Life Cycle Implications of ECC- Bridge Components Andrew Shuck May 3, 2010.

Slides:



Advertisements
Similar presentations
Navigation Economic Technologies Symposium 9-10 May 2003 Generic Characteristics of Corps Waterway Models.
Advertisements

Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Lec 25: Ch2.(T&LD): Site planning
Better Accessible Transport to Encourage Robust Intermodal Enterprise Work Package 6 Dr John Harrison.
MTA ETA. Product Description A real-time simulation system that estimates the expected time that it will take a certain bus to arrive at an end- users.
Microsoft® Access® 2010 Training
Life-Cycle Cost Analysis
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
MIT Research: LCA of Commercial Buildings. MIT Concrete Sustainability Hub $10 million investment over 5 years Funded equally by RMCREF & PCA NRMCA providing.
Cost Estimation System Tool
Pavement Design CE 453 Lecture 28.
Strawberry Enterprise Budgeting & AGR-Lite Crop Insurance May 25, 2007 Paul D. Mitchell University of Wisconsin-Madison Agricultural and Applied Economics.
Chapter 2: Equations and Inequalities 2.3: Applications of Equations
Using Rubrics for Evaluating Student Learning. Purpose To review the development of rubrics for the purpose of assessment To share an example of how a.
HEADS UP H urricane E vacuation A nalysis and D ecision S upport U tility P rogram.
Case Study 4 New York State Alternate Route 7. Key Issues to Explore: Capacity of the mainline sections of NYS-7 Adequacy of the weaving sections Performance.
Chapter 7: Statistical Applications in Traffic Engineering
CE 2710 Transportation Engineering
Using Rubrics for Evaluating Student Learning Office of Assessment and Accreditation Indiana State University.
Life Cycle Costing and Reliability H. Scott Matthews February 5, 2003.
Alternative Contracting Techniques for Urban and Rural Applications Chad M. Casey ISE 8105.
June 16, 2004 Dr. Robert Bertini Michael Rose Evaluation of the “COMET” Incident Response Program Oregon Department of Transportation.
MTA ETA. Product Description A real-time simulation system that estimates the expected time that it will take a certain bus to arrive at an end- user’s.
Design Speed and Design Traffic Concepts
Proportioning of Concrete Mixtures
ENGINEERING YOUR FUTURE
Monté Carlo Simulation MGS 3100 – Chapter 9. Simulation Defined A computer-based model used to run experiments on a real system.  Typically done on a.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
BETTER AIR QUALITY 2004 SPECIFIC TRANSPORT MEASURES TO REDUCE EMISSIONS IN HYDERABAD, INDIA Yash Sachdeva, RITES Ltd Viresh Goel, RITES Ltd D.S.Chari,
INFO 637Lecture #31 Software Engineering Process II Launching & Strategy INFO 637 Glenn Booker.
ETSI Methodology1 LCC Methodology Håkan Sundquist Structural Design and Bridges KTH.
1 Reading Report 9 Yin Chen 29 Mar 2004 Reference: Multivariate Resource Performance Forecasting in the Network Weather Service, Martin Swany and Rich.
Economic Analysis: Applications to Work Zones March 25, 2004.
October 29, 2013 Calgary flood 2013 – Resilience of City’s workforce supports Continuation of operations Ron Schafer, Transportation Planning Sandy Virgo,
Creating a GIS Based Traffic Control Planning Tool for the Dallas District Andrew Karl Dr. Maidment CE 394K.3 GIS in Water Resources Term Project Due:
© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source: FHWA.
4-1 Model Input Dollar Value  Dollar value of time  Accident costs  Fuel costs  Emission costs.
Life Cycle Cost Analysis for Bridges In Search of Better Investment and Engineering Decisions.
1 Quality Center 10.0 NOTE: Uninstall the current version of QC before downloading QC All QC 10.0 documents can be located on the BI Shared Services.
Transit Priority Strategies for Multiple Routes under Headway-based Operations Shandong University, China & University of Maryland at College Park, USA.
4.7.2 High-strength Concrete (HSC) Introduction –Definition –Classifications Choice of HSC raw material –Binding material –Excellent aggregate –Superplasticizer.
Chapter 4 MODELING AND ANALYSIS. Model component Data component provides input data User interface displays solution It is the model component of a DSS.
What is Modeling?. Simplifying Complex Phenomena v We live in a complex world v Most of the scientific relationships we study are very complex v Understanding.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
Cost Effective Drainage Structures Henry J. “Hank” Gottschalk, III Technical Resources Engineer Virginia Concrete Conference March 2010.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Assessing the Marginal Cost of Congestion for Vehicle Fleets Using Passive GPS Data Nick Wood, TTI Randall Guensler, Georgia Tech Presented at the 13 th.
5-1 ANSYS, Inc. Proprietary © 2009 ANSYS, Inc. All rights reserved. May 28, 2009 Inventory # Chapter 5 Six Sigma.
Chapter 4 Ordinary Concrete. §4.2 Ingredient of Ordinary Concrete Cement4.2.1 Cement Aggregate Water Concrete Admixture.
Life Cycle Assessment: Framework. Goal: Life cycle THINKING Many “centers” on campus have seminars with lunch and drinks provided. How should drinks be.
Introduction to Inference Confidence Intervals The Task Turns out your estranged uncle’s, cousin's, next-door neighbor’s best friend is in the lucrative.
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Chapter 9 Capacity and Level of Service for Highway Segments
Green Concrete 1 1.
PRECAUTIONS TO TAKE WHEN BUYING A USED CAR. Introduction When you are ready to purchase another vehicle, you definitely have a lot of options in today's.
METRO Dynamic Traffic Assignment in Action COST Presentation ODOT Region 4 April 1,
Modeling the Optimization of a Toll Booth Plaza By Liam Connell, Erin Hoover and Zach Schutzman Figure 1. Plot of k values and outputs from Erlang’s Formula.
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
How to ‘Ace’ Your ACE Entry
Co-Hop Commute M-POWER CAMPAIGN.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
ITTS FEAT Tool Methodology Review ITTS Member States Paula Dowell, PhD
Chapter 3: Cost Estimation Techniques
Flexible Pavement Design (JKR Method)
Issaquah-Fall City Road
Chapter 3: Cost Estimation Techniques
Introduction to Inference
Chapter 3: Cost Estimation Techniques
Presentation transcript:

