Inti Lehmann University of Glasgow 27 June 2011 Status of the TOFs.

Slides:



Advertisements
Similar presentations
BigBite Hadron Detector Status Hall A Collaboration Meeting Xiaohui Zhan On behalf of the E collaboration MIT Jun 21, 2007.
Advertisements

Preparing the Big Bite Hadron Detector Package Gordon Lott, Virginia Tech Mentor: Douglas Higinbotham All the signals from the PMTs are sent via cable.
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
FToF Status Report CLAS Collaboration Meeting1 Test Results, Ongoing Work, Still To-Do, and More … FToF Progress Report CLAS Collaboration Meeting June.
Status of MRPC-TOF Wang Yi Department of Engineering Physics Tsinghua University, Beijing, China 1.
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
Prepared By: Kopila Sharma  Enables communication between two or more system.  Uses standard network protocols for communication.  Do.
Status at DORIS Hall New fixed cable channel on the floor for cables from outside to electronics hut Firedetection and network connections rerouted to.
Status at DORIS Hall Argus was removed by end of march Argus Parts (except 4 heavy pieces) shipped to Hall 1 Rails of electronics hut have to be extended.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
Beam Position Monitors MICE CM Harbin January, 2009.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
M. Bonesini1 TOF design updates M. Bonesini – INFN Milano.
M. Bonesini - MICE CM19 RAL 07/10/071 M. Bonesini INFN Milano PMTs tests in Milano (M. Bonesini, M. Rayner, S. Terzo)
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
April 2006Jean-Sébastien GraulichSlide 1 Pmts and Scintillators o Used Material in Geneva - Big Scintillator Slabs + Pmts - XP2972, 1” Pmts + Voltage Divider.
Status of CLAS12 PCAL project
FTOF – CABLE RUNS Joe Guerra. Terms/Definition FTOF – Forward Time of Flight PCAL – Pre-shower Calorimeter PMT – Photo Multiplier tube Panel 1A – Existing.
AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
Beam Profile Monitor Status Immediate Objective Materials needed Projections Conclusion Anthony Tatum University of North Carolina Wilmington.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Hybrid PMT Tests & Geometry Zisis Papandreou Detector Interface Meeting Bloomington, Indiana November 1 st, 2001.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Organising 904 RPC lab Ian 23 April Already done, ISR I3-I4 tunnel is empty. Move out and chamber/gap sorting done in the ISR. Manpower available.
Faculty of Physics, University of Belgrade General meeting, 19 th of May, Pixel/Connectors Checking Jovan Puzović, Faculty of Physics, Belgrade.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
DCal-ALICE integration and installation plan and status A. Tauro.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
Chamber Design and Integration RE3/1 and RE4/1
First of all we will remind some numbers:
Conceptual design of TOF and beam test results
Additional Upstream Coil Shielding
Additional Upstream Coil Shielding
RPC SYSTEM LAYOUT and DIMENSIONS
Seyoung Han / Ewha Woman’s Univeristy
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

Inti Lehmann University of Glasgow 27 June 2011 Status of the TOFs

Work done in May All scintillators  detached  re-aligned  secured with new brackets Short flasher fibres attached Modules moved to Doris Framing done Subframes moved into main frame All!? 34 TOF modules installed Inti LehmannOLYMPUS TOF Status 27/06/20112

Inti LehmannOLYMPUS TOF Status 27/06/20113 May 2011

Misalignment realised Observed effect  Chambers > TOF 17  Gap from target Huge mismatch: 10-25cm  TOF CAD  On-site (Michael) Explanation  Unsynchronised changes in CAD Solution  Move group 3 (modifying brackets, add. support)  Add TOFs #18 (add. cables, short by 1 in flasher) Inti LehmannOLYMPUS TOF Status 27/06/20114

Not beautiful but... Inti LehmannOLYMPUS TOF Status 27/06/20115

Status and to-do 34 TOFs in place  2 TOFs in preparation  Hardware to extend frames expected on Thu 72 HV cables and 70 signal cables labelled  Require ordering more signal cables  Route cables to hut 72 mu-metal shields ready  Mounting on top may prove difficult 7 (possibly) loose PMTs  Re-attachment started Flasher work  Light-coupler, electronics, route Tests Inti LehmannOLYMPUS TOF Status 27/06/20116

Inti LehmannOLYMPUS TOF Status 27/06/20117

Mismatch Inti LehmannOLYMPUS TOF Status 27/06/20118