Fuser Bearing Failure Analysis Kevin Argabright Michael Buonaccorso John Fitch Dean Justin Eichenberger.

Slides:



Advertisements
Similar presentations
Task 3.
Advertisements

ERGONOMICS :: WORKER TRAINING :: RISK FACTORS Risk Factors.
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
Jason Stoller Jon Stembel Fernando Contreras John Strong Brian Fischer.
Program Review & Budget Development Workshop A collaborative effort between Institutional Research, Fiscal Services, and Institutional Effectiveness For.
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
iGen Fuser Bearing Project P11511
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 2:20Introductions 2:25Project Description 2:35Customer Needs 2:40Risk.
Heart Valves Suppliers
IGen Fuser Bearing Project P Agenda Meeting Timetable Start Time Review Topic 3:30Introductions 3:35Project Description 3:45Customer Needs 4:00Risk.
1 CTIS # Prepared By John Yurtin Updated Connection Systems Training Vibration & Fretting Corrosion Vibration.
Build According To The Pattern. What Is A Pattern? To a builder --- a blueprint To a seamstress --- a pattern To a manufacturer --- the spec’s What happens.
For more info visit at For more info visit at
Group 1: Material Testing Device Jobe Dyson Brie Witherspoon John Chandler Brett Newstead.
1 April 2012 Quality assurance in education at NTNU.
Research? What’s Research?. Is this you??? How can we make sure we don’t end up like the tie-dyed bear?
Enquiries into profit and loss Geetha Venkataraman 1.
Reverse Engineering Assignment: Dissecting a PS3 Controller
Justin Hendirx. Program Space as Cost This book is Old! 2M, 400k The more space a program takes up is proportional to its cost. the builder must set size.
HBSD/IAD Scan Update IRRV Software Suppliers Forum 12 December 2006 Jan Ripley Housing Benefit Data Service.
Budget Request Presentation Student Executive Council 4/9/2014.
MTSU 1 Designing Quality Services. MTSU 2 The Nature of Services Services are unique Quality of work is not quality of service Service package contains.
JOHN DOE PERIOD 8. AT LEAST 80% OF HUMANITY LIVES ON LESS THAN $10 A DAY.
May 10, 2013P Xerox Bearing Tester Final Project Review.
{ Risk Management. Step 1. Identify the hazards Identify all hazards associated with the systems of work Risk Management Four Step Process.
Research and Development US Army Corps of Engineers ACOUSTIC CURRENT DOPPLER PROFILERS (ADCP’s)
DRAFT: KS1 Lesson 1: I want my hat back Lesson 1 For further info contact: See:
Copyright © 2014 by The University of Kansas Measuring Success: Evaluating Community Initiatives.
Test Plan SP1: Time To Train User Plan: Gather a group of people and teach them individually how to use the system. Document how long it takes each.
Temperature Controller for Contact us : (091) (011) , for more :
Contact Us.
Failure Mechanisms of Composite Cores for High Temperature, Low-Sag (HTLS) Conductors We have done research on two types of composite cores for HTLS conductors.
GLAST Large Area Telescope:
Pack Level (End Item Assembly) Testing
Find it useful? Give us your reviews through our contact info. Contact Us Call Us: Website:
The Advantages of a Trial Balance Software
Xerox Bearing Tester Final Project Review
How To Add A Xerox Printer To Google Chrome
Frio River Cabins - Frio Vacation Homes - Frio Country Resort
drainage lymphatique - 6Sense
Sample Presentation. Slide 1 Info Slide 2 Info.
Quicken Contact Help Number When you get such errors, you need to inspect the error carefully and then you should resolve it with step by step measures.
الوحدة 20 مهارات التواصل مع الآخرين
Quicken Technical Service More info :

Malwarebytes Support Phone Number
Top offshore mobile app development company in India
Osiz-Leading Mobile App Development Company in India
نام: عنوان طرح / شرکت.
© T Madas.
Xerox Bearing Tester Systems Level Design Review
and schedule appointment
זכויות סוציאליות.
راهنماي استفاده دانشجويان از سامانه
Systems Design Review 1/21/13 Attendees:
Spec Text Motion Date: Authors: March 2018 Month Year

Free and open to the public.
Quiz Review.
Measuring Success: Evaluating Community Initiatives
Geometry Three Dimensions
MIchaele gebre.
DISCIPLINE FLOWCHART FOR STUDENTS WITH DISABILITIES
Was the equipment purchased before 13th August 2005? No
Firebase Vs. MongoDB: Choose the Best Database of 2019

Meet Us
1. Get specs from customer Cost out the solution Decide discount strategy Assemble proposed response Approve proposed response.
Contact Us
Presentation transcript:

Fuser Bearing Failure Analysis Kevin Argabright Michael Buonaccorso John Fitch Dean Justin Eichenberger

What constitutes as a failure?  Physical vibrations, temperature, other factors? Contact info for acoustic fixture builders  To get guidance on how they worked through the problem Dimensions of acoustic fixture  Mainly where the bearing is attached to the fixture Contact info for bearing suppliers  To obtain specs for old and new bearings Contact info for bearing testers  To get info on how they decide failure criteria Any design specs that may give info on how the fuser bearings were selected for production What We Need

Project Flowchart