shack-1 $ - 32 AC Adapter6V 800Ma AC Radio Shack-1 $ SD Memory Card1Gb Sandisk-1 $ Binder1.5" OFFICE DEPOT-1 $ Ready Index5 Tabs OFFICE DEPOT-1 $ Binder1.5" (2-Pack) OFFICE DEPOT-1 $ 5.29 $

Bill of Materials #ItemModelManufacturePart NumberQTYPriceShippingShipped 1AltimeterZLOG 3Digital Products#ZLOG31 $ $ 3.79 $ AirspeedMicroSensor V3Eagle Tree SystemsAIRSPEED-V32 $ $ - $ Pitot-Static TubePitot-Static Tube KitEagle Tree SystemsPITOT-KIT-V32 $ 9.99 $ - $ MicroprocessorSAM7-256 BoardSpark Fun ElectronicsDEV $ $ 9.79 $ GPS32 Chan San Jose Nav.Spark Fun ElectronicsGPS $ $ - $ AltimeterUltrasonic Range FinderSpark Fun ElectronicsSEN $ $ - $ GPS Break Out BoardLassen iQ Eval Board - USBSpark Fun ElectronicsGPS $ $ $ /16" X 12" X 12"Foam w/ Adhesive Back, SOFTMcMaster86375K1511 $ 8.17 $ - $ /8" X 1/2" 39'Foam w/ Adhesive Back, SOFTMcMaster93275K121 $ $ - $ " Dia,.057" ThickVibration GrommetMcMaster9311K138 12/25 $ $ - $ /8" X 12" X 12"Foam w/ Adhesive Back, FIRMMcMaster86375K1631 $ 6.94 $ - $ /16" ID, 1/8" ODSilicone TubingMcMaster51135K1120 $ 0.41 $ - $ , 1/8" HBarrel Thread PlateMcMaster90975A002 17/100 $ 9.01 $ - $ mm OD, 3.2mm IDFiber WasherMcMaster95225A315 31/100 $ 8.35 $ - $ , 1/2" LengthSocket Cap ScrewMcMaster92196A110 7/100 $ 4.26 $ - $ , 3/4" LengthSocket Cap ScrewMcMaster92196A113 7/100 $ 4.52 $ - $ , 1" LengthSocket Cap ScrewMcMaster92196A115 7/100 $ 5.78 $ - $ IMUADIS 16350Analog DevicesADIS $ $ - $ BOX - MOD01Initial Release of BOXP /4 $ $ - $ AC Adapter6V 800Ma ACRadio Shack-1 $ $ - $ SD Memory Card1GbSandisk-1 $ $ - $ TOTAL $ 1,100.79

Projected Project Costs  Building a second Measurements Box:  Total Project Cost: $1900 (includes IMU cost ~$500)  Total Project Cost: $1400 (assumes donated IMU)  Measurements Box BOM:  $1100 (includes IMU cost ~$500)  $600 (assumes donated IMU)  The Current Project Cost: $910

Current Risks  Ability to Program the MCU  Ability to Interface with the IMU  Ability to Test the IMU – MAV Test Stand  GPS Calibration  Airframe A Flight Testing

Action Items  Program MCU  IMU Testing  Further Sensor Testing  Pitot Static Tube Mounting Design  Part Drawings  Assembly Instructions  Component Documentation

Schedule - SDII Team MemberWEEK 11 FINALSBREAKWEEK 12WEEK 13WEEK 14 Michael Skube (TEAM LEAD) Review Project Status, Meet with team leads, Update EDGE, Individual Sensor Review, Order new Parts, Finalize SD I Documents Complete Documentation, Write Instillation Instructions Meet with Team Leads, Update EDGE, System Integration Review Test complete system on Ground Station James Hunt (TEAM / MECHANICAL LEAD) Prepare for Individual Sensor Review, Revisit Sensor Selection if needed, Continue Testing, Meet with team leads Complete Documentation, Write Instillation Instructions Begin Testing Complete Measurements System, Meet with Team Leads Test complete system on Ground Station Joseph Peters (ELECTICAL LEAD) Prepare for Individual Sensor Review, Revisit Sensor Selection if needed, Continue Testing, Meet with team leads Complete Documentation, Program Microcontroller Program Microcontroller Begin Complete System Integration, Meet with Team Leads Test complete system on Ground Station Kevin Li Prepare for Individual Sensor Review, Revisit Sensor Selection if needed, Continue Testing, present testing results Complete Documentation, Program Microcontroller Program MicrocontrollerBegin Complete System Integration Test complete system on Ground Station Heidi Morgan Prepare for Individual Sensor Review, Revisit Sensor Selection if needed, Continue Testing, present testing results Complete Documentation, Program Microcontroller Program MicrocontrollerBegin Complete System Integration Test complete system on Ground Station John Isely Prepare for Individual Sensor Review, Revisit Sensor Selection if needed, Continue Testing, present testing results Complete Documentation, Test Sensors Begin Complete System Integration Test complete system on Ground Station William Atkinson Prepare for Individual Sensor Review, Revisit Sensor Selection if needed, Continue Testing, present testing results Complete Documentation, Test Sensors Begin Complete System Integration Test complete system on Ground Station

Team MemberWEEK 15/17WEEK 16WEEK 18WEEK 19WEEK 20/21/22 Michael Skube (TEAM LEAD) Review/Fix/Re-test Complete Measurements System on Ground System, Meet with other Team Leads Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster Update Documentation, Meet with Team Leads, Update EDGE, Fly Measurements System and Document Flight, Prepare for IMAGINE RIT IMAGINE RIT FESTIVAL Finalize All Documentation, Update EDGE, Team Lead Meeting James Hunt (TEAM / MECHANICAL LEAD) Review/Fix/Re-test Complete Measurements System on Ground System, Meet with other Team Leads Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster Update Documentation, Meet with Team Leads, Update EDGE, Fly Measurements System and Document Flight, Prepare for IMAGINE RIT Finalize All Documentation, Update EDGE, Team Lead Meeting Joseph Peters (ELECTICAL LEAD) Review/Fix/Re-test Complete Measurements System on Ground System, Meet with other Team Leads Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster Update Documentation, Meet with Team Leads, Update EDGE, Fly Measurements System and Document Flight, Prepare for IMAGINE RIT Finalize All Documentation, Update EDGE, Team Lead Meeting Kevin Li Review/Fix/Re-test Complete Measurements System on Ground System, Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster Update Documentation, Update EDGE, Fly Measurements System and Document Flight, Prepare for IMAGINE RIT Finalize All Documentation, Update EDGE Heidi Morgan Review/Fix/Re-test Complete Measurements System on Ground System, Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster Update Documentation, Update EDGE, Fly Measurements System and Document Flight, Prepare for IMAGINE RIT Finalize All Documentation, Update EDGE John Isely Review/Fix/Re-test Complete Measurements System on Ground System, Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster Update Documentation, Update EDGE, Fly Measurements System and Document Flight, Prepare for IMAGINE RIT Finalize All Documentation, Update EDGE William Atkinson Review/Fix/Re-test Complete Measurements System on Ground System, Test complete system on Airframe A, Prepare for IMAGINE RIT, Begin Design of SD Poster Update Documentation, Update EDGE, Fly Measurements System and Document Flight, Prepare for IMAGINE RIT Finalize All Documentation, Update EDGE Schedule - SDII