RS-X 2011—LRR 1 Pushing the RockSat Concept to New E x tremes Colorado Space Grant Consortium Launch Readiness Review (LRR) 8 July, 2011.

Slides:



Advertisements
Similar presentations
SOME OF THE MOST COMMON TESTING MISTAKES MADE BY TECHNICIANS PERFORMING VERIFICATIONS TO CAN/ULC The reason I know some of them is because I have.
Advertisements

Suggestion #1 Richard Gonzalez. What do I what to bring to this semester from the last one ? Why ?  I wanted to bring to this semester from the previous.
Substitute FAQs SubFinder Overview. FAQs Do I have to have touch-tone service to use SubFinder? No, but you do need a telephone that can be switched from.
Protocol & Test Review Spaceport America Student Launch University/Institution Team Members Date.
Data Test Review Spaceport America Student Launch University/Institution Team Members Date.
Comments on this template -Leave time for questions -Leave time for demonstration (at the final LRR) -Use your actual hardware in the presentation -Practice.
RockSat-C 2012 LRR Launch Readiness Review University/Institution Team Members Date.
Colorado Space Grant Consortium Virginia Space Grant Consortium 1 University A University B Team # Logo 1 Logo 2.
RockSat-C 2012 SITR Full Mission Simulation Report University/Institution Team Members Date.
Individual Subsystem Testing Report Team Name University/Institution Team Members Date.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #05 Gateway To Space ASEN / ASTR 2500 Class #05.
RockSat-C 2011 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #28 Gateway To Space ASEN / ASTR 2500 Class #28.
RockSat-C 2011 ISTR Payload Subsystem Integration and Testing Report Universities/Institutions Team Members Date.
My Policies and Some Advice for Doing Well in this Course.
Full Mission Simulation Test Report Team Name University/Institution Team Members Date.
My Policies and Some Advice for Doing Well in this Course.
Team Name Final Presentation Team Members Date Rev
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #23 Gateway To Space ASEN / ASTR 2500 Class #23.
New School Process Please read the following slides carefully, as they provide helpful information about the new school account creation process.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #06 Gateway To Space ASEN / ASTR 2500 Class #06.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #24 Gateway To Space ASEN / ASTR 2500 Class #24.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #9 Gateway To Space ASEN / ASTR 2500 Class #9.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.
Conceptual Design Review Metro State College of Denver Daniel Bass, Matt Hanley
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Miscellaneous Notes: This is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here. Basically this.
At Your Service. At your Service We all can spot great customer service when we see it, but do you follow the proper steps to provide excellent customer.
New Mexico Space Grant Consortium Student Launch Program Provide annual access to space for student experiments from Spaceport America.
Setting up IC to use a 4 Point Scale Created by North High School 2013.
2014 CDR Team Name Critical Design Review CDR CDR Delieverables 1.Mechanical drawings in pdf format 2.Electrical schematics in pdf format 3.Completed.
This will explain how to make an online assignment using Skyward. Students need to know how to log into their Skyward account to complete this assignment.
Team Name Flight Readiness Review (this is a bare-bones template – make it fancier if you wish, but be sure to address at least the items listed here)
Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #06 Gateway To Space ASEN 1400 / ASTR 2500 Class #06 T-79.
Multi-media Information Systems Introduction Brian Whitworth © 2001.
Colorado Space Grant Consortium Gateway To Space ASEN 1400 / ASTR 2500 Class #21 Gateway To Space ASEN 1400 / ASTR 2500 Class #21 T-25.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
2013 DR / ISTR Team Name Design Review (DR) & Individual Subsystem Test Review (ISTR) University/Institution Team Members Date 1.
RockSat-C 2012 SITR Full Mission Simulation Report Harding University William Waldron, Joshua Griffith, Drew Cancienne, Edmond Wilson, David Stair 22 April.
RockSat-C 2012 SITR Full Mission Simulation Report University of Minnesota Alexander Richman Jacob Schultz Justine Topel Will Thorson 4/23/2012.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
2012 – PAUL FARRELL Welcome to Ancient History. Who Am I? Started teaching in Have an Arts degree in History from Sydney University. Currently working.
Launch Readiness Review
2013 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Testing External Survey Automatic Credit Granting Shepherd University Department of Psychology.
RockSat-C 2013 FMSTR Full Mission Simulation Report University/Institution Team Members Date.
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #06 Gateway To Space ASEN / ASTR 2500 Class #06.
Notes on this template You may reformat this to fit your design, but make sure you cover the information requested in this template. Presentations should.
2016 FMSR Team Name Full Mission Simulation Review (FMSR) University/Institution Team Members Date 1.
2014 CoDR Team Name Conceptual Design Review University/Institution Team Members Date 1.
Cooperative Elementary Library Teacher/Staff Procedures
SENIOR PROJECT REMINDERS It’s coming up quickly…double check that you’re on the right track! Please take out your senior project handbook, yellow calendars,
ON LINE TOPIC Assessment.  Educational assessment is the process of documenting, usually in measurable terms, knowledge, skills, attitudes and beliefs.
Tethered Aerostat Program Concept Design Review Team Name Conceptual Design Review University/College Team Members Date.
Presents. THE KEY TO GOOD MANAGEMENT The Art of Delegation BY J.B. TOMLINSON [IN MEMORY]
2016 STR Team Name Subsystem Testing Review (STR) University/Institution Team Members Date 1.
RockSat-C 2013 SITR Payload Subsystem Integration and Testing Report University/Institution Team Members Date.
Fast-Personalized-Full Satisfaction-Client Support
MyStatLab Student help/instructions MTH/233
RoverSat Critical Design Review UCCS Space Grant Team
7th Grade Mathematics Overview Materials Classroom Policies
Launch Readiness Review
Gateway To Space T-32 ASEN / ASTR 2500 Class #13
RockOn... A Sounding Rocket Payload Workshop
Gateway To Space ASEN / ASTR 2500 Class #14
FM2 Section A Planning Workshop
Presentation transcript:

