AAE450 Spring 2009 Link Budget Michael Christopher -Communications Group -TLI Phase Group 1 OF 3Michael Christopher - COM.

Slides:



Advertisements
Similar presentations
INTEGRATED SURFACE DEPOSITION T Hr No blendingBlending (for 3 hours)
Advertisements

Do not use the first Task to define the Project Start Date Project always calculates from Project Start (Finish) Date Schedule from Project Finish.
Waxing vs. Waning of the Moon
AAE450 Spring 2009 Time to Complete 50m/s ΔV & 100g Payload System Overview Brittany Waletzko 100g Payload Integration Manager Translunar/OTV Phase Week.
AAE450 Spring 2009 Hopper Trajectory February 26, 2009 [Alex Whiteman] [Mission Ops] [Lunar Descent] Page 1.
Aolani “heavenly cloud” University of Hawaii Shantel Hunt, Nick Fisher, Dan Fong, James Ah Heong, Monica Umeda.
AAE450 Spring 2009 Preliminary Lunar Descent Attitude Control Analysis Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control.
AAE450 Spring 2009 Tony Cofer Power Group TLI Phase 03/05/09 Power Limitations for Arbitrary Payload Tony Cofer] [Power] page 1.
AAE450 Spring 2009 Lunar Descent Final Numbers Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 03/12/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Descent Trajectory Hover Trajectory LD Code Integration John Aitchison March 5 th, 2009 [John Aitchison] [Mission Ops]
AAE450 Spring 2009 Week 6 [Solomon Westerman] [PM] PDR Complete! Check the website if you have any mission requirement questions!
AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3.
Project X pedition Spacecraft Senior Design – Spring 2009
AAE450 Spring 2009 Lunar Capture Altitude Mass to LLO for Arbitrary Time to Rotate Lander During Descent Camera/Dust Removal [Kara Akgulian] [Mission Ops]
AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Presentation Notes 1.Good Q&A Becoming ‘experts’ on your system! 2.Give background information / assumptions [Solomon Westerman] [PM]
AAE450 Spring 2009 X 0 Power System Solar - Battery Solar arrays Tony Cofer- Power System.
AAE450 Spring 2009 Week 4 Project Timeline [Solomon Westerman] [PM]
AAE450 Spring 2009 Launch Vehicle Performance Payload Cannon Zarinah Blockton Mission Ops~Group Earth to LEO~Phase Rover ~Phase February 19, 2009.
AAE450 Spring 2009 Patch Antenna Pivot Michael Christopher -Communications Group -TLI Phase Group 1 OF 5Michael Christopher - COM.
AAE450 Spring Gram Lander CATIA Design Communications Group Trans Lunar Phase Group Toy Ball Analysis Lander CATIA Design Joshua Elmshaeuser Communications.
AAE450 Spring 2009 Communications Equipment Horizontal crash Trenten Muller Feb. 19, 2009 [Trenten Muller] [COM]
LEARN Kyle Parsons Intern 2 Learn & Work Study Coordinator.
Phase Difference = Phase Difference = 0.05.
Communication and Navigation System Doro Gracia Kazuya Suzuki Patrick Zeitouni.
INFILTRATION “The surface entry of water into the soil”
Lunar CRater Observation and Sensing Satellite Project LCROSS Site Selection Workshop Oct , 2006 NASA/ARC, Mountain View, California LCROSS Orbital.
Does this represent waxing or waning? Waxing & Waning Does this represent waxing or waning?
UPC TEAM Sustainable profit-making long-term plan Google Lunar X PrizeUPC Team.
AAE450 Spring 2009 BAE Single Board Computer Ground Based Systems Communications Group Trans Lunar Phase Group Joshua Elmshaeuser Communications 1.
AAE450 Spring 2009 Launch Vehicles Zarinah Blockton Mission Operations 1/29/2009 Blockton Ops.
The terminator is the moving boundary between day and night. Notice that it moves right to left. The moon does not make its own light. We see it because.
AAE450 Spring 2009 Communications Ground Stations Communication Equipment Alternative Landing Method March 26, 2009 [Trent Muller] [COM]
Moon Phases and Eclipses. Moon Phases  Half the Moon always is illuminated, but as it orbits us, our view of the bright half changes.
LUNAR MISSION TO CELEBRATE THE 50 TH ANNIVERSARY OF THE APOLLO 11 LANDING 01October2015.
Earth-Moon System Class Notes Students will be able to describe the major characteristics of the Moon.  I. Major Characteristics of the Moon 
AAE450 Spring 2009 Final Slide Concepts March 26, 2009 [Cory Alban] [Mission Ops] [Locomotion] 1.
Force of Gravity Pre-Lab Are the forces of gravity acting on the two students different? What is another term that means the force of gravity? Weight –
By: Blaze Sanders Commercial Space = “New Space” 10/15/2011.
LEQ: What phenomena do we experience on the Earth due to the motions of the Moon? Part 2 Phases of the Moon Key Terms: phases, waxing, waning.
How the moon affects earth.. Motions of the moon The moon rotates on its axis once every 27.3 days. The moon revolves around the earth once every 27.3.
AAE450 Spring 2009 Low Thrust Spiral Transfer Maneuvers and Analysis [Andrew Damon] [Mission Ops] February 5,
Chapter 1 Section 2 Phases, Eclipses, and Tides
AAE 450 – Senior Design J. Darcey Kuhn ERV Team – Communications January 23, 2001.
AAE450 Spring 2009 Brian Erson Attitude Control Systems Trans Lunar Phase Alternative Design Comparison [Brian Erson] [Attitude] 1.
AAE450 Senior Spacecraft Design Dorrie Byford Dorrie Byford Week 7: March 1 st, 2007 Communications Group Leader / Autonomous Rendezvous / Integration.
AAE450 Spring 2009 Lander CATIA Design Communications Group Trans Lunar Phase Group Space Ball Analysis Lander CATIA Design Joshua Elmshaeuser Communications.
Question 1: The tides are primarily caused by …
AAE450 Spring 2009 Kelly Leffel 2/5/09 Structures and Thermal Lunar Descent Phase Kelly Leffel Structures and Thermal 1.
Phases of the Moon and Eclipses LunarPhasesanhdEclipseAnimate.ppt.
AAE450 Spring 2009 Hydrogen Peroxide vs. Hydrazine Attitude Control Thrusters Brittany Waletzko Translunar/OTV Phase Week 5 Brittany Waletzko - ATT.
Bay of Fundy Video Notes
1. How was the Astronomy 1 quiz? (give details) 2. What are some physical characteristics of the moon? 3. How often does the moon Rotate/Revolve? 4. Write.
AAE 450 – Spacecraft Design 1 Solar Power & Docking Options Eric Gustafson 1/18/2005 Power group & docking sub-committee Solar power and autonomous docking.
Day/Night, Seasons, and Lunar Phases Web Quest. Day and Night Click on the link to explore facts about Day and Night and to help you fill in the Day and.
The Moon.
#1WEDDING PHOTOGRAPHY #2 PRE WEDDING SHOOTS #3 OUTDOOR SHOOT #4 HD PHOTOGRAPHY #5 HD VIDEOS.
Attitude, Lunar Transfer Phase
Rover/Lander Power Budgets
Lockheed Martin Challenge
Tides Tides are daily changes in the elevation of the ocean surface (sea level) Ocean tides result from the gravitational attraction exerted upon Earth.
Volcanic Lake ROV Product Design Specifications - Winter 2012.
Final Presentation Slides
Chapter 1-Lesson 3 HD Notes Answers
80504 林淑媛.
Data Representation Characters & Floating Point Numbers
World-Leading Research with Real-World Impact!
APOLLO SCENE SETTING.
Mercury.
Michael Walker February 28, 2008 Dynamics and Control Group Contact Monte Carlo Simulation Code AAE 450 Spring 2008 Dynamics and Control.
Presentation transcript:

