1 PreCam Results & Plans (Version: 9 May 2011) Douglas L. Tucker (FNAL) DES Directors’ Council Review 10-11 May 2010.

Slides:



Advertisements
Similar presentations
SDSS-II Development Projects Bill Boroski SDSS-II First Year Review National Science Foundation August 7, 2006.
Advertisements

Dark Energy Camera Observing Strategy James Annis Experimental Astrophysics Group Fermilab.
1 PreCam Analysis Plans Douglas L. Tucker PreCam Observing Run Wrap-up Telecon 27 January 2011.
1 FNAL-ANL PreCam Reductions Douglas L. Tucker (FNAL) DES Collaboration Meeting ICG, Portsmouth PreCam Parallel Session 29 June 2011.
DES PreCam A Proposal for the PreCam Calibration Strategy J. Allyn Smith David L. Burke Melissa J. Butner 15 July 2009 DRAFT.
1 PreCam and Global Calibrations Douglas L. Tucker & Sahar Allam DES-Calib/PreCam Telecon 28 October 2011.
PAIRITEL Photometry of Dwarfs from the IRAC GTO sample Joseph L. Hora Brian Patten, Massimo Marengo Harvard-Smithsonian Center for Astrophysics 2 nd Annual.
LBC-Blue pre-commissioning LBC-Blue LBC-Blue –E Giallongo (PI) Rome: diPaola, Pedichini, Speziali, Testa, Gallozzi Rome: diPaola, Pedichini, Speziali,
VISTA pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,
The Photometric Calibration of the Dark Energy Survey D. L. Tucker 1, S. S. Allam 1, J. T. Annis 1, R. Armstrong 2, J. P. Bernstein 3, E. Bertin 4, D.
A Primer on Image Acquisition and Data Reduction Using TheSky6, CCDSoft V5 and Microsoft Excel Thomas C. Smith Dark Ridge Observatory (DRO)
Learning and Using MPO PhotoRed Copyright, 2006 © Bdw Publishing Brian D. Warner Palmer Divide Observatory.
PreCam: Lessons Learned, version 0 Kyler Kuehn
Douglas L. Tucker (FNAL) SISPI Meeting 22 February 2007 Sky Camera DB Inputs.
1 PreCam Data Mini-Workshop Report Douglas L. Tucker DES-Calib/PreCam Telecon 11 February 2011.
1 DES Calibrations Plan Douglas L. Tucker & Darren L. DePoy DES Collaboration Meeting 9 November 2008.
The LSST Exposure Time Calculator was developed to model the effects of LSST design changes on signal-to-noise ratio and survey depth. The ETC utilizes.
Calibration Plan for Early DES Data
● DES Galaxy Cluster Mock Catalogs – Local cluster luminosity function (LF), luminosity-mass, and number-mass relations (within R 200 virial region) from.
The Observations of LAMOST Jianrong Shi NAOC 1/
School of something FACULTY OF OTHER School of Physics & Astronomy FACULTY OF MATHEMATICS & PHYSICAL SCIENCES The Cornish Survey Workshop.
1 DES Photometric Calibration Strategy Douglas L. Tucker (FNAL) Filter and Calibrations Strategy Workshop 4 April 2008.
1 PreCam’s Progress Douglas L. Tucker for the PreCam Team FCPA Chalk Talk Notes Fermilab, 10 February 2011.
1 The Photometric Calibration of the DES Douglas L. Tucker (FNAL) Joint DOE/NSF Review of DES January 2008.
1 Calibration & PreCam Douglas L. Tucker (FNAL) DES Collaboration Meeting CIEMAT, 6 May 2010 Outline: I.Calibration Plan Overview II.Updates.
AST 443/PHY 517 : Observational Techniques November 6, 2007 ASTROMETRY By: Jackie Faherty.
Y-band Imaging of Extragalatic Fields and High redshift Quasars Changsu Choi 1, Myungshin Im 1 1 Center for the Exploration of the Origin of the Universe,
Pachon Sky Camera Christopher Stubbs Chuck Claver Jan 25, 2014.
1 PreCam Update: Simulations Douglas Tucker, DES-Calib Telecon, 28 Jan 2008 Courtesy: NOAO/AURA/NSF UM Curtis-Schmidt SMARTS 1m SMARTS 1.5m SMARTS 0.9m.
Jim Annis for the DES Collaboration BIRP Meeting August 12, 2004 Tucson Design of the Dark Energy Survey James Annis.
The Photometric Calibration of the Dark Energy Survey D. L. Tucker 1, S. S. Allam 1, J. T. Annis 1, R. Armstrong 2, J. P. Bernstein 3, E. Bertin 4, D.
AST3-1 photometry from Dome A Bin Ma, Peng Wei, Yi Hu, Zhaohui Shang NAOC AST3
Data Analysis Software Development Hisanori Furusawa ADC, NAOJ For HSC analysis software team 1.
The Active Optics System S. Thomas and the AO team.
Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,
W. Wester, Fermilab DES Callibration Meeting Jan 18, DECal scans update The DECal flat field system is capable of generating system response maps.
1 Followup to Filters & Calibration Strategy Workshop: Calibration Douglas L. Tucker DES Calibration Workshop 13 June 2008.
1 The DES Calibrations Effort Douglas L. Tucker (DES Calibrations Scientist) DES NSF/DOE Review, 8-9 June 2009 The DES Calibrations Effort has connections.
1 Calibration and PreCam Douglas L. Tucker for the DES Calibrations and PreCam Survey Teams DES Collaboration Meeting ICG, Portsmouth 1 July 2011.
SITE PARAMETERS RELEVANT FOR HIGH RESOLUTION IMAGING Marc Sarazin European Southern Observatory.
VST ATLAS: Requirements, Operations and Products Tom Shanks, Nigel Metcalfe, Jamie McMillan (Durham Univ.) +CASU.
From photons to catalogs. Cosmological survey in visible/near IR light using 4 complementary techniques to characterize dark energy: I. Cluster Counts.
The Photometric Calibration of the Blanco Dark Energy Survey (DES) Purpose of Survey: Perform a 5000 sq deg griz imaging survey of the Southern Galactic.
SkyMapper. 2 2 What is SkyMapper? 1.35m telescope with a 5.7 sq. degree field of view Fully Autonomous observing To conduct the Southern Sky Survey: Five.
1 Galaxy Evolution in the SDSS Low-z Survey Huan Lin Experimental Astrophysics Group Fermilab.
HLA WFPC2 Source List Photometric Quality Checks Version: August 25, 2008 Brad Whitmore 1.Introduction 2.Comparison with Ground-based Stetson Photometry.
1 Small Telescopes and the Photometric Calibration of the Sloan Digital Sky Survey (SDSS) Douglas Tucker.
1 PreCam Flat Field QA Sahar Allam and Douglas Tucker 27 January 2011.
The Photometric Properties of NGC 6134 and Hogg 19 SDSS u’g’r’i’z’ Open Cluster Survey: Credit: Credit: SMARTS consortium.
SDSS-II Photometric Calibration:
IPHAS Early Data Release E. A. Gonzalez-Solares IPHAS Consortium AstroGrid National Astronomy Meeting, 2007.
Douglas Tucker (FNAL)Joint DOE/NSF Review, January Global Photometric Calibrations Douglas L. Tucker (FNAL) Joint DOE/NSF Review of DES
1 DES Standard Stars Discussion (see also DES-doc#7180) Douglas L. Tucker DES Collaboration Meeting 11 April 2013 (1:15PM)
Photometry and Astrometry: Bright Point Sources May 16, 2006 Cullen Blake.
1 Douglas L. Tucker DES Calibration Telecon 23 August 2013 Global Calibration Module (GCM) Photometric Zeropoints For SV-A1: Status Report.
1 Douglas L. Tucker DES Collaboration Meeting Sussex 20 October 2014 DES Photometric Calibrations: General, Y1A1, & atmCam.
GSPC -II Program GOAL: extend GSPC-I photometry to B = V ˜ 20 add R band to calibrate red second-epoch surveys HOW: take B,V,R CCD exposures centered at.
1 DES Calibrations: Remaining Loose Ends for Year 1 (Update: 23 March 2012) Douglas L. Tucker.
LSST CCD Chip Calibration Tiarra Stout. LSST Large Synoptic Survey Telescope Camera – 1.6 m by 3 m. 3.2 billion pixels kg (~6173 lbs) 10 square.
SDSS Stripe 82 and the Photometric Calibration of the Dark Energy Survey (DES) Douglas L. Tucker (FNAL), for the Dark Energy Survey Collaboration DES Collaboration:
The First Release of AST3 point source catalog from Dome A, Antarctica in 2012 MA Bin, WEI Peng, SHANG Zhaohui, LIU Qiang, HU Yi (NAOC) 973 课题二
CCD Calibrations Eliminating noise and other sources of error.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
JWST Pipeline Overview
A “Field Guide” to WFPC2 HLA Image Anomalies
WFCAM Photometric Calibration
WFCAM Photometric Calibration
LSST Photometric Calibration
Karen Meech Institute for Astronomy TOPS 2003
Presentation transcript:

1 PreCam Results & Plans (Version: 9 May 2011) Douglas L. Tucker (FNAL) DES Directors’ Council Review May 2010

2 The PreCam Survey Strategy as Originally Planned Credit: Jim Annis I. Aug 11-31: h/w install. and commiss.; Sept 1-15: on-sky commissioning I 10x in each filter (~6x under photometric conditions)

