AAE450 Spring 2009 Week 6 [Solomon Westerman] [PM] PDR Complete! Check the website if you have any mission requirement questions!

Slides:



Advertisements
Similar presentations
Meeting Calendar All regular meetings will be on Thursday at 11 AM in MoSE 1226 Meetings are the second and fourth Thursday of every month. Check facebook.
Advertisements

AAE450 Spring 2009 Reliability Analysis Solomon Westerman, PM Week 5, 2/12/09 [Solomon Westerman] [PM] 1.
AAE450 Spring 2009 Final Presentation Draft Slides Description: Some draft slides and ideas 3/26/09 Kris Ezra Attitude 1.
AAE450 Spring 2009 Time to Complete 50m/s ΔV & 100g Payload System Overview Brittany Waletzko 100g Payload Integration Manager Translunar/OTV Phase Week.
AAE450 Spring 2009 Arbitrary Payload Cost Optimization to LLO Tasks: Payload Cost / Mass Optimization (Launch to LLO) Disprove Momentum Transfer Alternative.
LOGO Lent begins soon too!!. Announcements Ski trip = Phenomenal Success!!!! Mission Trip/Summer Camp 2010 – Orlando, July 11 th – 17 th – Spots still.
AAE450 Spring 2009 Lander Phase: Hybrid Propulsion System Propulsion System Sizing and Inert Mass Analysis Hopper and Rover Designs for 10kg Payload Hopper.
AAE450 Spring 2009 Week 9 [Solomon Westerman] [PM] Design Freeze on Thursday night!
AAE450 Spring 2009 Analysis of Trans-Lunar Spiral Trajectory [Levi Brown] [Mission Ops] February 12,
AAE450 Spring Attitude Control – Arbitrary Payload Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis Design.
AAE450 Spring Spinning Descent and Compressed Gas Hopper Christine Troy Assistant Project Manager Webmaster Lunar Descent Attitude Control Analysis.
AAE450 Spring 2009 Final Sizing and Trajectory Design for 100 g/10kg Payloads [Levi Brown] [Mission Ops] March 12,
AAE450 Spring 2009 Project X pedition Final slides outline for Orbital Transfer Vehicle Propulsion Week 11 Presentation Thursday, March 26, 2009 Brad Appel.
Today we will: Be introduced to the Unit Project;
AAE450 Spring 2009 Lunar Descent Final Numbers Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 03/12/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring Gram Mission Integration and Model Korey LeMond STRC/THM/INTEG GL [Korey LeMond] [STRC/THM/INTEG/CAD GL, OTV Phase] 1.
AAE450 Spring 2009 Cost Analysis, Redux Solomon Westerman Week9: 3/12/09 [Solomon Westerman][PM]Page 1/3.
AAE450 Spring 2009 Locomotion Alternatives Thursday February 19, 2009 Ryan Lehto Propulsion Group, Locomotion Phase, CAD Designer.
AAE450 Spring 2009 Hopper Design Alternative Josh Lukasak Attitude Group Lead Lunar Decent Phase Lead 02/26/09 [Josh Lukasak] [Attitude] (1)
AAE450 Spring 2009 Presentation Notes 1.Good Q&A Becoming ‘experts’ on your system! 2.Give background information / assumptions [Solomon Westerman] [PM]
AAE450 Spring 2009 Week 4 Project Timeline [Solomon Westerman] [PM]
AAE450 Spring 2009 Launch Vehicle Performance Payload Cannon Zarinah Blockton Mission Ops~Group Earth to LEO~Phase Rover ~Phase February 19, 2009.
AAE450 Spring 2009 Week 8 – Ahhhhhh! Only un-reprinted C&H strip!
AAE450 Spring Gram Lander CATIA Design Communications Group Trans Lunar Phase Group Toy Ball Analysis Lander CATIA Design Joshua Elmshaeuser Communications.
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 3 Tuesday 10/24 – Monday 10/30.
AAE450 Senior Spacecraft Design Project Aquarius Kowalkowski - 1 Mike Kowalkowski Week 10: March 27 th 2007 Project Aquarius Power Engineering Group Surface.
PHY Astronomy Lecture – Agenstein 109 Tuesday & Thursday 12:30 – 1:50 PM Lab – Agenstein 120 Tuesday 2:00 PM Thursday 2:00 PM Friday 2:00 PM Due.
Physics 121 Newtonian Mechanics Instructor Karine Chesnel April, 7, 2009.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
AAE450 Spring 2009 Launch Vehicles Zarinah Blockton Mission Operations 1/29/2009 Blockton Ops.
AAE450 Spring 2009 Low Thrust Spiral Transfer Maneuvers and Analysis [Andrew Damon] [Mission Ops] February 5,
Colorado Space Grant Consortium Gateway To Space ASEN / ASTR 2500 Class #30 Gateway To Space ASEN / ASTR 2500 Class #30 T+12.
Critical Design Review (CDR)
AAE450 Spring g Locomotion Thursday March 5, 2009 Ryan Lehto Propulsion Group, Locomotion Phase, CAD Designer.
AAE450 Spring 2009 Thermal Transport Subsystems Toy Ball System,100g Payload John Dixon COM GL, Loco PL [John Dixon] [COM GL] 1.
Final Slides By: Kara Akgulian Mission Ops Locomotion Phase 1.
Presented by: Stephen Crane City Administrator Downtown Lancaster Parking Study Completed by the International Transportation Engineering (ITE) UW-Platteville.
AAE450 Spring 2009 Launch Vehicle Selection Zarinah Blockton Mission Ops~Group Earth to LEO~Phase March 5, 2009.
Days of the week and my activities. Oscar Sada ESL 1 Mrs. Echeverry
Re-alignment of Responsibility Shift from Jan to Tony.
Vehicle Safety and Winter Driving Safety To ensure the security of vehicles parked in a facility parking lot should be locked when not in use. To ensure.
AAE 450 1/14/2010 Kathy Brumbaugh Chris Spreen AAE 450 Spring 2010.
AAE 450 3/30/2010 Kathy Brumbaugh Chris Spreen AAE 450 Spring 2010.
Payload Concept Review
[Cory Alban] [Mission Ops] [Locomotion]
Attitude, Lunar Transfer Phase
Three-Body Trajectory Model and Spiral Transfer Matching
Architecture Selection Logic
دانشگاه آزاد اسلامی واحد زاهدان
Lunar Descent Trajectory
The 9 steps to successful project implementation
Solomon Westerman, PM “Polished” Final Slide Layout Week 13.
By: Josh Lukasak Attitude Group Lead Lunar Descent Phase Manager
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
[Solomon Westerman] [PM]
[Solomon Westerman] [PM]
Solomon Westerman Week3 1/29/09
Alternative Locomotion Concept Feasibility Study
Really?! The Internet is full of useful information.
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Project Introduction Spring 2017.
[Solomon Westerman] [PM]
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Launch Vehicle Selection Spring Cannon Launch Vehicle Alternatives
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Unit Planning Update Updated , 2015.
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Supporters Timeline Week ___ ✓ Team Member Category Task Donors Board
Presentation transcript:

