Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.

Slides:



Advertisements
Similar presentations
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
Advertisements

Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield.
Field measurements of QEA magnets at KEK Mika Masuzawa May 30, 2006.
Summary of MICE 4/4/2008 shift during the ISIS machine-physics period Goals for 04 Apr08 MICE shift: 1. Radiation survey in MICE Hall with target operating,
The MICE Target Lara Howlett University of Sheffield.
MICE TARGET OPERATION C. Booth, P. Hodgson, R. Nicholson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England.
The performance of Strip-Fiber EM Calorimeter response uniformity, spatial resolution The 7th ACFA Workshop on Physics and Detector at Future Linear Collider.
Photodetector Timing Resolution Burle Micro-Channel Plate Photo Multiplier Tubes (MCP-PMTs) H. Wells Wulsin SLAC Group B Winter 2005.
T2.4 Performance Test Running in R78. Timeline T2.4 installed in R First inspection on after 200k pulses Little or no wear/dust.
MERIT beam spot size (Saturations & projections) Goran Skoro 13 August 2008.
Low beam intensity (MERIT beam spot size – part II) Goran Skoro 30 June 2008.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Data Quality Assurance Linda R. Coney UCR CM26 Mar 25, 2010.
Page 1 Calculating the Beam Position at the Ecal for DESY Run (Independent of Tracking) Hakan Yilmaz.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
Target Monitoring and Control Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
MICE Target Report Chris Booth (for target team) Sheffield 24 th March 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MICO 9th Aug 2010J.S. GraulichSlide 1 MOM report o Last Week o Run Plan for this Week o Machine Physics Jean-Sebastien Graulich, Geneva.
Target Real Time software Current status DAQ card – NI 6254 Analog/Digital card Problems with Linux version drivers Currently reading up to 12 channels.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
VELO ADC vs Charge Calibration Jianchun Wang April 16, 2008 This is an update to the presentation at April 11 st VELO Group Meeting. A new scan data of.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM - M.ApollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Summary of MICE operations – 14/15 March 2008 AIMS - establish MICE beamline in ISIS synchrotron.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
14/1/20097 January 2009MICE CM23 - Harbin - Beamline Session1 MICE Beamloss Data Adam Dobbs.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
FLASH Toroid Review Progress since last meeting in April Next steps Summary Johnny Ng FLASH Coll. Mtg. 7/25/03.
MERIT analysis - Beam spot size Goran Skoro More details: UKNF Meeting, Oxford, 16 September 2008.
MICE Beamline Commissioning Linda R. Coney NFMCC Meeting 16 January 2010.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
Fast Electron Temperature Scaling and Conversion Efficiency Measurements using a Bremsstrahlung Spectrometer Brad Westover US-Japan Workshop San Diego,
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
CTB04: electron Data vs MC Stathes Paganis University of Sheffield LAr CTB04 WG 25-Aug-05.
7 May 2009Paul Dauncey1 Tracker alignment issues Paul Dauncey.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
First Look at FLASH Thick Target Test Beam (Jan 2004) Results The Alumina Underground Jan. 13, 2004.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Y. R. Roblin Hall A beamline and accelerator status.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
04/06/07I.Larin pi0 systematic error 1  0 error budget Completed items (review) Updated and new items (not reported yet) Items to be completed.
Fits to consec data In what follows the black line shows the mean and the rms of the double gaussian fit The green line (usually too small to be visible)
December, Calibration of electromagnetic calorimeter of Hall A DVCS experiment Eric FUCHEY Ph.D Laboratoire de Physique Corpusculaire.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
1Ben ConstanceCTF3 working meeting – 09/01/2012 Known issues Inconsistency between BPMs and BPIs Response of BPIs is non-linear along the pulse Note –
Beam-Based Calibration Screen calibration. Two screens with BPM in between. Scan beam position with upstream dipole/corrector. Absolute calibration. One.
CdTe prototype detector testing Anja Schubert The University of Melbourne 9 May 2011 Updates.
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
DESY BT analysis - updates - S. Uozumi Dec-12 th 2011 ScECAL meeting.
Doubling the Target Insertion Rate P J Smith for MICE VC 163.
Update on 50 um Sensor Calibration using LNLS Data Mathieu Benoit.
Momentum and Momentum Spread Measurements
EZDC spectra reconstruction and calibration
Update on TB 2007 Xtal Irradiation Studies at H4
HyCal Energy Calibration using dedicated Compton runs
DESY drift chambers efficiency and track reconstruction
High Level Physics Applications for LCLS Commissioning
Slope measurements from test-beam irradiations
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
Presentation transcript:

Target Operations A summary of Target Operation to Date Paul Hodgson The University of Sheffield

T1 Operation Dates Shift PurposeDateN Pulses Electronics commissioningFrom 28-Aug620 Beamloss/BCD scan05-Sep5364 Beamloss/BCD scan plus delay06-Sep Hz operation tests08-Sep1467 Beamline commissioning - 2V BL test10-Sep7333 1V beamloss for radiation survey12-Sep14644 Beamline commissioning - DAQ debugging16-Sep3218 DAQ debugging23-Sep459 Beamline commissioning25-Sep1129 Beamline commissioning27-Sep3465 Beamline commissioning29-Sep3818 Beamline commissioning01-Oct2549 Beamline commissioning03-Oct5859 Beamline commissioning04-Oct6833 Beamline commissioning05-Oct2150 Beamline commissioning05-Nov2320 Beamline commissioning06-Nov3222 Beamline commissioning07-Nov6030 Beamline commissioning11-Nov2178 Beamline commissioning17-Nov2306 Beamline commissioning18-Nov Timing Problem Calibrations Taken

Target Parameters Start position:x 1 Start time:t 1 Time beam on:TB 1 Time beam off:TB 2 BCD minimum:x 2 Time BCD minimum:t 2 Strike:s = x 2 – x 1 Strike time:t = t 2 – t 1 Acceleration:a = 4s/t 2 Run reduction code over the raw data to parameterise Can then plot interesting variables quickly TB 1 TB 2 x1x1 x2x2 t1t1 t2t2

BCD Histograms Histogram BCDs for a set value Clear difference between the two distributions Failing target has a much broader spread T2 distribution 3-4 times as broad Can be interpreted as a result of the target “sticking”

BCDs for T1 and T2 In each case the test runs were setup to pulse with a nominal BCD of mm Very different appearance for BCD time series plots for T1 and T2 T1 very stable BCD does not vary over time T2 BCD varies strongly over time Plot very “spiky” after ~42k pulses Clear signal for target failure T2 Commissioning Run

Calibration Histograms Fit double Gaussian to BCD by handWhy ? Trying to account for second population usually seen

Calibration Histograms Tricky to automate, usually need to tweak the fit start values by hand to get the fit to converge Obvious 2 nd peakMore ambiguous case

Is it better to simply fit a single gaussian or do no fit at all and use RMS ?

Another view of the Calibration Double Gaussian fit can pick out second population and gives better resolution for spread

Conclusions Have a simple method of spotting potential breakdown of the target This method is partially automated in current target DAQ – Thanks James Still needs an “experts eye” Don’t want to define some arbitrary failure value until we see how these measurements evolve