3 August-September Problems SIMPLE = T / conforms to FITS standard BITPIX = 16 / array data type NAXIS = 0 / number of array dimensions EXTEND = T … RA = '25:0:0.0' / [HH:mm:ss.ss] RA for center of this detector DEC = '91:0:0.0' / [DD:mm:ss.ss] Dec for center of this detector … Poorly Manufactured 2ndary MirrorBroken Shutter FITS header problems, (esp. w.r.t. adding RA,DEC from Curtis-Schmidt TCS) Image Credit: J. Annis, M. Schubnell Photo Credit: D. Rojas

4 1.Safely shipped PreCam, PreCam computers, PreCam CCDs, and auxiliary equipment to CTIO and mounted on the Curtis-Schmidt (C-S). 2.Hardware upgrades to C-S, including new TAMU dome flat system. 3.Quick Reduce and data transfer installed on PreCam computers 4.Preliminary observing scripts written. August-September Successes 5.Realigned optics with powerful new quantitative technique. 6.Identified problems to be fixed. 7.PreCam on sky! 8.Built successful PreCam team! Credit: S. Allam

5 Final PreCam Survey Strategy (original, smaller secondary mirror; less time) c. Nov 25 – Jan 20 was devoted to Stripe 82 and 30° grid Stripe 82: 10x in grizy 30° grid: 6x in gri I I. Aug 11-31: h/w install. and commiss.; Sept 1-15: on-sky commissioning Sept 1-27 was devoted on-sky commissioning and debugging of h/w Nov 16-c. Nov 24 was devoted s/w commissioning and on-sky tests.

6 Nov-Jan: The Data 64 nights allocated (Nov 16-Jan 20 minus Dec 24-25) 1 night lost to weather 2 nights lost to software meltdown on original DAQ computer 2 nights lost to shutter breaking 4 nights devoted to engineering due to shutter-sticking 1 night lost due to venting dewar to ambient atmospheric pressure 1 night lost due to problems with installing new 12-channel DAQ card 2 nights devoted to end-of-run engineering tests 51 nights on sky (c. 80% of the 64 nights allocated) ~24,000 images

7 Actual PreCam Coverage as of Jan 20 Originally Planned

8 Actual PreCam Coverage as of Jan 20 Final (i-band) Originally Planned

9 Actual PreCam Coverage as of Jan 20 gri yz

10 Actual PreCam Coverage as of Jan 20 Jan 12 gri Tile 1: Tile 2: Tile 3: Tile 4: Tile 5: Tile 6: Tile 7: Tile 8: Tile 9: Tile 10: After Jan 12, we pursued a modified tiling strategy, so these exposures do not show up. These post-Jan 12 exposures are primarily in the South-East corner of the PreCam grid pattern.

11 Data Processing DES-Brazil Effort The official data processing. Uses a PreCam-specific version of the Quick Reduce Pipeline. Quick Reduce in turn uses the DESDM code. FNAL/ANL Effort R&D effort using custom scripts in order to understand the data and obtain some quick results. Provides feedback to the official data processing. “Golden Nights” A set of 5 nights with robust FITS headers, no known problems, and target observations in SDSS Stripe 82. Used by both data processing efforts for rapid testing and algorithm development.

12 Results: Horizontal Banding & Streaking

13 Results: Horizontal Banding & Streaking

14 Results: Horizontal Banding & Streaking A Pretty Bad Case of Banding and Streaking Original Image After row-by-row overscan subtraction After horizontal streaking correction Credit: S. Allam & T. Biesiadzinski

15 A Pretty Bad Case of Banding and Streaking Results: Horizontal Banding & Streaking Original Image After row-by-row overscan subtraction After horizontal streaking correction Credit: S. Allam & T. Biesiadzinski

16 Results: Horizontal Banding & Streaking Horizontal banding & streaking affect ≈40% of the raw PreCam standard star field and science target images. After correcting, horizontal banding & streaking affect only about 6% of the processed images. Percent of images that were not recoverable Percent Bad MJD Credit: S. Allam

17 Results: Initial Photometry for a Single Image RMS(USNO40) = 0.04mag No corrections for: overall ZP color term star flat

18 Results: Photometry over a Full Night Credit: S. Kuhlmann, H. Spinka Night of 13 Jan 2011 UT. All data from that night matching the extended list of USNO u’g’r’i’z’ standards. Corrections for overall ZPs and for airmass (using site- average first-order extinction coefficients) No correction for color terms. RMS = 2-4% (mag < 13.0).

