Computer Room Efficiency Improvement Greening ICT project with JISC 23 rd of September 2011
Carbon Management Board, September 26 th, 2011 Page 2 Objectives Reduce power consumption in Computer Rooms by 5% a year using a combination of measures: Air-to-air cooling units (“free” cooling)– more efficient room cooling Cold aisles inside the rooms – more efficient equipment /racks cooling Windows films/replacement, UPS downsizing, efficient lighting – reduce heat generation Miscellaneous – adjustments to cooling units Share experience with educational sector and offer a project role to Imperial students. Follow best practices outlined in EU Code of Conduct for data centres. In cooperation with
Carbon Management Board, September 26 th, 2011 Page 3 Latest status Awaiting quotes for free cooling, cold aisles and lighting equipment and installation. Finalizing Data centre electricity meter readings reporting: emotr.absconsulting.uk.com emotr.absconsulting.uk.com Ready to submit participant application to EU Code of Conduct board. Working on improving temperature reporting and control in the computer rooms. Project team: Tom Billing, ABS Consulting Kevin Cope, Estates Shiang Chin, 4 th Year Mechanical Engineering student Brian D’Lasselle, Estates Steven Lawlor, ICT Computer Rooms Archie Spence, ABS Consulting Alex Yakimov, ICT Technical Operations
Carbon Management Board, September 26 th, 2011 Page 4 EMOTR software
Carbon Management Board, September 26 th, 2011 Page 5 Chilled water units
Carbon Management Board, September 26 th, 2011 Page 6 Background nOur Computer rooms (Data Centres) host around 2,500 servers and support; Imperial College, Natural History Museum, Royal College of Music and Janet-LMN nThis project focuses on our primary Data Centre (two main rooms), housed in a traditional 1960’s building. Room 401 PUE = 1.32, Room 402 PUE = 1.52 nAnnual consumption is circa: 7,500,000 kWh £500,0004,000 tCO 2 nTarget 5% reduction in annual energy consumption Extend Cold Aisle containment (further 56 racks) More efficient lightingFree Air Cooling Option: Supplement Existing Chilled Water