February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.

Slides:



Advertisements
Similar presentations
Cryomodule Helium Volumes Tom Peterson, Fermilab AWLC14 13 May 2014.
Advertisements

Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
Current status Arkadiy Klebaner November 21, 2012
12 GeV Upgrade of Cryogenics at Jefferson Laboratory (Jlab) Dana Arenius Engineering Division Cryogenic Systems ILC08 Nov This work is supported.
SOLENOID LOW POWER COLD TEST
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
Heat load study of cryomodule in STF
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Cryomodule Helium Vessel Pressure -- a Few Additional Comments Tom Peterson 18 November 2007.
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
October, 2009 Cryogenics System Roberto Than October, 2009 Internal Review.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
R. Than J. Huang P. Orfin T. Tallerico Jan. 19, 2011
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Test Lab Cryogenic Requirements Kirk Davis Director’s Review of Cryogenic Capacity 26 May, 2010.
Thomas Jefferson National Accelerator Facility Page 1 SPL Cryogenic and vacuum sectorisations 9-10 November, 2009 Joe Preble Workshop on cryogenic and.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
GLA2011 The cryogenic systems of the LHC experiments Johan Bremer on behalf of TE/CRG, ATLAS collaboration and CMS collaboration.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
EXTRACTION OF HIGH VOLUME CRYOGENIC HEAT LOAD
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
NML Cryogenic System Arkadiy Klebaner Cryomodule One Commissioning June 3, 2011.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Jonathan Creel Electrical / Cryogenics Engineer Cryogenics.
Overview of the ESS Linac Cryogenic Distribution System
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Final Design Cryogenic and mechanical configurations
LCLS-II Technical Requirements
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
CERN – Zanon discussions
Process Simulation for the LCLS-II Cryogenic Systems
FRIB Cryogenic Support
at STFC Daresbury laboratory
Nathaniel Garceau, Wei Guo, Thomas Dodamead
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
LARP Vertical Test Facility
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
2K Cold Box Process Design
Mathew C. Wright October 2016
SHMS Cryogenics and Q2(Q3Dipole) Cool Down
Cryogenic cavern in Asian site
ESS elliptical cryomodule
SNS PPU Cryomodule Instrumentation
Cryomodules Challenges for PERLE
ESS elliptical cryomodule
CTF Users’ Perspective
ESR2 Process Cycle Design
Cryogenics – The Basics
CRYOMODULE FINAL ASSEMBLY
ESR2 Process Cycle Design
Presentation transcript:

February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS

February 17-18, 2010 R&D ERL Roberto Than Cryogenics System Introduction e-CX 5 Cell Cavity Cryomodule SRF Gun Cryomodule Cold Cathode Cooling Cryogenic System Operation Summary Cavity cooled in 2K 23 Torr Warm vacuum pump 4.5K Cryo plant 2

February 17-18, 2010 R&D ERL Roberto Than e-CX 5 Cell Cavity Cryomodule P&ID 3 FPC intercept Endbore Intercepts Tuner Intercepts Intercept cooling: 3atm, 5K Nitrogen Shield 550L RESERVOIR: 550L

February 17-18, 2010 R&D ERL Roberto Than e-CX 5 Cell Cavity Heat Transfer Niobium wetted area 1.6 m 2. Nominal surface heat flux: ~25 W/m 2 Kapitza resistance: 1.5 cm 2 -K/W Kapitza temperature gradient: ~ 2.4 mK Interconnect has a crossection area of 205 cm 2. Cross sectional heat flux density is approximately 0.3 W/cm 2 Interconnect is 80 cm tall Superfluid conductivity gradient at 2K: about 1 mK 4

February 17-18, 2010 R&D ERL Roberto Than e-CX 5 Cell Cavity System Thermal Load 2K Helium Load Cavity Dynamic Load 40 W Static Load 6 W (~20W) Reservoir LHe Volume 3 W Fill valve 1.5 W Vac break 0.5 W Vent 3 W Total Load 54 W (~68W) Intercepts cooling 3 atm, 5K supply F.Power Coupler 0.15 (0.3)g/s Transition# (0.3)g/s Transition# (0.3)g/s Tuner Total 0.45 (0.9)g/s Shield cooling: LN2 5

February 17-18, 2010 R&D ERL Roberto Than e-CX 5 Cell Cryomodule Reliefs 6 VOLUMESet Pres psig Load kW Relief Rate kg/s Req’ Area in 2 Relief Area In 2 MNFA Helium side 50.05Relief valve Helium side 860 Loss of UHV vacuum to air Disk UHV side x 1.4 [2 x 2” Disk] Insulating Vacuum 7 psi 6” lift plate