RS-X 2011—LRR 1 Pushing the RockSat Concept to New E x tremes Colorado Space Grant Consortium Launch Readiness Review (LRR) 8 July, 2011

RS-X 2011—LRR 2 About This Template 1.Please follow the template as closely as possible 2.Please do not add superfluous information 3.You have 15 minutes to present, please keep that in mind 4.Please don’t lie to me… I will do what I can to help 5.If you have questions, please don’t hesitate to contact me

RS-X 2011—LRR 3 Mission Overview For completeness and for those that might not remember

June Testing Results 4 Sequence Testing Environmental Mass/Electrical Checks Plans/Readiness lbf Final Weight June Testing

5 Mission Readiness

6 6 Action Item Close Out From your previous slide (Quad Chart)? 1.What actions/issues have been closed? a)How? 2.What actions/issues are still open? a)Can you resolve them in the next few days? b)Is de-scoping an option? c)Can I help with anything?

7 7 Mission Readiness Can you complete your full mission? If not, why? Time constraints? Hardware didn’t survive vibe? What aspect(s) of your mission has/have changed?

8 8 Lessons Learned Pass along your knowledge to next year’s teams What worked well for your team (in general)? What didn’t work? What did you learn from June testing? What would you do differently? What suggestions do you have for me to make next year better? **Keep in mind this is the pilot year ;)

9 Interface Readiness

RS-X 2011—LRR 10 Interface (GSE) Testing Can you pass my GSE test? Review the procedure!!!! Do you understand all of it? Are you concerned about any portion of the test? What caused you to fail the first time? Have you fixed that? If you have questions, call/ me PLEASE don’t make Thursday a late night

RS-X 2011—LRR 11 Interface Requirements RequirementDescriptionVerification RS-X 1.0 All payloads shall arrive with the power connector properly wired according to: RS-X Power ICDI RS-X 2.0All payloads shall have neutral power pins relative to GSE groundT RS-X 3.0The payload decks shall be neutral with respect to GSE groundT RS-X 4.0 The payload power system shall be operable in accordance with the specifications given in: RS-X Power ICDT RS-X 5.0Customers shall use no more than 1 Amp Hour (Ah) over the course of the flightT RS-X 6.0 All payloads shall arrive with the telemetry connector properly wired according with the specifications given in: RS-X Telemetry ICDI RS-X 7.0 All payloads shall arrive with the correct voltages on each pin in accordance with: RS-X Telemetry ICDT RS-X 8.0 The payload telemetry system shall operate in accordance with the specifications given in: RS-X Telemetry ICDT RS-X 9.0All payloads shall weigh 30±1 lbfI These are the requirements my GSE verifies… Are you ready???

RS-X 2011—LRR 12 Integration Readiness Are you ready for integration? Pictures would be great!!! If you’re not ready, will you be ready by Thursday check-out? Don’t lie, but realize “no” isn’t an acceptable answer

RS-X 2011—LRR 13 Are You Ready??? Are you ready?!?!? I am!!! □ Yes (you only have one option) This is going to be an incredible experience!!!

RS-X 2011—LRR 14 Pushing the RockSat Concept to New E x tremes Questions?