Development of new Mice Target Stator. (or show and tell) Rutherford Lab 13 th December 2011.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

Is new physics necessary for life phenomena? Reflections on Schroedingers lesson Alfredo Iorio Institute of Particle & Nuclear Physics Charles University.
1 PowerPoint Presentation by Douglas Cloud Professor Emeritus of Accounting Pepperdine University © Copyright 2005 South-Western, a division of Thomson.
Why kicking Colombia out of the world cup could help keep the lights on in Rio “Easy energy efficiency gains through super low loss amorphous technology”
Salted Chip Cyclone Matt Fasano Greg Mulkey Victor Smith Leslie Roberts.
Electric Circuits Matthew Kennedy 4 th Grade Bonjour Elementary.
Fremont Style.  10 gauge Nickel, half round U se a length of nickel wire that matches your desired ringsize + a little extra for sanding away the cutter.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Briefs submitted for the TB to approve Tesla’s long lead items: 1)Cold Mass Forging 2)Super conductor wire.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
Target Update – Mico Meeting Monday 21 st April 2008 General Expect to obtain new coils for stators anytime New Shafts at RAL for metrology. Will be back.
Stator Plan & Schedule Chris Booth 2 nd March stators to construct for mid-April. One complete coil assembly recovered from ISIS drive. Coils recoverable.
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
1 MICE Magnets Contents: Background Refurbishment Testing Installation & survey Current status Upstream beamline Open issues & concerns MICE Beamline Review,
Charging System Fundamentals
STEPS INVOLVED IN THE WINDING OF A FAN The following things must be kept in mind while choosing a fan for winding.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
Phase II Review MSD II P Size is too big and not comparable with original testing Hinge is not possible with rapid prototyping, metal hinge would.
1 Personal Finance: Another Perspective Investments 11 - Final Questions & Answers.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
ASPERA-3 Sep. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 9_25/ Page 1 Monthly Status Report Report due 9/25/00 Schedule statused.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
MSD II Week 5 Update P13265: Motorcycle Safety Lighting and Portable Electronics Charging System.
STFC Technology undulator manufacture and measurement James Rochford On behalf of the Helical collaboration.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Is when you say something but it means something else.
How is a permanent (reg.) magnet different from an electromagnet?? Describe how an electromagnet shows how magnetism & electricity relate to each other.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
MICE Target Mechanical Design l Status of Target ref. Schedule »Drawings –Drawing list created (see next slide) includes inventory –Drawings being released.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
Electromagnetism How can you make an electromagnet?
1 MICE PM Report Outcome of Reviews held at CM22 –Motivation for holding them –Outcomes & actions –Observations & follow-ups MICE Video Conference, 20.
TEAMSKILL an exploration of manufacturing The development of this simulation was sponsored by Honeywell and Metal Working Production magazine and run twice.
Hybrid panel heated plate study Currently the curing of the ASIC glue for the hybrid panels are done at room temperature. This is a study to determine.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Transformers A transformer is a device for increasing or decreasing
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Half term 2 week 1. ‘Our greatest weakness lies in giving up. The most certain way to succeed is always to try just one more time.’. What does this quote.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Electromagnets D. Crowley, 2008.
Distributive Property Review 2(x + 4) 2(x) + 2(4) 2x + 8.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
Progress on Stave assembly tooling Stephanie Yang (Oxford) WP4 meeting at Liverpool University, 13 th November 2014.
1 Status of RPC Construction & Cassette Assembly Qingmin Zhang Argonne National Laboratory
S A Griffiths CM42 June 2015 Electrical & Control.
Berkeley status Aug 10th, 2012.
Chris Booth Sheffield 29th March 2006
Stator Plan & Schedule Chris Booth 2nd March 2009
University of Wisconsin
Abbreviated Magnetic Notes
MICE Target Report Video Conference 29/11/07
BELL WORK! You will need a sheet of notebook paper.
Presentation transcript:

Development of new Mice Target Stator. (or show and tell) Rutherford Lab 13 th December 2011

Design The main design work has been completed. It may require minor tweaks when we come to assemble the complete unit. Potting Jig Final Assembly

Gallery Potting Jig Copper & Silver Coils New Slit

Status The Wire This has been one of the main holding items. At the moment is due to be delivered in the next 3 weeks. I have tried to source a UK supplier but without success. Bobbins We have the original 3 bobbins one of which has 6 completed coils (awaiting wire to finish). Plus we have 3 more that are awaiting QA and then slitting at Oxford. These 3 look much better than the originals and I would prefer to use them depending on the timescales. There is also a further 1 possibly 2 at ACP should we choose to purchase them. Electrical Distribution Boards We have enough boards at present to manufacture 3 complete units but they are made in house (IC) and we can get more as required. Cooling Jacket Eamonn has taken the original design and improved on it. It now looks compact and efficient. Gluing Jig This is completed but may need slight modifications/development when we use it.

Conclusions Its been a long drawn out process where the items that were expected to take the least work and sweat turned out to be the difficult ones and vice versa. We hope that we have now ironed out most of the problems and can start to build stators early in the new year. We feel that most of our problems have been addressed though the slight worry is still the HV breakdown. There is a further process we can pursue if this continues to be a problem and that is to insulate the bobbin but this can be expensive.