AAE450 Spring 2009 Link Budget Michael Christopher -Communications Group -TLI Phase Group 1 OF 3Michael Christopher - COM

AAE450 Spring OF 3Michael Christopher - COM Total After Tele/Comnds [bits/sec][bytes/sec][MB/sec] Transmission Rate Transmission PhaseDirectionItemSize [MB]Time [sec]Time [min]Time [hr] TLI (Always)DownTelemetry Always TLI (Always)UpCommands Always Lunar Surface ComDownTelemetry Always Lunar Surface ComUpCommands Always Arrival MooncastDown8min Near Real Time Video7512, Arrival MooncastDown8min HD Video900152,542.42, Arrival MooncastDownPhotos Arrival MooncastDownXPF Set Asides101, Arrival MooncastUpData Uplink Set101, Arrival MooncastDownData Uplink Set101, Mission Complete MooncastDown8min Near Real Time Video7512, Mission Complete MooncastDown8min HD Video900152,542.42, Mission Complete MooncastDownPhotos After Lunar NightDownTelemetry Always After Lunar NightDownPhoto

AAE450 Spring OF 3Michael Christopher - COM Order of TransmissionTransmission PhaseDirectionItemSize [MB]Time [hr] 1Arrival MooncastDown8min Near Real Time Video Arrival MooncastDownPhotos Arrival MooncastDown8min HD Video Arrival MooncastDownXPF Set Asides Arrival MooncastUpData Uplink Set Arrival MooncastDownData Uplink Set Total for Arrival Mooncast Mission Complete MooncastDown8min Near Real Time Video Mission Complete MooncastDownPhotos Mission Complete MooncastDown8min HD Video Total for Mission Complete Mooncast After Lunar NightDownTelemetry E-09 11After Lunar NightDownPhoto50.24 Total for Post-Night Mooncast50.24