19 Results: SDSS-DES Color Terms

20 Synthetic color term relation plotted with (binned) observed color term relation from PreCam for the night of 15 Dec 2011 UT. The observations have relatively few blue stars compared with the Pickles stellar library. Credit: Huan Lin Results: DES-SDSS Color Terms

21 1.Quick Reduce Commissioning & Experience and Dramatic Improvement in the DES-Brazil Portal -First use of QR during live observing at CTIO 2.ObsTac Commissioning & Experience -Substantially increased efficiency -Basic design showed its flexibility -Survey Strategy: Full Moon crosses Stripe 82 (affects survey strategy for izy) 3.DECam Control System (CompactRIO) Experience -24K shutter exposures with no failures, plus Temp/Vacuum monitoring over 7 months 4.“Live-fire” Experience with SISPI and Related Observing Software -A special PreCam branch of SISPI 5.Observing run staffing and training -16-hour shifts combined with runs longer than 7 nights can be fatiguing, especially when hardware or software problems arise Accomplishments/Lessons Learned Relevant to DES Commissioning

22 Plans A segment of i-band PreCam observations in Stripe 82. Credit: S. Allam 1.Determine final detailed plan for official processing. 2.Finish processing data. 3.Analyze data. 4.Determine how much more observing time would be needed to achieve the original PreCam goals (esp. with regards to global relative calibrations of DES), and the consequences of de-scoping if that proves necessary. 5.It is likely that PreCam would need another full season – or two half seasons, since Aug/Sept 2011 might not be available? – to fully achieve its original goals.

23 Extra Slides

24 The PreCam Survey: Benefits to DES Courtesy: NOAO/AURA/NSF 1.Early on-sky tests with a “1/32 nd scale” DECam. a)Hardware, software, and observing experience (see bulleted list of Lessons Learned). 2.DES grizy standard stars (y-band in particular), supplementing the Stripe 82 standards and Smith et al. Southern u’g’r’i’z standards and permitting a much finer time-resolution of extinction measurements during DES operations a)DES survey strategy simulations indicate that DES nightly observations will cross a PreCam field about once an hour on average. b)These DES observations of PreCam fields reduces the need for additional dedicated standard star observations during the night by the Blanco – this can increase DES observing efficiency by up to 10%, or, in monetary terms, a savings of 10% x $10,000/night x 525 nights = $525,000. c)The PreCam sparse grid also provides improved spatial coverage of calibration fields throughout the DES footprint – any part of the DES footprint is that much closer to a calibration field. 3.Determinations of the transformations between SDSS griz and DES griz (via observations in SDSS Stripe 82). 1.Identification of candidate DA white dwarfs (in conjunction with SkyMapper u), useful for DES absolute calibrations. 2.Stars that can be used for “quick look” diagnostics of the DES data in during DES operations.

25 PreCam on the Curtis-Schmidt Credit: The Argonne Guys Photo Credits: R. Ogando

26 Results: Photometry in SDSS Stripe 82 Credit: S. Kuhlmann, H. Spinka Night of 7 Jan 2011 UT. 11 g-band images within SDSS Stripe 82. Corrections for overall ZPs and for airmass (using site-average first-order extinction coefficients) RMS = 9% (mag = ). No correction for color terms or for variations across focal plane.

27 Results: DES-SDSS Color Terms Credit: V. Bragança Synthetic color terms. Transmission curves from the PreCam set of 100mm x 100mm DES grizy filters. Stellar libraries from Gunn- Stryker (GS) and Pickles (PASP).

28 Credit: M. Maia 1. Quick Reduce & DES Portal were tested and substantially improved. Accomplishments/Lessons Learned Relevant to DES Commissioning

29 Credit: M. Maia Accomplishments/Lessons Learned Relevant to DES Commissioning 1. Quick Reduce & DES Portal were tested and substantially improved.

30 2. ObsTac substantially increased observing efficiency, and its basic design demonstrated its flexibility… Credit: E. Neilsen Accomplishments/Lessons Learned Relevant to DES Commissioning

31 Credit: E. Neilsen Accomplishments/Lessons Learned Relevant to DES Commissioning 2. ObsTac substantially increased observing efficiency, and its basic design demonstrated its flexibility…

32 A Processed i-band PreCam Image from Jan deg

33 More Examples: Before and After Horizontal Streaking Correction BeforeAfter Credit: S. Allam

34 More Examples: Before and After Horizontal Streaking Correction BeforeAfter Credit: S. Allam

35 More Examples: Before and After Horizontal Streaking Correction BeforeAfter Credit: S. Allam

36 More Examples: Before and After Horizontal Streaking Correction BeforeAfter Credit: S. Allam

37 More Examples: Before and After Horizontal Streaking Correction BeforeAfter Credit: S. Allam

38 More Examples: Before and After Horizontal Streaking Correction BeforeAfter Credit: S. Allam