Life Cycle Implications of ECC- Bridge Components Andrew Shuck May 3, 2010

Areas of Progress 1.Tensile samples with CKD replacement are sanded, glued, and ready to test 2.Components ordered for structural testing 3.Beginning to parameterize LCA aspects of bridge project

ECC Mix Design LCA Draws on an LCI of different components of ECC ingredients (and alternative mix designs), which are: – Cement – Sand – Fly ash – PVA fiber – HRWRA – Water

Different Mix Options 1.Standard structural concrete 2.ECC – M45 mix developed at Michigan 3.Well graded aggregate: like regular concrete, but the gradation of the aggregate (sand, gravel) leads less cement and water content 4.ECC – 30% replacement of cement with CKD

Relative Impacts of 4 mixes

Confirms Intuition 1.Lack of large aggregate (gravel) in ECC means a high amount of cement, which creates problems with CO 2 emissions – Combated to some degree by the potential for waste control by precasting members 2.Exclusion of LA and use of waste materials (fly ash, CKD) means landfilling benefits with ECC

Application of Mix Designs 1.Enter into Simapro to develop full process- based LCA of the bridge superstructure (not the effect its actual construction process has…) 2.Important to establish average (or at least sensitivities of) waste factors of the different materials to realistically capture the impacts of different material options

Traffic Congestion Model CO3 (COnstruction, COngestion, COst) In their own words: “The CO3 System is a tool with which engineers can estimate the magnitude and impacts of traffic congestion, including its cost impact on road users, that can be expected during a construction project.” “CO3 measures the impact of congestion in two basic ways: (1) variables such as delay, diverted vehicles, and backup measure different characteristics of congestion and (2) user cost provides a common unit of measure with which to sum traffic impacts and compare them with construction cost.”

There’s a Catch, Though “The following description of Microsoft Excel assumes that the user is familiar with a keyboard and how it works…”

CO3 - Overview Different tabs of user-input: traffic, routes, impact, input Gives results in terms of money and time lost due to the chosen lane closure method Want to get the daily loss for our project and look at that impact over the course of multiple days saved by using an ECC-based structural system

CO3 – Critical Inputs Value of time & distance on the road to the user Traffic information: volume and distribution throughout the day Fate of cars by percentage: delayed, diverted, canceled Lane closure pattern/method

CO3 – Value to User This value should be easily parameterized, and will probably be pretty linear – Simply take multiple values of the user loss per time/mile and the results of those different values and fit a line to the relationship – Someone wanting to perform an LCA of the ECC bridge option can simply choose their user value based on a to-be-determined basis

CO3 – Traffic Info This information is tricky: the volume of vehicles is easy… – Average daily traffic along I-80 in Nebraska (location of example bridge) = 39,285 of which 7,640 units are heavy commercial vehicles … but the distribution of this traffic through the day is tougher – Bi-modal peak traffic from commuters or more uniform throughout the day? – Not sure how to address this… maybe a couple of different distributions can be given as options

CO3 – Vehicle Assignment Delayed: stuck in your traffic mess Diverted: take a detour Canceled: don’t make trip at all (I think)

CO3 – Problems with Assignments Importance of Route: In terms of generalizing this information, how can we identify the percentage of people that HAVE to make a trip everyday? (i.e., cannot “cancel”) Detour: Very site-specific, and difficult to limit to a couple of options

CO3 – Lane Closure Method Presumably closing 1 lane (of 2) of traffic for 1 mile, but that could certainly change – Just parameterize for a couple of lane options Will the different bridge systems mean different fundamental lane closure requirements?

CO3 – In Sum Hang-ups are certainly surmountable, but I need to get a better idea of what the results are most sensitive to when making assumptions 250 page CO3 user manual will be my best friend for a few weeks more But wait, there’s more!

Additional LCA Models MOVES – Motor Vehicle Emissions Simulator – GUI-based program linked with MySQL, which I need much more practice with NONROAD – nonroad engines, equipment and vehicles – Impossibly fickle/uppity GUI that refused to yield after ~5 hours of battle… I know there are Zen gardens devoted to dealing with this program

Archaeological Aside: Old Concrete Histogram of compressive strength for gym foundation cored samples (in psi)

Questions? Thank you!