February 17-18, 2010 R&D ERL Roberto Than SRF Gun Cryomodule P&ID 7 FPC’s Intercepts End flanges& HTS solenoid Intercepts Intercept cooling: 3atm, 5K Nitrogen Shield 160L Reservoir: 160L LN2 Cathode Cooling LN2 Loop

February 17-18, 2010 R&D ERL Roberto Than SRF Gun Cavity Heat transfer Niobium wetted area ~ 0.25 m 2. Nominal surface heat flux: ~30 W/m 2 Kapitza resistance: 1.5 cm 2 -K/W Kapitza temperature gradient: ~ 20 mK Interconnect has a crossection area of 46 cm 2. Cross sectional heat flux density is approximately 0.3 W/cm 2 Interconnect is 60 cm tall Superfluid conductivity gradient at 2K: about 1 mK 8

February 17-18, 2010 R&D ERL Roberto Than SRF Gun System Thermal Load 2K Helium Load Dynamic Load 7 W Static Load 8 W Reservoir 1 W Fill valve 1.5 W Vent 3 W Total Load 21 W Intercepts cooling 3 atm, 5K supply F. Power Coupler# g/s F. Power Coupler# g/s Transitions/solenoid 0.3 g/s Total 0.45 g/s Shield cooling: LN2 9

February 17-18, 2010 R&D ERL Roberto Than SRF Gun Cryomodule Relief 10 VOLUMESet Pres psig Load kW Relief Rate Kg/s Req’ Area in 2 Relief Area In 2 MNFA Helium side50.05Relief valve Helium side814 Loss of insulating vacuum to air [3” Disk] UHV side [1.5” Disk] Insulating Vacuum [6” Disk]

February 17-18, 2010 R&D ERL Roberto Than SRF Gun Cathode Tip Cooling 11 LN2 COOLED 50W CONVECTION NUCLEATE BOILING X<10% FLOW: 5 g/s

February 17-18, 2010 R&D ERL Roberto Than Cryo System Diagram 12 LHe supply Vhe Return 2 - 4K FPC 2FPC ENDBORE & SOLENOID END E-CX 5-cell SRF Gun

February 17-18, 2010 R&D ERL Roberto Than Cryo System Equipment Compressor: 50 g/s Sullair with Oil Vapor Removal System 300 W or 3 g/s 1660S 4.5K piston expander plant With Wet-expander pod: 3.5 g/s 1000 Gallon (3800 liter) Liquid Helium dewar LHe Subcooler: 200 liter, Plant output from 6K to 4.6K Warm He storage Tank: 43,000 Gal (162 m 3 ) 3500 Liq 17 atm Warm Process Vacuum Pump: 5.5 to 6 g/s, 23 Vertical LN2 Dewar: 11,000 Gal Cryogenic Transfer Lines System 13

February 17-18, 2010 R&D ERL Roberto Than Cryo System 2K Capacity No 4K to 300K Recovery –Liquefaction Load 2K-4K Recovery HX Reservoir –Peak Mode –5-Cell: 400L usable  g/s: 92 W –Gun: 110 L usable  g/s: 35 W Peak Mode –Draw down reservoir –No fill from JT valve –5.5 g/s Vacuum Pump –128 2K Steady State –Constant level reservoir –Fill from JT valve –2K-4K Recovery –5.5 g/s Vacuum Pump –94 2K 14

February 17-18, 2010 R&D ERL Roberto Than Operation 2K Load Max Min ReLiq 2K Refrig Load 5.5 g/s 2.0 g/s 0.5 g/s Intercepts : 1.5 g/s 1.5 g/s 0.5 g/s Total Liquefaction: 7.0 g/s 3.5 g/s 1.0 g/s 2500 L Reservoir from Storage Dewar Plant 3.5 g/s 3.5 g/s 3.5 g/s+50W Net Plant 2.4 g/s 2.4 g/s 2.5 g/s Net draw rate -4.6 g/s g/s +2.5 g/s Continuous 18 hrs 75 hrs 33 hr 15

February 17-18, 2010 R&D ERL Roberto Than Summary Cryogenic System: 128 peak for several hrs »94 W Continuous Duty »Run peak cavity loads for at least 12 hours Cryogenic Plant also serves Vertical Test Facility –40 inch (1m) diameter Vertical Test Dewar –14 inch (0.35m) & 28 inch (0.7m) dia Vertical Test Dewar Status –All equipment in location, warm piping under installation –Subcooler: Delivery July 2010 –Cathode Cooling LN2 System: Engineering –Cryogenic Transfer lines: Delivery  Batch1 October Batch 2 Nov 2010 –Installation & check out: to March