AAE450 Spring 2009 Week 6 [Solomon Westerman] [PM] PDR Complete! Check the website if you have any mission requirement questions!

AAE450 Spring 2009  Axel Rover Axel Rover  Design Alternative Week (1 st ) –POC’s: Good job getting analysis done on time –Make a lot of pots! –Don’t let your job description limit you!  Group Name / Logo –Aura –Corona –Blue Moon (sponsorship?)  Interest in T-shirts and/or Pins Week 6

AAE450 Spring 2009 Project Timeline 2/9/2008 TaskWeek 5Week 6Week 7Week 8Week 9 MWFMWFMWFMWFMWF PDR Complete Design Freeze (Mass/Power/Volume set) Draft Writing Evaluation of design alternatives (all phases) All design alternatives reach maturity and freeze Selection of final configurations Detailed analysis of X1, X2 Detailed analysis of final configurations

AAE450 Spring 2009  GL Meeting this AM –Most promising design alternatives are being pursued 1.Hopper design for Lunar Landing (Josh L.) 2.Higher initial parking orbit (Zarinah, Levi ) 3.Gimbaled EP engine (Kris E.)  Deliverable by Monday 8:00 PM (TBR) –75% design maturity –Code developed Week 6

AAE450 Spring 2009  Assign POC’s to brainstorming ideas (Take some from TLI phase) –Toy Ball (shift CM) (Cory) –Skidmark (shallow approach) (Trent) –Piston (compress working fluid) (Christine) –Ski (Use sled/ski/snowmobile to locomote) (Cory) –Cannon (shoot payload, spring/air/chemical prop, tethered or not) (Zarinah) –Separation (tx momentum to small vehicle to slow landing velocity) (Kris) –Accordion (large crumple zone) (Caitlyn) –Airbag (controlled velocity using breakable airbags) (Drew)  Progress report (by PM) Thursday  Deliverable by Monday 8:00 PM (TBR) –75% design maturity –Code developed POC’s for Brainstorming